| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹23.3 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹23.5 L+₹25,894.33 (1.11%)Accepted-AOC | L-2 | Accepted-AOC L-2 |
Tender Value
₹23.7 L
EMD Value
₹2.4 L
Closing Date
22 Mar 2021, 10:00 amClosed
EE MGCCD-10, BSR
EE MGCCD-10, BSR
Construction of D.R.B. At km 8.500 of Saidpur Escape. For madhya ganga Canal Ist Stage Project.Lot-13
2021_UPIDC_567500_1
20/EE/20-21
Open Tender
Civil Works - Bridges
Item Rate
90 days
Bulandshahr
Please refer Tender documents.
3 documents required · 3 mandatory
₹854
₹2.4 L
25 Mar 2021
10 Mar 2021
22 Mar 2021
10 Mar 2021
22 Mar 2021
10 Mar 2021
Amount
Construction of VRB
Excavation in foundation in ordinary soil (Loan, clay or sand ) i/c lift upto 1.50 M.and lead 30 M. including filling watering and ramming of excavated earth into the trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge.
Laying CC 1:3:6 in Foundation using Stone ballast including cost of all materials, labour, T&p, etc. required for proper completion of work.
Brick work with M-150 Bricks in 1:4 CM mortar including cost of all materials, labour, T&p, etc. required for proper completion of work.
P/F Ordinary centering & shuttering for RCC & CC works including all labour T&P etc.required for proper completion of work.
Laying RCC 1:1.5:3 using Stone grit including cost of all materials, labour, T&p, etc. required for proper completion of work.
Laying CC 1:1.5:3 using Stone grit including cost of all materials, labour, T&p, etc. required for proper completion of work.
Steel Reinforcement for RCC work i/c cost of steel, bending,binding,cutting and placing in proper position etc. required for proper completion of work.
P/F 75 mm dia P.V.C.pipe in proper position for drainage spout i/c all material labour T&p etc. required for proper completion of work.
Struck deep cement pointing in 1:2 CM on surface including cost of all materials, labour, T&p, etc. required for proper completion of work.
Provoding and fixing of wheel guard including cost of all matariels labour, t&p, etc.
Earth work in embankment in ordinary soil excavation to be in the of regular pits and earth work in embankment to be in 20 cm. layers. Including ramming and dressinig the surface to the required levels and slopes and also including 1.50 m. lift and 30 m lead. The earth from cutting tobe used in making embankment or to be deposited as spoil bank whithin 30 m. distances as directed by Engineer-in-charge.
1st class brick work on edge soiling including all lead and lift proper complition of work .Ramp
Laying brick pitching all lead and lift, labour proper compilition of work.
Providing and fixing of sign board including cost of all materias, labour,t&p erc.
M/S SIROHI CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .