Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-AOC | ₹1.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹2.0 LRejected-AOC | ₹2.0 L | 2 | Rejected-AOC L2 |
| 3 | 3₹2.3 LRejected-AOC | ₹2.3 L | 3 | Rejected-AOC L3 |
| 4 | 4₹3.2 LRejected-AOC | ₹3.2 L | 4 | Rejected-AOC L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Work Name not Mentioned in Bid Validity Stamp |
| Sl No | Description | Qty | Unit | MOHD ABID L4 | M/S LAVANIYA TRADERS L1 | M/s SHRI GANESH CONSTRUCTION AND SUPPLIERS L2 | YASH TRADERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00Silt clearance of Saunjh drain from Km. 0.000 to 9.500 | |||||||
| 1.01 | Silt Clearence/trench Diggining including lift up to 1.50 m & lead upto 6.0m, for wet earth work excluding dewatering in underwater including cost of driver/assistant driver, POL, maintenance of machine, contractor profit taxes etc but excluding leveling,dressing & compaction by Pocklin/equivalent capacity 60cum/hour ie 2280/60 (Rs. 2280 per hour), with Rough/Partial dressing (especially in case of drains) | 9,863.2 | cum | 32.2 ₹3.2 L | 18.03 ₹1.8 L | 19.65 ₹1.9 L | 23.5 ₹2.3 L |
| 1.02 | Scraping internal section of exisiting channel i.e. bed and side slope with silt up to 5 cm | 1,080 | sqm | 3 ₹3,240 | 1.94 ₹2,095.20 | 2.8 ₹3,024 | 2.5 ₹2,700 |
Tender Value
₹4.2 L
EMD Value
₹8,380
Closing Date
9 Feb 2026, 11:00 amClosed
Executive Engineer Drainage Division Etah
Office,Executive Engineer DD Etah
Silt Clearance of Saunjh Drain From km. 0.000 to km 9.500
2026_UPIDC_1109754_2
02/EE/2025-26
Open Tender
Civil Works - Others
Mainpuri
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹8,380
28 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
Silt clearance of Saunjh drain from Km. 0.000 to 9.500
Silt Clearence/trench Diggining including lift up to 1.50 m & lead upto 6.0m, for wet earth work excluding dewatering in underwater including cost of driver/assistant driver, POL, maintenance of machine, contractor profit taxes etc but excluding leveling,dressing & compaction by Pocklin/equivalent capacity 60cum/hour ie 2280/60 (Rs. 2280 per hour), with Rough/Partial dressing (especially in case of drains)
Scraping internal section of exisiting channel i.e. bed and side slope with silt up to 5 cm
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
BOQ_2054118.xls
BOQ • 0.21 MB
Download all tender documents and submit your bid