| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹2.0 L+₹16,907.18 (9.40%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹2.3 L+₹54,556.50 (30.3%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | 4₹3.2 L+₹1.4 L (78.3%)Rejected-AOC | 4 | Rejected-AOC L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Work Name not Mentioned in Bid Validity Stamp |
| Sl No | Description | Qty | Unit | MOHD ABID L4 | M/S LAVANIYA TRADERS L1 | M/s SHRI GANESH CONSTRUCTION AND SUPPLIERS L2 | YASH TRADERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00Silt clearance of Saunjh drain from Km. 0.000 to 9.500 | |||||||
| 1.01 | Silt Clearence/trench Diggining including lift up to 1.50 m & lead upto 6.0m, for wet earth work excluding dewatering in underwater including cost of driver/assistant driver, POL, maintenance of machine, contractor profit taxes etc but excluding leveling,dressing & compaction by Pocklin/equivalent capacity 60cum/hour ie 2280/60 (Rs. 2280 per hour), with Rough/Partial dressing (especially in case of drains) | 9,863.2 | cum | 32.2 ₹3,17,595.04 | 18.03 ₹1,77,833.5 Lowest | 19.65 ₹1,93,811.88 | 23.5 ₹2,31,785.2 |
| 1.02 | Scraping internal section of exisiting channel i.e. bed and side slope with silt up to 5 cm | 1,080 | sqm | 3 ₹3,240 | 1.94 ₹2,095.2 Lowest | 2.8 ₹3,024 | 2.5 ₹2,700 |
Tender Value
₹4.2 L
EMD Value
₹8,380
Closing Date
9 Feb 2026, 11:00 amClosed
Executive Engineer Drainage Division Etah
Office,Executive Engineer DD Etah
Silt Clearance of Saunjh Drain From km. 0.000 to km 9.500
2026_UPIDC_1109754_2
02/EE/2025-26
Open Tender
Civil Works - Others
Item Rate
Mainpuri
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹8,380
28 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
Silt clearance of Saunjh drain from Km. 0.000 to 9.500
Silt Clearence/trench Diggining including lift up to 1.50 m & lead upto 6.0m, for wet earth work excluding dewatering in underwater including cost of driver/assistant driver, POL, maintenance of machine, contractor profit taxes etc but excluding leveling,dressing & compaction by Pocklin/equivalent capacity 60cum/hour ie 2280/60 (Rs. 2280 per hour), with Rough/Partial dressing (especially in case of drains)
Scraping internal section of exisiting channel i.e. bed and side slope with silt up to 5 cm
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
BOQ_2054118.xls
BOQ • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .