Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | -31.10% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 LAdmitted-Finance | -26.51% | ₹1.7 L | L2 | Admitted-Finance |
| 3 | L3₹1.9 LAdmitted-Finance | -18.05% | ₹1.9 L | L3 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,740
Closing Date
25 May 2026, 4:00 pmClosed
Er ranjit singh
OFFICE OF THE XEN PWD RNB DIVISION RAMBAN
BOQ
2026_PWDJK_309553_14
E-NIT No. 16 of 2026-27 Dated. 08-05-2026
Open Tender
Civil Works
30 days
Natna
NIT
2 documents required · 2 mandatory
₹600
Yes
XEN PWD RNB DIVISION RAMBAN
₹4,740
Yes
27 Jun 2026
8 May 2026
26 May 2026
9 May 2026
25 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:.All kinds of soil | 10.59 | Cum | 479.3 | ₹5,075.79 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
(i) 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 1.23 | Cum | 7,275.25 | ₹8,948.56 |
| 0.0 | (ii) 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% boulders | 6.23 | Cum | 4,774.46 | ₹29,744.89 |
| 0.0 | (iii) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.66 | Cum | 5,202.9 | ₹8,636.81 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for:
i)Foundations, footings, bases for columns | 21.32 | Sqm | 286.35 | ₹6,104.98 |
| 0.0 | ii) Suspended floors, roofs, landings, balconies and access platforms | 6 | Sqm | 718.2 | ₹4,309.2 |
| 0.0 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 4 | Cum | 7,571.55 | ₹30,286.2 |
| 0.0 | Extra for brick work with common burnt clay bricks/cement concrete bricks in
superstructure above plinth level upto floor five level | 4 | Cum | 1,455.65 | ₹5,822.6 |
| 0.0 | Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand) | 3.72 | Sqm | 947.25 | ₹3,523.77 |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto/above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 118 | Kg | 123.2 | ₹14,537.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_1002134.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid