Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.9 LAccepted-Finance | 1 | Accepted-Finance Low | |
| 2 | 2₹15.6 L+₹68,966 (4.64%)Accepted-Finance S4018 NO 5 KATHIRESAN STREET GNANAMURTHY NAGAR AMBATTUR CHENNAI 600 053 | CHENNAI | CHENNAI | TAMIL NADU | 600053 | 2 | Accepted-Finance High |
Tender Value
₹37.0 L
EMD Value
₹36,970
Closing Date
28 Dec 2022, 3:00 pmClosed
The Commissioner
Colachel Municiplity Office
Providing of New 20w LED Street Lights fittings alone, fitting with line, and New EB Pole including E.B.Line in Colachel Municiplity.
2022_MAWS_265031_1
446/2022/E1
Open Tender
Electrical Goods/Equipments
Supply
270 days
Colachel Municiplity
III class and above
2 documents required · 2 mandatory
₹5,000
COMMISSIONER Colachel Municiplity
₹36,970
Colachel Municiplity Office
9 Jan 2023
17 Nov 2022
28 Dec 2022
17 Nov 2022
28 Dec 2022
17 Nov 2022
25 Nov 2022
Amount
Supply and delivery of 20W LED Street light fitting. with Minimum at 300mm length of 3 core 1sq.mm copper cable and Male connector including cost and conveyance of all materials complete as per Section 6 of Bid document standard technical Specification.
Supply and Delivery of 1.2 meter, 32mm dia GI Pipe, Bracket suitable for the LED fittings for 20W to 45W with 2 sets of GI clamps and necessary bolts and nuts
Installation of 20W- 45W LED fittings for new lights Labour Charges for One Lamp.
Supply, delivery and installation of 3 Core 1.5 Sq.mm copper cable with length of 2 meters with 2 Nos of bimetal hook connector in one end and IP 66 Female connector in the other end suitable to connect Male connector in the LED fittings as per technical specification ( New lights and Existing lights)
Supply and fixing of Street light controller in Three phase line With ISI Mark including cost and conveyance to all Accessories etc complete.)
Provisions for GST at 18%
Adding GST-18%
Description of Work / Item(s)
Amount
Schedule - B1 - Warranty Period (Upto 2 year) Annual Operation and Maintenance of Street lights with LED light fittings during warranty period only Labour (1st and 2nd year) for all lights in the project area
Annual Operation and Maintenance of three phase Street light controller during warranty period (1st and 2nd year)
Adding GST-18%
SABHARI ELECTRICALS
SABHARI ELECTRICALS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .