| Sl No | Description | Qty | Unit | V RADHAKRISHNAN L2 | R K SURESH L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF CHECKDAM AT PAZHATHOTTAM H/O HUBBATHALAI IN COONOOR PANCHAYAT UNION 2025-2026 | |||||
| 1.10 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15CM thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc including levelling the sites complete complying with standard specifications | 44.82 | Cum | 370 ₹16,583.40 | 369 ₹16,538.58 |
| 1.20 | Cement concrete 1:4:8 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc., | 11.56 | Cum | 7,410 ₹85,659.60 | 7,405 ₹85,601.80 |
| 1.30 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items. | 43.5 | Sqm | 740 ₹32,190 | 737 ₹32,059.50 |
| 1.40 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items. | 139.2 | Sqm | 1,480 ₹2.1 L | 1,474 ₹2.1 L |
| 1.50 | Cement concrete 1:3:6 (one cement three sand and six hard broken stone) using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc., | 82.83 | Cum | 7,720 ₹6.4 L | 7,717 ₹6.4 L |
| 1.60 | Cement concrete 1:2:4 using 20mm gauge hand broken granite stone jelly including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc., | 2.4 | Cum | 8,825 ₹21,180 | 8,822 ₹21,172.80 |
| 1.70 | Provision for Name Board and Photographic Charge | 1 | LS | 2,510 ₹2,510 | 2,500 ₹2,500 |
| 1.80 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,80,646 ₹1.8 L | 1,80,406 ₹1.8 L |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
19 Jan 2026, 3:00 pmClosed
bdo coonoor
bdo coonoor
CONSTRUCTION OF CHECKDAM AT PAZHATHOTTAM H/O HUBBATHALAI
2026_RDTN_642598_1
Hilly Panchayat 2025-2026
Open Tender
Civil Works
Pazhathottam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,000
Yes
panchayat Union coonoor
21 Jan 2026
13 Jan 2026
19 Jan 2026
13 Jan 2026
19 Jan 2026
13 Jan 2026
14 Jan 2026
CONSTRUCTION OF CHECKDAM AT PAZHATHOTTAM H/O HUBBATHALAI IN COONOOR PANCHAYAT UNION 2025-2026
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15CM thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc including levelling the sites complete complying with standard specifications
Cement concrete 1:4:8 using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc.,
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items.
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors with Cross bracings using mild steel sheets of size 90cms x 60cm and 10 gauge stiffened welded with mild steel angles of size 25mm x 25mmx3mm for boarding laid over silver oak (Country wood) Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification and as directed for the following items.
Cement concrete 1:3:6 (one cement three sand and six hard broken stone) using 40mm gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc.,
Cement concrete 1:2:4 using 20mm gauge hand broken granite stone jelly including watering wherever necessary and laid in layers not more than 15cm, thick, compacting etc.,
Provision for Name Board and Photographic Charge
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
PRICEBID.pdf
Tender Documents • 0.40 MB
TECHBID.pdf
Tender Documents • 0.79 MB
BOQ_769885.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid