Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 CrQualified | ₹16.0 Cr | L1 | Qualified MII |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
20 Jan 2023, 4:00 pmClosed
Procurement of Application Programming Interface
4237043
GEM/2023/B/2955752
Two Packet Bid
APIM Solution with subscription based Licenses as per the TPS requirement specified in the RFP,Addi
Unknown (Unspecified Location)
Total value wise evaluation
BOQ
11 documents required · 11 mandatory
2 yrs
₹100 Cr
₹100 Cr
20%
₹50 L
6 Apr 2023
6 Jan 2023
20 Jan 2023
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | APIM Solution with subscription based Licenses as per the TPS requirement specified in the RFP | Yearly APIM License Cost for 5 years including Technical Support | 5 | Pieces | SM5145946 | 30 |
| 2 | Additional yearly cost for subscription based license for every 100TPS over and above the TPS requirement specified in the RFP | Yearly incremental license cost including Technical Support | 1 | Pieces | SM5145946 | 15 |
| 3 | End to end Implementation including migration of proposed Solution including one year warranty. | Implementation Cost | 1 | Pieces | SM5145946 | 210 |
| 4 | Monthly L1 Onsite Engineer Cost post warranty for 2nd Year | Cost of 3 L1 resources for 2nd year | 36 | Pieces | SM5145946 | 365 |
| 5 | Monthly L1 Onsite Engineer Cost post warranty for 3rd Year | Cost of 3 L1 resources for 3rd year | 36 | Pieces | SM5145946 | 730 |
| 6 | Monthly L1 Onsite Engineer Cost post warranty for 4th Year | Cost of 3 L1 resources for 4th year | 36 | Pieces | SM5145946 | 1095 |
| 7 | Monthly L1 Onsite Engineer Cost post warranty for 5th Year | Cost of 3 L1 resources for 5th year | 36 | Pieces | SM5145946 | 1460 |
| 8 | Monthly L2 Onsite Engineer Cost post warranty for 2nd Year | Cost of 1 L2 resources for 2nd year | 12 | Pieces | SM5145946 | 365 |
| 9 | Monthly L2 Onsite Engineer Cost post warranty for 3rd Year | Cost of 1 L2 resources for 3rd year | 12 | Pieces | SM5145946 | 730 |
| 10 | Monthly L2 Onsite Engineer Cost post warranty for 4th Year | Cost of 1 L2 resources for 4th year | 12 | Pieces | SM5145946 | 1095 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_4237043.pdf
GEM_BID
rfp-apim_2023-01-06-18-04-27_b3154b157da18b4e805f191bc657cc78.pdf
BOQ
boq_2023-01-06-18-04-27_ace6ef6d55a30202fcccaadf00f2ee46.csv
BOQ
APIM_42fed792-9de3-406f-b7331673009406152_SM5145946.docx
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid