| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹39.3 LAccepted-AOC | ₹39.3 L | 1 | Accepted-AOC AOC |
| 2 | 2₹39.9 LRejected-AOC 502 FLOWER VALLEY COMPLEX EASTERN EXPRESS HIGHWAY NEAR BANTA COMPOUND KHOPAT THANE WEST 400601 | THANE | THANE | MAHARASHTRA | 400601 | ₹39.9 L | 2 | Rejected-AOC AOC |
| 3 | 3₹40.5 LRejected-AOC NARANGAL TA NAIGAON KH DIST NANDED PIN 432709 | NANDED | NANDED | MAHARASHTRA | 432709 | ₹40.5 L | 3 | Rejected-AOC AOC |
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
11 Feb 2026, 5:00 pmClosed
EEZPWORKSDIVBHOKAR
EEZPWORKSDIVBHOKAR
Approch Road with CD Work to SH 259 to Chakri VR 105 km 0/00 to 1/00 Tq Hadgaon Dist Nanded
2026_NANDE_1274547_5
ZPN/WD/Bho/e.TEN16/OPEN/25-26
Open Tender
Civil Works
180 days
Approch Road with CD Work to SH 259 to Chakri VR 1
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
₹40,000
13 May 2026
4 Feb 2026
12 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. Spec. No.: MORTH 201 SSR No.2.09 P.No. 23
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. Spec. No.: MORTH 309 SSR No.2.18 P.No. 24
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately etc. complete. Spec. No.: MORTH 202 SSR No.3.11 P.No. 28
Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97 % of standard Proctor density after laying them in layers of 20 cm. to 30 cm. with vibratory roller. Spec. No.: MORTH 305 SSR No.2.23 P.No. 24
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/ Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- Plant Mix Method and Grading - I Material Spec. No.: MORTH 401 SSR No.3.01 P.No. 27
Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) Spec. No.: MORTH 305 SSR No.2.28 P.No. 25
Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for Foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) Spec. No.: Bd. E. 1 Page Number 287 SSR No.24.01 P.No. 175
Providing and laying in-situ M30 Grade unreinforced plain cement concrete pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate( natural sand/ VSI grade finely washed crushed sand) conforming to IS 383, using fine and coarse aggregates combined gradation as per Table 600-3 of MORTH Specification 2013, mixed in a batching and mixing plant/ non tilting mixer and Weigh batcher as per approved mix design, admixtures, transporting to site, spreading, laying with approved make paver,compacted and finished in a continuous operation, finishing to lines and grades as directed by Engineer-in-charge and curing by curing compound /by providing cement vata in cement Mortar 1:8 @0.6m X 0.6m centre to centre, admeasuring 80 mm at bottom and 40 mm at top with depth of 75mm and maintaining the same throughout curing period by any other method approved by Engineer-in-charge. Spec. No.: MORTH 602 SSR No.5.01 P.No. 37
Providing and fixing in position TMT FE 500, 25mm dia dowel bars precoated with anticorrosive epoxy paint of required Dia. 60 cms. Long and at 30.00 cm. C/C and wherever directed including handling, straightening, necessary cutting supported by TMT FE 500, chairs with proper alignment by using properly designed assembly of Bulkheads lubricating half length with bituminous paint as directed etc. complete. Spec. No.: MORTH 602.6.5 SSR No.5.15 P.No. 43
Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm. .in concrete slab using concrete cutting machine with diamond studded saw within 48 hours of casting of bay / slab etc. complete including subsequent widening of the groove 8 to 10 mm. wide at top having depth of 15 mm. as directed by Engineer incharge. Spec. No.: MORTH 602.6.3 & 602.6.4 SSR No.5.17 P.No. 43
Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS : 5212 - 1989 into sawed groove widened at top for sealent reservoir of specified size and shape as per detailed drawing including fixing Polyethylene foam backer rod of required diameter (appraox. 25% larger than the initial 3 mm.to 4 mm. joint) overlaid with bond breaking tape as per detailed drawing. Item includes cleaning the joints with water jet / air compressor and allowing joint to become thoroughly dry before sealent is applied and applying primer. (A) Contraction and longitudinal joints (15 mm. deep x 8 mm.wide) Spec. No.: MORTH 602.6.3 & 602.6.4 SSR No.5.18 P.No. 44
Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. ( By /manaual Means ) a) Upto 1.50m lift Normal Rate Spec. No.: BR.3 Page Number 102 SSR No.12.02a P.No. 84
Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. Spec. No.: As directed by Engineer in charge. SSR No.21.40 P.No. 157
Providing and laying in situ / ready mix cement concrete of M-10 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum type mixer with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ) Spec. No.: CD.-3 Page.No. 160 SSR No.11.02 P.No. 81
Providing cast in situ / ready mix M20 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA Spec. No.: CD 8 Page 163 SSR No.11.29 P.No. 83
Providing cast in situ / ready mix M10 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc ), cement 4.05 bags/cumt) Spec. No.: CD 8 Page 163 SSR No.11.28 P.No. 83
Providing and laying cement concrete pipe of IS 458:2003 NP-3 class of 800mm diameter in proper line, level and slope etc. complete. Spec. No.: CD.7 Page.No. 162 SSR No.11.15 P.No. 82
A) For Sand = Royalty + Surcharge (2%) + Distt. Mineral Foundation Cess (10%) = 211.95 + 4.23 + 21.19 = 237.37 Per Cum.
B) For All Other Minerals = Royalty + Surcharge (2%) = 211.95 + 4.23 = 216.18 Per Cum.
Laboratory Testing Charges etc. Metal
Laboratory Testing Charges etc. Metal
Murum
ADD FOR GST 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.44 MB
Details_tender_notice1_Bhokar.pdf
Tender Documents • 12.04 MB
BOQ_2193905.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid