Loading…
Loading…
Updated dates
Tender Value
₹7.8 L
EMD Value
₹15,579
Closing Date
29 Jun 2026, 5:00 pm5d left
Similar tender results from the same govt authority in the past 3 years.
Zonal Chief Engineer, JVVNL, Bharatpur
132 KV GSS, Near Motujheel, Bharatpur
CONSTRUCTION OF 33 11 KV GSS IN THE PREMISES OF 132 KV GSS KARAULI and ERECTION or LAYING OF ASSOCIATED 33 KV AND 11 KV LINES ON ARC BASIS under AEN HTM JPD KARAULI in the jurisdiction of KARAULI Circle of Jaipur Discom.
2026_JVVNL_564885_1
JPD/ZCE(B/Z)/JVVNL/TN-69
Open Tender
Electrical Works
Karauli
Please refer tender Doucments
3 documents required · 3 mandatory
₹2,950
Accounts Officer, JVVNL, Bharatpur
₹15,579
8 Jun 2026
8 Jun 2026
30 Jun 2026
8 Jun 2026
29 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Part - A - For the construction of 33/11 KV Sub-Station with 2 x 5 MVA Power T/F | - | - | - | - | - |
| 2 | Excavation of pit in Hard soil | - | - | - | - | ARC CH. 2.2 |
| 3 | (B) Lattice Tower /Size of pit | - | - | - | - | - |
| 4 | 11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep | 50 | Pit | 335.69 | ₹16,784.5 | ARC CH. 2.2.7 |
| 5 | Earth work excavation and foundation of platfrom of transformers and brakers including dressing of sides and ramming of bottoms .Liftup to 1.5 Meter including taking out the excavated soil and depositing and refilling of jhiri, watering and ramming and disposal of surplus excavated soil as directed with in a lead of 50 Meter. | - | - | - | - | ARC CH. 2.5 |
| 6 | Hard /dense soil | 70 | Cum | 77.04 | ₹5,392.8 | ARC CH. 2.5.2 |
| 7 | Providing and laying cement concrete including compaction etc, complete using stone aggregate 40 mm nominal size (hand broken ) in foundation plinth excluding the cost of shuttering using 1 cement:5 sand: 10 aggregate mix. | 40 | Cum | 2,371.19 | ₹94,847.6 | ARC CH. 2.6 |
| 8 | Plaster on new surface on walls in cement ,sand mortar 1:6 including racking of joint etc. complete fine finsh 25 mm thick. | - | - | - | - | ARC CH.2.7 |
| 9 | The rates for complete work including racking of joints,curing,grinding,mixing and finishing T&P and scaffolding material and cost of material with all lead and lift. | - | - | - | - | ARC CH.2.7.1 |
| 10 | The rates cover protection of all place and things,requiring protection and cleaing such places and thing of all droppings and splashes of mortar etc. | 30 | Sq.Mtr | 128.32 | ₹3,849.6 | ARC CH.2.7.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
specification69.pdf
Tender Documents • 2.33 MB
BOQ_1005365.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid