Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Fee/PreQual/Technical/Finance 12 30 126 A CHAMANLAL KI KUAN | -20.00% | ₹4.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.5 L+₹26,623.98 (6.25%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹4.5 L+₹26,623.98 (6.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹4.5 L+₹26,623.98 (6.25%)Admitted-Fee/PreQual/Technical/Finance 561 8 | KANPUR | KANPUR NAGAR | UTTAR PRADESH | -15.00% | ₹4.5 L+₹26,623.98 (6.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹4.5 L+₹26,623.98 (6.25%)Admitted-Fee/PreQual/Technical/Finance 116 228 ANAND NAGAR RATPUR VILLAGE KANPUR | KANPUR | KANPUR | UTTAR PRADESH | -15.00% | ₹4.5 L+₹26,623.98 (6.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹4.5 L+₹26,623.98 (6.25%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹4.5 L+₹26,623.98 (6.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.3 L
EMD Value
₹53,248
Closing Date
17 Sept 2026, 3:00 pmClosed
Chief Engineer
Office Motijheel Nagar Nigam Kanpur
Construction of artificial pond for Ganesh idol immersion and Durga idol immersion at Panki Canal under Zone 6 Ward 23 Housing Development.
2026_NNKAN_1185010_1
352/AA-6/26-27
Open Tender
Civil Works
Fixed-rate
Ward 23
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹53,248
17 Sept 2026
12 Sept 2026
17 Sept 2026
12 Sept 2026
17 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work-E/W in Excavation in trenches for foundation pipe cable etc in ordinary soil (loan clay or sand ) including 1.5left and 50m and dressing Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of SO m.lncluding dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil.-Rate-215 per 1 Cum. | 270 | cum | 215 | ₹58,050 |
| 2 | Providing and laying 125 micron polythen sheet including all labour work Providing and laying 125 micron polythen sheet including all labour work-Rate-18.00 per 1 Sqm. | 12,800 | sqm | 18 | ₹2,30,400 |
| 3 | Barricating with ropes, ballies and bamboos etc all complete. Barricating with ropes, ballies and bamboos etc all complete.-Rate-50.00 per 1 Rmt | 240 | rmt | 50 | ₹12,000 |
| 4 | Earth Work-Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.-Rate-900 per 1 Cum. | 135 | cum | 900 | ₹1,21,500 |
| 5 | Dewatering of nala by deisel pump including heir charges of pump, pump operator fuel charges , cartage of pump at site etc all complete. Dewatering of nala by deisel pump including heir charges of pump, pump operator fuel charges , cartage of pump at site etc all complete.-Rate-228.00 per 1 Hours | 88 | hours | 228 | ₹20,064 |
| 6 | Labor-Pump Operator null-Rate-420 per 1 Per Day | 22 | per day | 420 | ₹9,240 |
| 7 | Add GST | 1 | Gst | 81,225.72 | ₹81,225.72 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.53 MB
BOQ_2229541.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .