Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹2.7 CrAccepted-AOC GOA | NORTH GOA | GOA | 403524 | ₹2.7 Cr | 1ST | Accepted-AOC 1st lowest |
| 2 | 2ND₹2.7 Cr+₹5.2 L (1.91%)Rejected-Finance BLDG NO 03 SF 3 SF 4 TECHNO CIDADE CHOGM ROAD ALTO PORVORIM BARDEZ GOA | NORTH GOA | GOA | 403524 | ₹2.7 Cr+₹5.2 L (1.91%) | 2ND | Rejected-Finance 2ND LOWEST |
| Sl No | Description | Qty | Unit | D K BHOMKAR L2 | BAGKIYA CONSTRUCTIONS PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00CIVIL WORKS | |||||
| 1.01 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 29 | 100 sq.m | 522.85 ₹15,162.65 Lowest | 532.86 ₹15,452.94 |
| 1.02 | Earthwork in excavation over areas by mechanical/mannual means at all depths in all type of strata comprising any of the materials such as soil, silt, sand, clay, gravels, moorum of all varieties, shingles, pebbles, all types of conglomerates, all types of laterite rock, soft rock, disintegrated rock, fissured/ shattered/ decomposed rock or weathered rock and all such other materials as described under appendix to these specifications whether in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including dressing of sides and ramming of bottoms, including getting out the excavated soil at all lifts, including pumping or bailing out water as directed by the Engineer on site including segregating the excavated earth along with crushed rock pieces of size 75mm and below and disposal of surplus excavated earth as directed by Engineer within a lead of 50mt and all lift and including breaking of excavated rock into boulders of size ranging from 150mm to 300 mm and stacking the broken boulders at a place specified by the Engineer on site etc. complete | 1,214 | cu.m | 411.56 ₹4,99,633.84 Lowest | 419.44 ₹5,09,200.16 |
| 1.03 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 971.2 | cu.m | 257.23 ₹2,49,821.78 Lowest | 262.15 ₹2,54,600.08 |
| 1.04 | Disposal of unserviceable material such as buiding rubbish,wood,earth excavated rock etc for all leads and lifts beyond 50m | 242.8 | cu.m | 382.16 ₹92,788.45 Lowest | 389.48 ₹94,565.74 |
| 1.05 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 723 | cu.m | 2,321.33 ₹16,78,321.59 Lowest | 2,365.77 ₹17,10,451.71 |
| 1.06 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 165 | cu.m | 5,444.78 ₹8,98,388.7 Lowest | 5,549.02 ₹9,15,588.3 |
| 1.07 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. | 148 | cu.m | 6,420.14 ₹9,50,180.72 Lowest | 6,543.05 ₹9,68,371.4 |
| 1.08 | Exposed decorative laterite masonry using Patradevi stone of size as specified and laid as directed by architect in cement mortar 1:4 (1 cement : 4 coarse sand) | 12 | cu.m | 10,192.43 ₹1,22,309.16 Lowest | 10,387.56 ₹1,24,650.72 |
| 1.09 | Providing, laying in position, line & level minimum 75mm thick using Patradevi type exposed laterite stone (350x300x160mm) of strength not less than 70 kg/cm2. cladding work ( machine cut edges/Hand dressed for wall lining etc. backing filled with a grout of 12mm cement mortar 1:4 (1 cement : 4 fine sand) including ruled pointing in white cement mortar 1:2(1 cement : 2 fine sand) with an admixture of pigment matching the stone shade brought to line and level. Including scaffolding as directed by the Engineer-in-charge,curing etc complete. | 76 | sq.m | 3,364.93 ₹2,55,734.68 Lowest | 3,429.35 ₹2,60,630.6 |
Tender Value
₹2.6 Cr
EMD Value
₹5.1 L
Closing Date
9 Oct 2025, 3:00 pmClosed
Executive Engineer
Paryatan Bhavan Pato Panaji Goa
Beautification and Illumination of Shree Sateri Ranganath Temple Vagon Kirlapal Dabal, Dharbandora Goa
2025_GTDCL_24699_1
GTDC/PC/EE-(S)/2025-26/e-44
Open Tender
Civil Works
Item Rate
270 days
Paryatan Bhavan Pato Panaji Goa
Please refer Tender documents.
7 documents required · 7 mandatory
₹15,000
₹5.1 L
2 Dec 2025
22 Sept 2025
10 Oct 2025
22 Sept 2025
9 Oct 2025
22 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .