Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAdmitted-Finance | ₹18.9 L | L1 | Admitted-Finance |
| 2 | L2₹20.0 L+₹1.1 L (5.56%)Admitted-Finance | ₹20.0 L+₹1.1 L (5.56%) | L2 | Admitted-Finance |
| 3 | L3₹21.3 L+₹2.4 L (12.5%)Admitted-Finance | ₹21.3 L+₹2.4 L (12.5%) | L3 | Admitted-Finance |
| 4 | L4₹21.5 L+₹2.6 L (13.8%)Admitted-Finance VILLAGE JALEL P O SHOGHI TEHSIL DISTT SHIMLA HP | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹21.5 L+₹2.6 L (13.8%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical overwriting in PWD registration and affdavit not submitted |
| Sl No | Description | Qty | Unit | Sanjay Govt. Contractor L2 | SUDHEER THAKUR L1 | Varun Rohal L4 | JASWANT SINGH L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of:
a) G.S. Sheet | 759.04 | sqm. | 72 ₹54,650.88 | 36 ₹27,325.44 Lowest | 50 ₹37,952 | 70 ₹53,132.8 |
| 2.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 10,520.94 | Kg. | 89.2 ₹9,38,467.85 Lowest | 91 ₹9,57,405.54 | 93 ₹9,78,447.42 | 105 ₹11,04,698.7 |
| 3.00 | Providing and fixing 0.60mm thick pre-painted steel sheet in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primer coating to back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with pre-painted iron J or L hooks, bolts and nuts 6mm dia. metre with pre-painted limpet and rubber washers complete with all accessories as required as per the direction of Engineer-in-charge. | 759.04 | sqm. | 1,080 ₹8,19,763.2 | 950 ₹7,21,088 Lowest | 1,300 ₹9,86,752 | 1,050 ₹7,96,992 |
| 4.00 | Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete:
a) Ridges plain (500-600 mm) | 29.09 | mtr | 420 ₹12,217.8 | 500 ₹14,545 | 300 ₹8,727 Lowest | 350 ₹10,181.5 |
| 4.01 | b) Flashings/Aprons. ( upto 600mm) | 89.9 | mtr | 400 ₹35,960 | 550 ₹49,445 | 300 ₹26,970 Lowest | 320 ₹28,768 |
| 4.02 | c) Barge board (upto 300 mm) | 183.08 | mtr | 400 ₹73,232 | 400 ₹73,232 | 300 ₹54,924 Lowest | 335 ₹61,331.8 |
| 4.03 | d) Gutter (600 mm over all girth ) | 75.53 | mtr | 780 ₹58,913.4 | 600 ₹45,318 Lowest | 750 ₹56,647.5 | 900 ₹67,977 |
| 5.00 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications :
a) Painting Steel work with Deluxe Multi surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture. | 54.92 | sqm. | 77 ₹4,228.84 | 71 ₹3,899.32 | 68 ₹3,734.56 Lowest | 90 ₹4,942.8 |
Tender Value
₹25.6 L
EMD Value
₹45,800
Closing Date
16 Mar 2026, 10:00 amClosed
Executive Engineer(Maint) HPU
Executive Engineer(Maint) HPU Shimla-5
Replacement of old CGI Sheet roofing with pre-painted sheet roofing of law faculty block in HP University, Shimla-5
2026_HPU_129724_1
Replacement of old C.G.I. Sheet roofing with pre-painted sheet rooing of law faculty block in HPU
Open Tender
Civil Works
Item Rate
90 days
summer hill
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer(Maint.)
₹45,800
21 Apr 2026
26 Feb 2026
17 Mar 2026
26 Feb 2026
16 Mar 2026
26 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Executive Engineer(Maint.) HP University, Shimla-5
Name of Work: Replacement of old CGI Sheet roofing with pre-painted sheet roofing of law faculty Block in HP University, Shimla-5.
Name of the Bidder/ Bidding Firm / Company : 100
Sl. No. Note :- During preparation of schedule of quantity a note regarding handling over of Serviceable G.I. roofing sheet scrap 1.82 mt. (approx.) @ 50648/- per mt. and Unserviceable G.I. sheet scrap 4250.64 Kgs. @ Rs. 16/- per Kg. to the contractor, for which amount of Rs. 160189.00 have to be credited to the work i.e. deducted from contractor’s gross bill amount Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: a) G.S. Sheet itemH1 759.04 sqm. Excess(+) Full Conversion INR
2 Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works itemH2 Kg. Excess(+) Full Conversion INR
3 Providing and fixing 0.60mm thick pre-painted steel sheet in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primer coating to back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with pre-painted iron J or L hooks, bolts and nuts 6mm dia. metre with pre-painted limpet and rubber washers complete with all accessories as required as per the direction of Engineer-in-charge. itemH3 sqm. Excess(+) Full Conversion INR
4 Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete: a) Ridges plain (500-600 mm) itemH4 mtr Excess(+) Full Conversion INR
4.01 b) Flashings/Aprons. ( upto 600mm) itemH5 mtr Excess(+) Full Conversion INR
4.02 c) Barge board (upto 300 mm) itemH6 mtr Excess(+) Full Conversion INR
4.03 d) Gutter (600 mm over all girth ) itemH7 mtr Excess(+) Full Conversion INR
5 Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : a) Painting Steel work with Deluxe Multi surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture. itemH9 sqm. Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
tenderdocument.pdf
Tender Documents • 18.68 MB
BOQ_191773.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .