| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.0 LAccepted-Finance | ₹90.0 L | L1 | Accepted-Finance LOWEST |
| 2 | L2₹92.4 L+₹2.4 L (2.66%)Rejected-Finance | ₹92.4 L+₹2.4 L (2.66%) | L2 | Rejected-Finance HIGH RATE BIDDER |
| 3 | L3₹92.7 L+₹2.7 L (3.01%)Rejected-Finance | ₹92.7 L+₹2.7 L (3.01%) | L3 | Rejected-Finance HIGH RATE BIDDER |
| 4 | L4₹95.4 L+₹5.4 L (6.02%)Rejected-Finance 01 SORANA NAKUR SAHARANPUR UTTAR PRADESH 247232 | SAHARANPUR | UTTAR PRADESH | 247232 | ₹95.4 L+₹5.4 L (6.02%) | L4 | Rejected-Finance HIGH RATE BIDDER |
| 5 | Rejected-Technical | - | - | Rejected-Technical Due to name of work in Affidavit-I is not correct. Due to Bid Capacity not being uploaded according to bid conditions. |
| Sl No | Description | Qty | Unit | M/S SINGH CONSTRUCTION COMPANY L4 | M/S RADHIKA CONSTRUCTION COMPANY L3 | Jagjeevan Prasad Verma L2 | M/s Ganesh Enterprises L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 4,113.44 | M3 | 60 ₹2,46,806.4 | 50 ₹2,05,672 Lowest | 72 ₹2,96,167.68 | 73.17 ₹3,00,980.4 |
| 2.00 | Centering & shuttering for C.C work & enclosed filter with cost of shuttering including all cost of material, labour, T&P etc required for proper complition of work. | 155.86 | M2 | 360 ₹56,109.6 | 320 ₹49,875.2 | 250 ₹38,965 Lowest | 325.2 ₹50,685.67 |
| 3.00 | Laying P.C.C 1:3:6 with cement, Hamirpur coarse sand and 20 to 40 mm Kabrai stone ballast with mixing, laying, ramming, curing etc including all cost of material, labour, T&P etc required for proper completion of work. | 104.1 | M3 | 8,000 ₹8,32,800 Lowest | 9,500 ₹9,88,950 | 9,800 ₹10,20,180 | 8,732.53 ₹9,09,056.37 |
| 4.00 | First class 150 Brick work in 1:4 C.M with cement & Hamirpur coarse sand including all cost of material, labour, T&P etc required for proper completion of work. | 685.5 | M3 | 6,000 ₹41,13,000 Lowest | 6,850 ₹46,95,675 | 6,620 ₹45,38,010 | 6,158.86 ₹42,21,898.53 |
| 5.00 | Centering & Shuttering for R.C.C work with cost of shuttering including all cost of material, labour, T&P etc required for proper complition of work. | 47.36 | M2 | 460 ₹21,785.6 Lowest | 1,000 ₹47,360 | 700 ₹33,152 | 813 ₹38,503.68 |
| 6.00 | Steel Reinforcement (Fe 415 TMT bar) for R.C.C work including cutting, bending, binding and placing of reinforcement in proper position with cost of binding wire and cost of steel including all cost of material, labour, T&P etc required for proper completion of work. | 2.31 | MT | 80,000 ₹1,84,800 | 85,500 ₹1,97,505 | 7,800 ₹18,018 Lowest | 72,011.48 ₹1,66,346.52 |
| 7.00 | Supplying & fixing 20 mm thick joint filler board including all cost of material, labour, T&P etc required for proper completion of work. | 42.19 | M2 | 1,200 ₹50,628 Lowest | 1,880 ₹79,317.2 | 1,500 ₹63,285 | 1,618.68 ₹68,292.11 |
| 8.00 | Laying R.C.C 1:1.5:3 with cement, Hamirpur coarse sand and 10 to 20 mm Kabrai stone grit with mechanical mixing, vibration, laying, curing etc including all cost of material, labour, T&P etc required for proper completion of work. | 20.56 | M3 | 8,500 ₹1,74,760 Lowest | 10,500 ₹2,15,880 | 11,000 ₹2,26,160 | 11,010.43 ₹2,26,374.44 |
| 9.00 | Laying C.C 1:2:4 with cement, Hamirpur coarse sand and 10 to 20 mm Kabrai stone grit with mixing, vibration, laying, curing etc including all cost of material, labour, T&P etc required for proper completion of work. | 7.93 | M3 | 8,500 ₹67,405 Lowest | 12,924 ₹1,02,487.32 | 10,700 ₹84,851 | 10,507.38 ₹83,323.52 |
| 10.00 | Cement pointing (struck deep) in 1:2 C.M with cement & coarse sand including all cost of material, labour, T&P etc required for proper completion of work. | 584.22 | M2 | 140 ₹81,790.8 | 139.52 ₹81,510.37 | 115 ₹67,185.3 | 111.32 ₹65,035.37 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
3 Aug 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
IX CIRCLE IRRIGATION WORKS BAHRAICH
Construction of VRB at km 0.795, km 1.410, PRB at km 2.540 and Tail Fall at km 3.020 on Shahpurpure Shivdeen Minor in District Shrawasti.
2026_UPIDC_1167986_3
01/SE-IX/2026-27
Open Tender
Civil Works
Item Rate
180 days
BHINGA, SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,307
₹2.2 L
IX CIRCLE IRRIGATION WORKS BAHRAICH
11 Sept 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 4,113.44 | M3 | 90 | ₹3,70,209.6 |
| 0.0 | Centering & shuttering for C.C work & enclosed filter with cost of shuttering including all cost of material, labour, T&P etc required for proper complition of work. | 155.86 | M2 | 400 | ₹62,344 |
| 0.0 | Laying P.C.C 1:3:6 with cement, Hamirpur coarse sand and 20 to 40 mm Kabrai stone ballast with mixing, laying, ramming, curing etc including all cost of material, labour, T&P etc required for proper completion of work. | 104.1 | M3 | 10,741.12 | ₹11,18,150.59 |
| 0.0 | First class 150 Brick work in 1:4 C.M with cement & Hamirpur coarse sand including all cost of material, labour, T&P etc required for proper completion of work. | 685.5 | M3 | 7,575.47 | ₹51,92,984.69 |
| 0.0 | Centering & Shuttering for R.C.C work with cost of shuttering including all cost of material, labour, T&P etc required for proper complition of work. | 47.36 | M2 | 1,000 | ₹47,360 |
| 0.0 | Steel Reinforcement (Fe 415 TMT bar) for R.C.C work including cutting, bending, binding and placing of reinforcement in proper position with cost of binding wire and cost of steel including all cost of material, labour, T&P etc required for proper completion of work. | 2.31 | MT | 88,575 | ₹2,04,608.25 |
| 0.0 | Supplying & fixing 20 mm thick joint filler board including all cost of material, labour, T&P etc required for proper completion of work. | 42.19 | M2 | 1,991 | ₹84,000.29 |
| 0.0 | Laying R.C.C 1:1.5:3 with cement, Hamirpur coarse sand and 10 to 20 mm Kabrai stone grit with mechanical mixing, vibration, laying, curing etc including all cost of material, labour, T&P etc required for proper completion of work. | 20.56 | M3 | 13,542.97 | ₹2,78,443.46 |
| 0.0 | Laying C.C 1:2:4 with cement, Hamirpur coarse sand and 10 to 20 mm Kabrai stone grit with mixing, vibration, laying, curing etc including all cost of material, labour, T&P etc required for proper completion of work. | 7.93 | M3 | 12,924.21 | ₹1,02,488.99 |
| 0.0 | Cement pointing (struck deep) in 1:2 C.M with cement & coarse sand including all cost of material, labour, T&P etc required for proper completion of work. | 584.22 | M2 | 136.92 | ₹79,991.4 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_2190573.xls
BOQ • 0.28 MB
LOT03.pdf
Tender Documents • 5.56 MB
BOQ_2190573.xls
PDF • 0.30 MB
DATE.pdf
PDF • 0.26 MB
BOQ03.xls
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .