Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
27 Jul 2026, 3:00 pm
SUPERINTENDING ENGINEER
IX CIRCLE IRRIGATION WORKS BAHRAICH
Construction of VRB at km 0.795, km 1.410, PRB at km 2.540 and Tail Fall at km 3.020 on Shahpurpure Shivdeen Minor in District Shrawasti.
2026_UPIDC_1167986_3
01/SE-IX/2026-27
Open Tender
Civil Works
180 days
BHINGA, SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,307
₹2.2 L
IX CIRCLE IRRIGATION WORKS BAHRAICH
13 Jul 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 4,113.44 | M3 | 90 | ₹3,70,209.6 |
| 0.0 | Centering & shuttering for C.C work & enclosed filter with cost of shuttering including all cost of material, labour, T&P etc required for proper complition of work. | 155.86 | M2 | 400 | ₹62,344 |
| 0.0 | Laying P.C.C 1:3:6 with cement, Hamirpur coarse sand and 20 to 40 mm Kabrai stone ballast with mixing, laying, ramming, curing etc including all cost of material, labour, T&P etc required for proper completion of work. | 104.1 | M3 | 10,741.12 | ₹11,18,150.59 |
| 0.0 | First class 150 Brick work in 1:4 C.M with cement & Hamirpur coarse sand including all cost of material, labour, T&P etc required for proper completion of work. | 685.5 | M3 | 7,575.47 | ₹51,92,984.69 |
| 0.0 | Centering & Shuttering for R.C.C work with cost of shuttering including all cost of material, labour, T&P etc required for proper complition of work. | 47.36 | M2 | 1,000 | ₹47,360 |
| 0.0 | Steel Reinforcement (Fe 415 TMT bar) for R.C.C work including cutting, bending, binding and placing of reinforcement in proper position with cost of binding wire and cost of steel including all cost of material, labour, T&P etc required for proper completion of work. | 2.31 | MT | 88,575 | ₹2,04,608.25 |
| 0.0 | Supplying & fixing 20 mm thick joint filler board including all cost of material, labour, T&P etc required for proper completion of work. | 42.19 | M2 | 1,991 | ₹84,000.29 |
| 0.0 | Laying R.C.C 1:1.5:3 with cement, Hamirpur coarse sand and 10 to 20 mm Kabrai stone grit with mechanical mixing, vibration, laying, curing etc including all cost of material, labour, T&P etc required for proper completion of work. | 20.56 | M3 | 13,542.97 | ₹2,78,443.46 |
| 0.0 | Laying C.C 1:2:4 with cement, Hamirpur coarse sand and 10 to 20 mm Kabrai stone grit with mixing, vibration, laying, curing etc including all cost of material, labour, T&P etc required for proper completion of work. | 7.93 | M3 | 12,924.21 | ₹1,02,488.99 |
| 0.0 | Cement pointing (struck deep) in 1:2 C.M with cement & coarse sand including all cost of material, labour, T&P etc required for proper completion of work. | 584.22 | M2 | 136.92 | ₹79,991.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_2190573.xls
BOQ • 0.28 MB
LOT03.pdf
Tender Documents • 5.56 MB
Download all tender documents and submit your bid