| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | ₹7.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.4 L+₹24,999.76 (3.52%)Rejected-AOC | ₹7.4 L+₹24,999.76 (3.52%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹7.4 L+₹25,133.68 (3.54%)Rejected-AOC | ₹7.4 L+₹25,133.68 (3.54%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹7.4 L+₹34,661.16 (4.88%)Rejected-AOC | ₹7.4 L+₹34,661.16 (4.88%) | L4 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SELVANAYAGI BUILDERS & DEVELOPERS L1 | P GIRIVEL L3 | S.P BUILDERS L2 | PRAVILA BULDERS L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Desilting the existing drain etc complete as per direction of departmental officers. | 6 | M3 | 108 ₹648 | 112.8 ₹676.8 | 112.75 ₹676.5 | 90 ₹540 Lowest |
| 2.00 | Dismantling the existing damaged Reinforced Cement Concerete slab etc., complete direction of departmental officers. | 4 | M3 | 4,311 ₹17,244 | 4,462.8 ₹17,851.2 | 4,462.27 ₹17,849.08 | 3,000 ₹12,000 Lowest |
| 3.00 | Dismantling the existing damaged Cement Concerete wall etc., complete direction of departmental officers. | 3 | M3 | 486 ₹1,457.03 | 504 ₹1,510.99 | 503.52 ₹1,509.55 | 400 ₹1,199.2 Lowest |
| 4.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 53 | M3 | 108 ₹5,724.22 | 112.9 ₹5,983.93 | 112.75 ₹5,975.98 | 100 ₹5,300.2 Lowest |
| 5.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base cOurse on well prepared surface and Compacting with vibratory roller to achive the desired density complete as per clasue |406 of MORTH SDecifications. | 4 | M3 | 1,823 ₹7,292 Lowest | 1,888 ₹7,552 | 1,886.8 ₹7,547.2 | 2,000 ₹8,000 |
| 6.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 3 | M3 | 5,068 ₹15,204 | 5,247 ₹15,741 | 5,246.33 ₹15,738.99 | 5,000 ₹15,000 Lowest |
| 7.00 | Supply of RCC precast box culvert for the inner vent size of 1500 x 1500 x 300mm thickness including transportation, Loading and Unloading etc., complete | 9 | M3 | 69,705 ₹6,27,345 Lowest | 72,160 ₹6,49,440 | 72,151.8 ₹6,49,366.2 | 75,000 ₹6,75,000 |
| 8.00 | Charges towards erecting the precast box culvert using crane etc., complete | 15 | Hrs | 2,040 ₹30,600 | 2,112 ₹31,680 | 2,111 ₹31,665 | 1,500 ₹22,500 Lowest |
| 9.00 | Conveying the excavated earth,desilting materials dismantling concrete from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 53 | M3 | 88 ₹4,664 Lowest | 92 ₹4,876 | 91.5 ₹4,849.5 | 100 ₹5,300 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
24 Jun 2026, 3:00 pmClosed
Assisstant Commissioner-West Zone
West Zone, Coimbatore Corporation
Construction of entrance in bus stand at maruthamalai Main Road in Ward no 38 of west zone.
2026_MAWS_681513_33
E1/WESTZONE/2026
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation
As per document attached
4 documents required · 4 mandatory
₹0
₹10,000
Yes
27 Aug 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
24 Jun 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Desilting the existing drain etc complete as per direction of departmental officers. | 6 | M3 | - | - |
| 2 | Dismantling the existing damaged Reinforced Cement Concerete slab etc., complete direction of departmental officers. | 4 | M3 | - | - |
| 3 | Dismantling the existing damaged Cement Concerete wall etc., complete direction of departmental officers. | 3 | M3 | - | - |
| 4 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 53 | M3 | - | - |
| 5 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base cOurse on well prepared surface and Compacting with vibratory roller to achive the desired density complete as per clasue |406 of MORTH SDecifications. | 4 | M3 | - | - |
| 6 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 3 | M3 | - | - |
| 7 | Supply of RCC precast box culvert for the inner vent size of 1500 x 1500 x 300mm thickness including transportation, Loading and Unloading etc., complete | 9 | M3 | - | - |
| 8 | Charges towards erecting the precast box culvert using crane etc., complete | 15 | Hrs | - | - |
| 9 | Conveying the excavated earth,desilting materials dismantling concrete from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 53 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.88 MB
SWD.pdf
Tender Documents • 0.85 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_819264.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .