Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | ₹8.2 L | L1 | Accepted-AOC AOC |
| 2 | L2₹8.6 LRejected-Finance | ₹8.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹8.8 LRejected-Finance 357 KOTKAPURA ROAD STREET NO 8 MUKTSAR PUNJAB 152026 | SRI MUKTSAR SAHIB | PUNJAB | 152026 | ₹8.8 L | L3 | Rejected-Finance L3 |
| 4 | L4₹9.3 LRejected-Finance | ₹9.3 L | L4 | Rejected-Finance L4 |
| 5 | L5₹9.6 LRejected-Finance | ₹9.6 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Ashok Kumar Contractor L3 | THE GILL CO-OP L AND C SOCIETY LTD L6 | RANDHIR SINGH CONTRACTOR L1 | THE BENIWAL CO-OP L/C SOCIETY LTD L7 | SHREE SHYAM INFRA TECH INDIA L2 | AARNA ENTERPRISES L4 | Chitrangna Infrastrure L5 | Hanuman Contractor L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.10 | Filling of sand in layer along boundary wall of Police line area along Barwala Chungi Flyover for strengthening of berm to prevent entry of storm water towards Police Line area including compaction of sand in layers (width of sand layer 4 feet and depth upto 3 feet ), sand bags if required complete in all respect as per full satisfaction of Engineer-in-Charge. | 300 | Per metre | 500 ₹1.5 L | 445 ₹1.3 L | 507 ₹1.5 L | 465 ₹1.4 L | 300 ₹90,000 | 250 ₹75,000 | 145 ₹43,500 | 800 ₹2.4 L |
| 1.20 | Silt Clearance of Storm water drain having 3 Mtr Width x 0.5 Mtr avg Silt Depth by using poclain machine (215 No.) in kacha drain upto bed level with driver, fuel charges and lubricant charges including jungle clearance from both berm if reachable , dressing of both drain bank for working space of poclain machine (215No.), cleaning under the bridges/Syphon upto the satisfaction of Engineer in charge and collecting of silt directly into the trolley if required and same disposing off from site to outside the city at non disputed area, if required complete in all respect. | 4,800 | Per metre | 120 ₹5.8 L | 160 ₹7.7 L | 112 ₹5.4 L | 170 ₹8.2 L | 130 ₹6.2 L | 147 ₹7.1 L | 160 ₹7.7 L | 170 ₹8.2 L |
Updated dates
Tender Value
₹9.9 L
EMD Value
₹19,889
Closing Date
23 Apr 2026, 11:00 amClosed
BALKAR
Hisar PHED No. 3
Silt Clearance of Storm water drain from CIRB Pond to South Byepass Storm Disposal and inside CIRB with 3 Mtr Width x 0.5 Mtr avg Silt Depth by using poclain machine (215 No.) in kacha drain upto bed level.
2026_HRY_515320_1
20267EDC0409 8C58 4669 A479 320B4FB3F9FC566PUH
Open Tender
Civil Works
60 days
Hisar
As Per DNIT
3 documents required · 3 mandatory
₹1,000
₹19,889
Yes
25 May 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Filling of sand in layer along boundary wall of Police line area along Barwala Chungi Flyover for strengthening of berm to prevent entry of storm water towards Police Line area including compaction of sand in layers (width of sand layer 4 feet and depth upto 3 feet ), sand bags if required complete in all respect as per full satisfaction of Engineer-in-Charge. | - | Per metre | - | - |
| 1.2 | Silt Clearance of Storm water drain having 3 Mtr Width x 0.5 Mtr avg Silt Depth by using poclain machine (215 No.) in kacha drain upto bed level with driver, fuel charges and lubricant charges including jungle clearance from both berm if reachable , dressing of both drain bank for working space of poclain machine (215No.), cleaning under the bridges/Syphon upto the satisfaction of Engineer in charge and collecting of silt directly into the trolley if required and same disposing off from site to outside the city at non disputed area, if required complete in all respect. | - | Per metre | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_594162.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid