| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.0 LAdmitted-Finance 44 AGAR NIWAS CIVIL LINE BALIPUR PRATAPGARH UTTAR PRADESH UP | -0.05% | ₹35.0 L | L1 | Admitted-Finance |
| 2 | L2₹35.0 LAdmitted-Finance H N0 93 A GROUND FLOOR NEW COLONY BABAGANJ MAKANDRUGANJ BABAGANJ PRATAPGARH UTTAR PRADESH 230001 | PRATAPGARH | UTTAR PRADESH | 230001 | -0.01% | ₹35.0 L | L2 | Admitted-Finance |
| 3 | L3₹35.0 LAdmitted-Finance | +0.01% | ₹35.0 L | L3 | Admitted-Finance |
Tender Value
₹35.0 L
EMD Value
₹3.5 L
Closing Date
15 May 2026, 5:00 pmClosed
Executive Officer Nagar Panchayat Lalganj PBH
Office Nagar Panchayat Lalganj Pratapgarh
ConstructionofCCRoadandcovereddraingeetanarsinghhometonaharInsalembhadariward
2026_DOLBU_1144124_1
81/NPL-2026-27 Date 23-04-2026
Open Tender
Civil Works
90 days
Lalganj Pratapgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,540
Yes
Executive Officer Nagar Panchayat Lalganj
₹3.5 L
Yes
22 May 2026
30 Apr 2026
16 May 2026
30 Apr 2026
15 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation for roadway in soil by mechanically means including cutting and pushing the earth to site of embankment up to distance 100m including triming botom and side slope in accordance with required line and grade Crossing | 106.47 | Cum | 167.7 | ₹17,855.02 | BI01010001010000000000000515BI0100001113 |
| 2 | Cement concrete in 1:6:12 mortar cement, sand with 40mm gauge brick ballast 1/c all complete. For wall as per S.I.No. 273 Crossing | 35.49 | Cum | 3,830 | ₹1,35,926.7 | BI01010001010000000000000515BI0100001118 |
| 3 | Class 150 Brick masonry work cement mortar 1:4 in foundation complete excluding pointing and plaster as per drawing and Technical specification Crossing | 80.73 | Cum | 6,471 | ₹5,22,403.83 | BI01010001010000000000000515BI0100001122 |
| 4 | Construction of granular sub-base by providing well graded Material, Spreeding in Uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | - | Cum | 2,607 | - | BI01010001010000000000000515BI0100001126 |
| 5 | Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 | 226.8 | Sqm | 7,770 | ₹17,62,236 | BI01010001010000000000000515BI0100001130 |
| 6 | Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 Crossing | 8.87 | Cum | 7,770 | ₹68,919.9 | BI01010001010000000000000515BI0100001134 |
| 7 | Plaster with cement mortor 1:4, 15mm thick on brick work as per technical specification clause 613.4 & 1204 | 180.9 | Sqm | 191 | ₹34,551.9 | BI01010001010000000000000515BI0100001138 |
| 8 | Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 | 35.49 | Cum | 7,770 | ₹2,75,757.3 | BI01010001010000000000000515BI0100001142 |
| 9 | Supply & fixing of mild steel Iron work in RCC work including all complete. S.I. No. 504 | 22.29 | qtl | 7,200 | ₹1,60,488 | BI01010001010000000000000515BI0100001146 |
| 10 | Disposal of exacavation earth work excess material & earth distance one km. | 53.24 | Cum | 164 | ₹8,731.36 | BI01010001010000000000000515BI0100001150 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_2137469.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid