Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Accepted-Technical | Accepted-Technical Accepted |
| 5 | Accepted-Technical IGOO | Accepted-Technical Accepted |
Tender Value
₹2.5 Cr
EMD Value
₹6.0 L
Closing Date
7 Apr 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Construction of concrete bund at Hunder Nallah from Panchayat Ghar to Laksosa.(Under SPD)
2026_PWD_18584_1
108 of I and FC Division Leh 2025-26
Open Tender
Civil Works - Canal
Percentage
120 days
LEH
Please refer to tender document
4 documents required · 4 mandatory
₹3,000
Payable To Executive Engineer InFC division Leh
₹6.0 L
17 Apr 2026
10 Mar 2026
9 Apr 2026
11 Mar 2026
7 Apr 2026
11 Mar 2026
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. A. All kindsof soil 50%.
B. Ordinary rock 45%.
C. Hard Rock 05%
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
Dry stone pitching (any thickness) excluding cost of stones.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for : A.Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Carriage of material by mechanical transport . A. Sand and stone agg an avg lead 20 kms.
B. Cement an avg lead 125 kms.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_44586.xls
BOQ • 0.28 MB
corri31.pdf
PDF • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .