Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC CHOTA KANTORE HEMTABAD DIST UTTAR DINAJPUR WEST BENGAL | HEMTABAD | UTTAR DINAJPUR | WEST BENGAL | 733130 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.5 Cr+₹66,722.60 (0.19%)Rejected-AOC SHANTINAGAR WARD NO 13 ISLAMPUR UTTARDINAJPUR | ISLAMPUR | UTTAR DINAJPUR | WEST BENGAL | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.7 Cr+₹25.6 L (7.34%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹3.8 Cr+₹29.5 L (8.45%)Rejected-AOC RAMKRISHNA PALLY ISLAMPUR DIST UTTAR DINAJPUR PIN 733 202 | ISLAMPUR | UTTAR DINAJPUR | WEST BENGAL | 733202 | L4 | Rejected-AOC L4 | |
| 5 | Rejected-Technical CHOTO KANTOR HEMTABAD HEMTABAD UTTAR DINAJPUR WEST BENGAL 733130 | HEMTABAD | UTTAR DINAJPUR | WEST BENGAL | 733130 | - | Rejected-Technical pls refer tech eva sheet |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
16 Mar 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER, CENTRAL CIRCLE
OFFICE OF THE SUPERINTENDING ENGINEER, CENTRAL CIRCLE,DEPARTMENT OF URBAN DEVELOPMENT and MUNICIPAL AFFAIRS, MUNICIPAL ENGINEERING DIRECTORATE,MUNICIPAL COMMERCIAL COMPLEX, 2ND FLOOR, N. S. ROAD, MALDA- 732101
Civil Construction Works for Proposed 19 TPD Municipal Solid Waste Processing Plant within Islampur Municipality in Uttar Dinajpur District, West Bengal
2026_MAD_1011737_1
6/SWM/SE(CC)/2025-26(2nd Call)
Open Tender
CIVIL WORKS
Percentage
365 days
ISLAMPUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7.0 L
Yes
OFFICE OF THE SUPERINTENDING ENGINEER, CENTRAL CIR
4 Jun 2026
21 Feb 2026
18 Mar 2026
23 Feb 2026
16 Mar 2026
27 Feb 2026
26 Feb 2026
365 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SOLID WASTE PROCESSING PLANT | |||||
| 1.01 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 1,555.2 | Sq.m | 10 | ₹15,552 |
| 1.02 | Cleaning and removing conservancy garbage mixed with rubbish & other filthy materials from the road side flank, drain and compound including cutting, loading, unloading to and from truck or cart by Mathor labour & removing thesame to any distance. | 1,000 | Cu.M | 56.62 | ₹56,620 |
| 1.03 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 449.1 | Cu.M | 119.27 | ₹53,564.16 |
| 1.04 | (b) Depth of excavation for additional depth beyond 1500 mm and up to 3000 mm but not requiring shoring. | 269.7 | Cu.M | 192.38 | ₹51,884.89 |
| 1.05 | Supplying and laying Polythene Sheet (150gm/sq.m.) over damp proof course or below flooring or roof terracing or in foundation trenches. | 1,692.66 | Sq.M | 24 | ₹40,623.84 |
| 1.06 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.Pakur variety | 21.37 | Cu.M | 5,430.77 | ₹1,16,055.55 |
| 1.07 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture]. Pakur variety i) M25 Grade | 160.9 | Cu.M | 6,437.95 | ₹10,35,866.16 |
| 1.08 | ii) M30 Grade | 268.79 | Cu.M | 6,615.08 | ₹17,78,067.35 |
| 1.09 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. i) In Ground floor | 151.2 | Sq.M | 328 | ₹49,593.6 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
wb2911compressed.pdf
Tender Documents • 0.75 MB
DWGcompressed.pdf
Additional Documents • 2.15 MB
BOQ_2484422.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .