Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance PLOT NO 21 5 6 ROAD NO 11 BAIGANWADI GOVANDI MUMBAI 400 043 | MUMBAI | MUMBAI | MAHARASHTRA | 400043 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical B702 EMBASSY CHS OPP ACHARYA ATRE GARDEN PANTNAGAR GHATKOPAR EAST MUMBAI 400075 | MUMBAI | MUMBAI | MAHARASHTRA | 400075 | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
3 Jan 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, NRG
Office of Director and Chief Engineer NRG, WIP, WMD, BARC, Trombay, Mumbai
Complete dismantling, shifting and storing of 1000Te Metallic compactor unit with all accessories, mountings and associated shielding at WMD, Trombay
2023_BARC_784486_1
BARC/NRG/PMTSS/SKP/2023/ P118894
Open Tender
Machineries/ Mechanical Engg Items
Works
153 days
WIP, BARC, Trombay, Mumbai
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹70,000
Confarance Room , WIP, WMD
13 Feb 2024
9 Dec 2023
8 Jan 2024
11 Dec 2023
3 Jan 2024
21 Dec 2023
11 Dec 2023 - 20 Dec 2023
21 Dec 2023
Amount
Dismantling, shifting & storing of all structural and equipment’s inside the compaction unit. i.e 1. Drum Handling Crane with girder and support columns. 2. Drum handling trolley with all fixtures, electricals. 3. Drum loading & product removal tong with all structural, hydraulics connection, power pack. 4. Trolley for Cask Handling & Turn Table. 5. Cask Handling Crane with all structural. 6. Ventilation System complete with ducts and filter housings. 7. Shielding & shielding glass window. All above items are weighing @ 25 Te. , Lead @ 2.0 Km. (For measurement, weight will be calculated by empirical formula i.e: volume x density)
Systematic dismantling of main compaction unit as per the approved scheme. Removal of the unit from existing location. Transfer of the unit to desire location. ( lead @ 1.5 Km) Proper storing of equipment as per the instruction. Approximately weight of the machine is 40 Te. ( Involves : 1. Fabrication & erection of structure for lifting main press. 2.Removing main press from existing building with the help of trained and experience rigging gang. 3.Loading and shifting of main press by using appropriate Mobile crane and 50 T open body trailer. 4.Construction of firm flooring and canopy 5.Unloading of main press at desire location by using Mobile crane. (lead @ 2.0 Km) (All equipment’s, gadgets, structures, mobile crane, forklift, hydra , belts ,slings and any other rigging material require for removal of machine is the scope of the contractor. ) 5.Proper packing and storing of all unit with accessories, mountings, piping’s, instrumentations, motors etc.
HIRACHAND S BALSHANKAR CO
shoiab construction
SSG ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .