Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | ₹11.0 L | L1 | Accepted-AOC ok |
| 2 | L2₹11.5 LRejected-AOC | ₹11.5 L | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | M/S. GPS BUILDEERS L1 | B SUGUNA L2 |
|---|---|---|---|---|---|
| 1.001.Providing CC road at St Marrys 1st Street in Nadukuthagai Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 11.93 | CUM | 131.5 ₹1,569 | 150 ₹1,790 |
| 3.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 65.44 | CUM | 2,900.5 ₹1.9 L | 3,500 ₹2.3 L |
| 4.00 | Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete | 51.59 | CUM | 5,907 ₹3.0 L | 5,907 ₹3.0 L |
| 5.00 | CC 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site mixing, placing, curing and all labour charges etc. complete | 55.59 | CUM | 7,314.1 ₹4.1 L | 7,314.1 ₹4.1 L |
| 6.00 | Towards Centring charges for planks including rend and labour charges etc. complete. | 198.9 | sqm | 136.88 ₹27,225 | 136.88 ₹27,225 |
| 7.00 | Supply of Bitumen pads including cost and conveyance of all materials to site and all labour charges etc. complete. | 8.18 | Sqm | 234.3 ₹1,917 | 234.3 ₹1,917 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,67,733.54 ₹1.7 L | 1,74,834.9 ₹1.7 L |
Tender Value
₹11.2 L
EMD Value
₹12,000
Closing Date
25 Sept 2025, 3:00 pmClosed
Block Development office BP
Poonamallee union
ProvidingCC road at ST marrys 1st street in NAdukuthagai Panchayat
2025_RDTN_607474_1
SFC DP 25-26-02
Open Tender
Civil Works
poonamallee
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,000
Yes
Block Development office BP
1 Feb 2026
22 Sept 2025
25 Sept 2025
22 Sept 2025
25 Sept 2025
22 Sept 2025
22 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_726029.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid