| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.9 LAccepted-Finance | ₹1.9 L | 1 | Accepted-Finance Lower Bidder |
| 2 | 2₹2.0 LRejected-Finance | ₹2.0 L | 2 | Rejected-Finance Higher Biidder |
| 3 | 3₹2.0 LRejected-Finance | ₹2.0 L | 3 | Rejected-Finance Higher Biidder |
| Sl No | Description | Qty | Unit | KRISHNAMOORTHY L3 | JANAKIRAMAN L2 | DHANASEKARAN L1 |
|---|---|---|---|---|---|---|
| 1.00Construction of Mini CSC Type II in Construction of Mini CSC Type 2 in Ambethkar nagar at Manamai Panchayat Est amt - 2.00 Lakhs | ||||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 5.92 | cum | 275 ₹1,628 | 263 ₹1,556.96 | 240 ₹1,420.80 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 2.04 | cum | 5,493 ₹11,205.72 | 5,454 ₹11,126.16 | 5,300 ₹10,812 |
| 4.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 9.63 | cum | 6,159 ₹59,311.17 | 6,101.1 ₹58,753.59 | 6,050 ₹58,261.50 |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.08 | MT | 92,155 ₹7,372.40 | 91,858 ₹7,348.64 | 90,000 ₹7,200 |
| 6.00Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors using mild steel sheets of size 90 x 60 cm and 10 guage complete complying with standard specifications and as directed by departmental Officers etc.Complete. | ||||||
| 8.00 | Above to Ground Level | 6.38 | sqm | 1,130 ₹7,209.40 | 1,095 ₹6,986.10 | 900 ₹5,742 |
| 9.00 | RCC 1:1:5:3 mix using 20mm HBG metal including cost and conveyance and all other labor charges | 0.78 | cum | 9,100 ₹7,098 | 9,066.5 ₹7,071.87 | 9,000 ₹7,020 |
| 10.00 | Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. | 60.82 | sqm | 298 ₹18,124.36 | 282.4 ₹17,175.57 | 260 ₹15,813.20 |
| 11.00 | Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work). | 12.94 | sqm | 198 ₹2,562.12 | 184.25 ₹2,384.19 | 260 ₹3,364.40 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
2 Mar 2026, 3:00 pmClosed
The Village Panchayat President Manamai
The Village Panchayat President Manamai
Construction of Mini CSC Type II in Construction of Mini CSC Type 2 in Ambethkar nagar at Manamai Panchayat
2026_RDTN_665187_1
221/2026/A2
Open Tender
Civil Works
180 days
Manamai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,000
Yes
3 Jun 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
Construction of Mini CSC Type II in Construction of Mini CSC Type 2 in Ambethkar nagar at Manamai Panchayat Est amt - 2.00 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors using mild steel sheets of size 90 x 60 cm and 10 guage complete complying with standard specifications and as directed by departmental Officers etc.Complete.
Above to Ground Level
RCC 1:1:5:3 mix using 20mm HBG metal including cost and conveyance and all other labor charges
Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc.
Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work).
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Dadooing walls Plain Galzed tiles of size 150x150x6mm
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc., complete as per standard specification
Cost and supply of IWC
Cost and supply of EWC
Door D1 0.75 m x 1.80m
Door D 1.20 m x 1.80 m
RCC Ring
Round Slab
110 mm dia pvc pipe
110mm PVC Door Bend
110mm PVC TEE
500 lit HDPE tank
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_798892.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_798892.xls
BOQ • 0.34 MB
Techbid.pdf
Tender Documents • 1.03 MB
Download all tender documents and submit your bid