| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical RAVIVAR PETH BEED | BEED | BEED | MAHARASHTRA | 431122 | Accepted-Technical Accepted |
| 2 | Accepted-Technical 2ND FLOOR 9 EZRA STREET KOLKATA WEST BENGAL 700001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | Accepted-Technical Accepted |
| 3 | Accepted-Technical YOGESHWARI NAGARI RING ROAD AMBAJOGAI | AMBAJOGAI | BEED | MAHARASHTRA | Accepted-Technical Accepted |
Tender Value
₹9.9 Cr
EMD Value
₹5.0 L
Closing Date
7 Sept 2026, 6:00 pmClosed
Executive Engineer P.W.D. Beed
Executive Engineer P.W.D. Beed
Development and Construction of Planetarium and Science Park at Beed Tq Dist. Beed
2026_PWR_1332884_1
PWD_Beed/4/2026-27
Open Tender
Civil Works
Percentage
365 days
Beed
Please refer tender document
2 documents required · 2 mandatory
₹3,540
₹5.0 L
Chief Engineer, P.W. Region Chh. Sambhajinagar
10 Sept 2026
28 Aug 2026
8 Sept 2026
28 Aug 2026
7 Sept 2026
28 Aug 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 Metre including removal and disposal of top organic soil not exceeding 150 mili metre in thickness. | - | One Square Metre | 12.38 | - |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 metre) By Mechanical Means | - | One Cubic Metre | 213.54 | - |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 Metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.50 metre) By Mechanical Means | 1 | One Cubic Metre | 234.17 | ₹233.94 |
| 4 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 Metre, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.50 metre.) By Mechanical Means | - | One Cubic Metre | 259.96 | - |
| 5 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 Metre beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etcetera complete (lift upto 1.50 metre) By Mechanical Means | - | One Cubic Metre | 442.56 | - |
| 6 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etcetera including trimming and levelling the bed, removing the excavated material upto a distance of 50 Metre beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etcetera complete. (Lift upto 1.5 metre). By Mechanical Means | - | One Cubic Metre | 1,348.3 | - |
| 7 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20 centi metre to 30 centi metre breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50 metre to 300 metre inclusive from the site of excavation to the site of deposition as directed. | 1 | One Cubic Metre | 201.16 | ₹200.96 |
| 8 | Providing preconstructional antitermite treatment as per Indian Standard 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | - | One Square Metre | 110.38 | - |
| 9 | Providing preconstructional antitermite treatment as per Indian Standard 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per square metre of surface area covering ten years guarantee on bond paper. | - | One Square Metre | 111.41 | - |
| 10 | Filling in plinth and floors with approved excavated material in 15 centi metre. to 20 centi metre layers including watering and compacting etcetera complete. | - | One Cubic Metre | 123.79 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
1_Planetarium_SciencePark_Beed.pdf
Tender Documents • 2.50 MB
BOQ_2280925.xls
BOQ • 0.66 MB
Corrigendum_Planetarium-1_260904_213216.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .