| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹51.4 L+₹15.5 L (43.0%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹51.8 L+₹15.9 L (44.2%)Rejected-AOC 289 KASERU KHERA MAWANA ROAD MEERUT 250001 U P | MEERUT | UTTAR PRADESH | 250001 | L3 | Rejected-AOC L3 | |
| 4 | L4₹56.1 L+₹20.1 L (56.0%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹63.3 L+₹27.3 L (76.0%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
26 Dec 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE(U) E/M Meerut Cantt
GE(U) E/M Meerut Cantt
REPAIR/MAINTENANCE OF TRANSFORMER AND ALLIED WORKS AT NORTH/ SOUTH/BHAGAT LINE/ DABATHWA AREA UNDER AGE E/M AT GE(U) E/M MEERUT CANTT.
2020_MES_398693_1
8302/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Meerut Cantt
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
GE(U) E/M Meerut Cantt
₹96,000
Yes
7 Feb 2021
27 Nov 2020
2 Jan 2021
27 Nov 2020
26 Dec 2020
12 Dec 2020
27 Nov 2020 - 5 Dec 2020
60 days
Amount
Taking down cement plaster on brick or stone walls , concrete block walls etc. including racking out joints, hacking for key, scrubbing down with water, any description etc. and removing of the rubbish and M&L rendering 15 mm thick on fair faces of brick work or concrete surfaces , in cement and sand mortar 1:6 , top surfaces finished fair and even complete all as specified
M&L preparation of old painted steel and iron surfaces of any description , not otherwise described ,over 10 cm width or girth and painting one coat with synthetic enamel including cleaning, stopping and rubbing down and removing all drops etc. complete all as speciified.
Dismantling of ACSR from overhead lines service feeder or distributor span and Supplying, straining and stretching of Over head aluminium conductor steel reinforced (ACSR) of any size on HT/LT poles, (with suitable sag as designed by Engineer-in-Charge) including binding and jointing the conductor with and including 14 SWG binding wire and coloured sleeved jumpers with jumper connections with PG clamps complete all as specified.
M&L for preparation of old painted surfaces erected steel tubular swaged poles / Rails/Girder poles of HT over head line ( 04 pole structure) ( Except embedded portion) , 11 M long including all MS work mounted on pole , earth protection & water pipe ( if exists) and providing TWO coats of aluminium paint and providing 05 Nos bands/ straps with Two coats of synthetic enamel paint ( black & yellow and Black and red white 30 cm wide each) from top of plinth block and numbering of poles with white synthetic enamel paint on yellow synthetic enamel piant ground (50mm wide and 100mm high letters) including encircling the letters or figures complete all as specified
M&L for preparation of old painted surfaces erected steel tubular swaged poles / Rails/Girder poles of HT over head line ( 02 pole structure) ( Except embedded portion) , 11 M long including all MS work mounted on pole , earth protection & water pipe ( if exists) and providing TWO coats of aluminium paint and providing 05 Nos bands/ straps with Two coats of synthetic enamel paint ( black & yellow and Black and red white 30 cm wide each) from top of plinth block and numbering of poles with white synthetic enamel paint on yellow synthetic enamel piant ground (50mm wide and 100mm high letters) including encircling the letters or figures complete all as specified
Surface dressing not exc 15 cm deep in soft/loose soil including levelling and dressing / cleaning of surrounding areas of 2/4 poles plinth mounted transformer / E/M substation including removing of tree branches, plants, brushes etc. surfaces formed to required slope etc,. Complete all as specified.
Disconnecting of defective transformer from power mains, taking down from 2/4 pole structure, platform , taking up from AGE E/M ES; and transporting it to workshop by any means , opening the cover of transformer; draining out transformer oil, removing of burnt parts e.g tape, paper insulating strings etc. gently and carefully, taking out cooling tubes, welding, washing of the dust, cleaning of rust and dirt from all parts and re-assembling after carrying out required repairs and transporting back to its original location by any means , making necessary fixing arrangement including connecting up electrically, commissioing and testing all as directed by Engineer-in-Charge and specified of the following capacity of transformers:-
63 KVA to 315 KVA
400 KVA to 630 KVA
1000KVA to 2000 KVA
M&L shifting of power transformer of capacity 63 KVA to 1000 KVA from one locations to other locations by any means , disconnecting from old locations and connecting electrically at new locations on poles/ platform and testing or depositing in MES store yard complete all as specified and directed.
Dismantling and segregation of serviceable and unserviceable HT leg coil and M&L for renewal of unserviceable coils with insulated copper winding wire of suitable gauge, craft paper, cotton tape etc as per specifiactions of old transformer including ovening and heating after marking of coil complete all as directed and specified.
Dismantling and segregation of serviceable and unserviceable HT leg coil and M&L for renewal of unserviceable coils with insulated copper winding wire of suitable gauge, craft paper, cotton tapeetc as per specifiactions of old transformer including ovening and heating after marking of coil complete all as directed and specified.
Disconnecting HT and LT connection of any type and capacity power transformer, opening of transformer cover, carrying out testing and renewal of damaged parts including drainout oil transformer & refilling after renewal of parts and refixing of transformer cover, making connections and testing complete all as specified and directed:- Note:- Parts renewed shall be measured and paid separately at supplied only rates under appropriate items.
Supply only HT bushing complete suitable for 63 KVA to 250 KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers.
Supply only HT bushing complete suitable for 300 KVA to 400KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers.
Supply only HT bushing complete suitable for 500 KVA to 630KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers.
Supply only HT bushing complete suitable for 1000KVA to 2000KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only LT bushing complete suitable for 63 KVA to 250 KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only LT bushing complete suitable for 300 KVA to 400KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only LT bushing complete suitable for 500 KVA to 630KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only LT bushing complete suitable for 1000KVA to 2000KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only HT bushing brass rod suitable for 63 KVA to 250 KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only HT bushing brass rod suitable for 300 KVA to 400KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only HT bushing brass rod suitable for 500 KVA to 630KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only HT bushing brass rod suitable for 1000KVA to 2000KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only LT bushing brass rod suitable for 63 KVA to 250 KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only LT bushing brass rod suitable for 300 KVA to 400KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only LT bushing brass rod suitable for 500 KVA to 630KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only LT bushing brass rod suitable for 1000KVA to 2000KVA transformers complete with metal parts, gasket set, nuts, bolts, and washers complete all as specified and directed.
Supply only Tap Changer switch complete with rod and gasket suitable for 63 KVA to 250 KVA transformer complete all as specified and directed.
Supply only Tap Changer switch complete with rod and gasket suitable for 300 KVA to 500 KVA transformer complete all as specified and directed.
Supply only Tap Changer switch complete with rod and gasket suitable for 630 KVA to 2000 KVA transformer complete all as specified and directed.
Supply only Tap Changer switch complete with rod and gasket suitable for 630 KVA to 2000 KVA transformer complete all as specified and directed.
Taking down of existing unserviceable mild steel oil drain valve suiatble for 63KVA to 250 KVA transformer complete all as specified and directed.
Taking down of existing unserviceable mild steel oil drain valve suiatble for 300KVA to 500 KVA transformer complete all as specified and directed.
Taking down of existing unserviceable mild steel oil drain valve suiatble for 630KVA to 2000 KVA transformer complete all as specified and directed.
Taking down of existing unserviceable de-dydrating breather with first fill of dehydrating agent ( Silica gel) suiatble for 63KVA to 250 KVA transformer complete all as specified and directed.
Taking down of existing unserviceable de-dydrating breather with first fill of dehydrating agent ( Silica gel) suiatble for 300KVA to 500 KVA transformer complete all as specified and directed.
Taking down of existing unserviceable de-dydrating breather with first fill of dehydrating agent ( Silica gel) suiatble forr 630KVA to 2000 KVA transformer complete all as specified and directed.
Taking down of existing unserviceable 100mm dia, dial type thermometer, vapour pressure type, having calibration from 0-120 celsius with metal guard having max perimeter temperature reading indicator with resetting device complete all as specified and directed.
Scraping and removing of worn out gasket of transformer oil tank and supplying and fixing 6mm thick rubberrised gasket duly pasted using gasket cement including fixing the tio cover with oil cxonservator of transformers of capacity 63 KVA to 250 KVA complete all as specified.
Scraping and removing of worn out gasket of transformer oil tank and supplying and fixing 6mm thick rubberrised gasket duly pasted using gasket cement including fixing the tio cover with oil cxonservator of transformers of capacity 300 KVA to 400 KVA complete all as specified.
Scraping and removing of worn out gasket of transformer oil tank and supplying and fixing 6mm thick rubberrised gasket duly pasted using gasket cement including fixing the tio cover with oil cxonservator of transformers of capacity 500 KVA to 600 KVA complete all as specified.
scraping and removing of worn out gasket of transformer oil tank and supplying and fixing 6mm thick rubberrised gasket duly pasted using gasket cement including fixing the tio cover with oil cxonservator of transformers of capacity 1000 KVA to 2000 KVA complete all as specified.
Discoonecting the connections of power supply,cleaning and removing carbon from bushing , draining out oil and refilling fixing of bushing, scraping and removing of worn out gasket from HT and LT bushings and supplying and fixing 6mm thick rubberrised gasket duly pasted using gasket cement including renewal of rubber oil seals, assembling bushings and making connectiions with terminals of transformer capacity 63 KVA to 200 KVA complete all as specified.
Discoonecting the connections of power supply,cleaning and removing carbon from bushing , scraping and removing of worn out gasket from HT and LT bushings and supplying and fixing 6mm thick rubberrised gasket duly pasted using gasket cement including renewal of rubber oil seals, assembling bushings and making connectiions with terminals of transformer capacity 250 KVA to 315 KVA complete all as specified.
Discoonecting the connections of power supply,cleaning and removing carbon from bushing , draining out oil and refilling fixing of bushing,scraping and removing of worn out gasket from HT and LT bushings and supplying and fixing 6mm thick rubberrised gasket duly pasted using gasket cement including renewal of rubber oil seals, assembling bushings and making connectiions with terminals of transformer capacity 400 to 500 KVA complete all as specified.
Discoonecting the connections of power supply,cleaning and removing carbon from bushing , draining out oil and refilling fixing of bushing, scraping and removing of worn out gasket from HT and LT bushings and supplying and fixing 6mm thick rubberrised gasket duly pasted using gasket cement including renewal of rubber oil seals, assembling bushings and making connectiions with terminals of transformer capacity 630 to 2000 KVA complete all as specified.
Taking out wornout dehydrating agent and filling fresh Silica gel in dehydrating breather complete all as specified and directed.
Taking out wornout oil level indicator glass of any type / capacity of transformer complete all as specified and directed.
M&L for reparing the cooling pipe of transformer of any capacity at site for rectification of any leakage including welding / Brazing complete all as specofoed.
Taking down of old unserviceable/ wornout aluminium strips of LV side transformers at site duly drilled holes for transformers studs and LT Cables , fixing with GI bolts, nuts and washers of suiatble size complete all as specified.
Taking down of old unserviceable/ wornout aluminium lugs from HT bushing and S&F aluminium lugs for HT bushing of suitable size by means of crimping tool of any capacity of transformers complete all as specified.
Taking down of old unserviceable/ wornout aluminium lugs from LT bushing and S&F aluminium lugs for LT bushing of suitable size by means of crimping tool of 63 KVA to 300 KVA capacity of transformers complete all as specified.
Taking down of old unserviceable/ wornout aluminium lugs from LT bushing and S&F aluminium lugs for LT bushing of suitable size by means of crimping tool of 315 KVA to 500 KVA capacity of transformers complete all as specified.
Taking down of old unserviceable/ wornout aluminium lugs from LT bushing and S&F aluminium lugs for LT bushing of suitable size by means of crimping tool of 630 KVA to 2000 KVA capacity of transformers complete all as specified.
Supplying and filling of transformer oil in transformer at site for topping up the level of oil having dielectric strength 60KV during filling ( after initial filtration) ISI-335, ( Note:- Contractor shall supply the transformer oil in sealed Container to the site of work. Container shall remain the property of Contractor).
M&L for dehydrating/ filtration of transformer oil of existing transformer at site with portable dehydrating and filtration plants to improve the dielectric strength to 60 KV and testing dielectric strength complete all as specified and directed. ( Note:- No departmetal electricity shall be provided by department and contractor is to arrabge DG at his own resources. The rates quoted shall be deemed to be included for the same). Dehydrating of oil of transfomer shall be done if the dielectric strenth if <35 KV, therfore dielectric strength of transformer oil shall be done before start of dehydration. Initial and final test report of dielectric strength shall be submitted by contractor. Cost of testing shall be deem included in the unit rate quoted by contractor.
M&L preparation of old painted steel and iron surfaces of any description , not otherwise described ,over 10 cm width or girth and painting one coat with synthetic enamel including cleaning, stopping and rubbing down and removing all drops etc. of transformer of capacity 63 KVA to 250 KVA complete all as speciified.
M&L preparation of old painted steel and iron surfaces of any description , not otherwise described ,over 10 cm width or girth and painting one coat with synthetic enamel including cleaning, stopping and rubbing down and removing all drops etc. of transformer of capacity 300 KVA to 500 KVA complete all as speciified.
M&L preparation of old painted steel and iron surfaces of any description , not otherwise described ,over 10 cm width or girth and painting one coat with synthetic enamel including cleaning, stopping and rubbing down and removing all drops etc. of transformer of capacity 630 to 2000 KVA complete all as speciified.
M&L for disconnecting of transformer from power mains , lifting from platform , setting aside, making connections to continue electric supply; dismantling of PCC flooring and sub base of tranformer platform and ramp complete including removing of rubbish to a ditance of 50 away; M&L for providing PCC 1:4:8 type D2 sub base 100mm thick, PCC 1:2:4 type B1 flooring 150mm thick, top surfaces finished even and fair, S&F ISMC-100-02 Nos 2500 mm each long and embedded in flooring; taling down old workout plastering and M&L 15mm thick rendering in CM1:6 upto 150mm below GL and applying two coats of colour wash over a coat of white wash as per drg TD-091 Sheet 1/2; replacing the transformer at platform by disconnecting and making connections to restore electric supply complete all as specified and directed.
BASANT RAM AND SONS
Shikha Enterprises
D S Enterprises
M/S JPS Electrical Engineer & Contractor
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .