Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹13.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.3 L+₹12,384.16 (0.94%)Rejected-Finance KHOTTADIH COLLIERY BURDWAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BURDWAN | WEST BENGAL | 713378 | ₹13.3 L+₹12,384.16 (0.94%) | L2 | Rejected-Finance L2 |
| 3 | L3₹13.5 L+₹30,139.21 (2.29%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | ₹13.5 L+₹30,139.21 (2.29%) | L3 | Rejected-Finance L3 |
| 4 | L4₹13.6 L+₹47,864.62 (3.64%)Rejected-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹13.6 L+₹47,864.62 (3.64%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | BABLU SINHA L4 | RANJIT SINGH L2 | NANDI ENTERPRISE L1 | SABIR CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|
| 1.00Salvaging of Two Damaged Pumps and One Starter, Replacement with Repaired Units and Ensuring Proper Functioning of Dewatering System in R-III/ II Seam under Khottadih Colliery. (Inclusive of EPF/CMPF) | |||||||
| 1.01 | Loading of 300mtr head HT Pump on french trolly, binding and lowering upto RIII/II seam 4 no golai | 24 | Manshift | 1,325.63 ₹31,815.12 | 1,280.8 ₹30,739.2 Lowest | 1,280.95 ₹30,742.8 | 1,310.25 ₹31,446 |
| 1.02 | undloading from french trolly and loading on small trolly at 4 no golai binding and transport upto 24 no golai at RIII/II seam | 36 | Manshift | 1,325.63 ₹47,722.68 | 1,280.8 ₹46,108.8 Lowest | 1,280.95 ₹46,114.2 | 1,310.25 ₹47,169 |
| 1.03 | Manually transportation of 300mtr head HT Pump from 24 no golal to 26L/90 and fitting on bed plate | 36 | Manshift | 1,325.63 ₹47,722.68 | 1,280.8 ₹46,108.8 Lowest | 1,280.95 ₹46,114.2 | 1,310.25 ₹47,169 |
| 1.04 | Connection of 6" MS pipe with pump in both delivery and suction side and testing of Pump after starting and fabrication of bed plate | 21 | Manshift | 1,325.63 ₹27,838.23 | 1,280.8 ₹26,896.8 Lowest | 1,280.95 ₹26,899.95 | 1,310.25 ₹27,515.25 |
| 1.05 | Transportation of old and damaged pump from 26L/9D to surface | 72 | Manshift | 1,325.63 ₹95,445.36 | 1,280.8 ₹92,217.6 Lowest | 1,280.95 ₹92,228.4 | 1,310.25 ₹94,338 |
| 1.06 | Transportation of old and damaged motor from 26L/9D to surface | 72 | Manshift | 1,325.63 ₹95,445.36 | 1,280.8 ₹92,217.6 Lowest | 1,280.95 ₹92,228.4 | 1,310.25 ₹94,338 |
| 1.07 | welding of flenge on both side in 20 nos of 4 inch MS Pipe at unit store | 32 | Manshift | 1,325.63 ₹42,420.16 | 1,280.8 ₹40,985.6 Lowest | 1,280.95 ₹40,990.4 | 1,310.25 ₹41,928 |
| 1.08 | Loading of 20 nos of 4" MS pipe on french trolly, binding and lowering upto RIII/Il seam 4 no golai | 24 | Manshift | 1,325.63 ₹31,815.12 | 1,280.8 ₹30,739.2 Lowest | 1,280.95 ₹30,742.8 | 1,310.25 ₹31,446 |
| 1.09 | Transporattion of same 20 nos of 4" Ms pipe from 4 no golal to 26L/9D in two small trolly | 24 | Manshift | 1,325.63 ₹31,815.12 | 1,280.8 ₹30,739.2 Lowest | 1,280.95 ₹30,742.8 | 1,310.25 ₹31,446 |
Tender Value
₹13.2 L
EMD Value
₹16,500
Closing Date
2 May 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Salvaging of Two Damaged Pumps and One Starter, Replacement with Repaired Units and Ensuring Proper Functioning of Dewatering System in R-III/ II Seam under Khottadih Colliery
2026_ECL_358556_1
GM-PND/EandM/26-27/04/2004 dated 17/04/2026
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹16,500
22 Jun 2026
21 Apr 2026
4 May 2026
21 Apr 2026
2 May 2026
21 Apr 2026
21 Apr 2026 - 25 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Salvaging of Two Damaged Pumps and One Starter, Replacement with Repaired Units and Ensuring Proper Functioning of Dewatering System in R-III/ II Seam under Khottadih Colliery. (Inclusive of EPF/CMPF) | |||||
| 1.01 | Loading of 300mtr head HT Pump on french trolly, binding and lowering upto RIII/II seam 4 no golai | 24 | Manshift | - | - |
| 1.02 | undloading from french trolly and loading on small trolly at 4 no golai binding and transport upto 24 no golai at RIII/II seam | 36 | Manshift | - | - |
| 1.03 | Manually transportation of 300mtr head HT Pump from 24 no golal to 26L/90 and fitting on bed plate | 36 | Manshift | - | - |
| 1.04 | Connection of 6" MS pipe with pump in both delivery and suction side and testing of Pump after starting and fabrication of bed plate | 21 | Manshift | - | - |
| 1.05 | Transportation of old and damaged pump from 26L/9D to surface | 72 | Manshift | - | - |
| 1.06 | Transportation of old and damaged motor from 26L/9D to surface | 72 | Manshift | - | - |
| 1.07 | welding of flenge on both side in 20 nos of 4 inch MS Pipe at unit store | 32 | Manshift | - | - |
| 1.08 | Loading of 20 nos of 4" MS pipe on french trolly, binding and lowering upto RIII/Il seam 4 no golai | 24 | Manshift | - | - |
| 1.09 | Transporattion of same 20 nos of 4" Ms pipe from 4 no golal to 26L/9D in two small trolly | 24 | Manshift | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_371428.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .