Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance GRAM DEVRADA TARABGANJ DISTRICT GONDA UTTAR PRADESH | GONDA | UTTAR PRADESH | 271001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
20 Apr 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintenging Engineer
EDC Ayodhya
Giving 45 KW Goverment Connectiom in Main Vetenary Polyclinic Cantoment Area Supply Depo Under Electricity Distribution Division Ist, Ayodhya
2022_MVVNL_687177_1
102 H(F)(W)/2021-22
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
As per tender specification
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, EDC
₹4,000
22 Apr 2022
12 Apr 2022
21 Apr 2022
12 Apr 2022
20 Apr 2022
12 Apr 2022
180 days
Amount
Carriage including loading, unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 20 Kms. (distance approx)
S.T. Pole 11 Mtr. long
PCC Pole 8.5 Mtr. Long
11KV XLPE cable 3x70 sq.mm
ACSR Weasel Conductor
AB Cable (3x120+1x95+1x16) sqmm
11 KV Cable Jointing Kit 3x70 sq mm outdoor
Transformer 100 KVA
Three Phase Distribution Box
LT XLPE Cable Aluminium 1x240 sqmm
Other matching Materials
Dragging of S.T./PCC Pole from dump site to pit site
Fabrication and Errection of Double Pole Support on ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Errection of Single Pole Support on PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Earthing of Poles as per RESPO Norms
Grouting and Binding of Stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Laying of underground 11 KV 3x70 sq mm XLPE Cable (Double Circuit) by HDD (HORIZONTAL DRILL DIRECTION) Method by using suitable HDD Machine Complete in all Respect as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable)
Hanaging Hosting & clamping and G.I. Pipe channel nut & Bolt 3 x70 mm2 XLPE 11 KV cable (cost of all accessories will be borne by contractor) as per RESSPO Norms
Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 11 KV XLPE cable 3x70 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any.
Stringing, Sagging, binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Stringing, Sagging, binding and jumpering of Three Phase ABC (3x120+1x95+1x16) sqmm as per RESSPO Norms
Erection & Commissioning of of 3 Phase Distribution Box with help of clamps (Cost of clamp & Bolt & Nuts shall be borne by contactor ) as per Norms.
Supply and Fixing of G.I. Pipe 6'' dia
Mounting of 100 KVA Transformer as per RESPO Norms
M/S ALOK CONSTRUCTION
M/s Shukla Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .