Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹430.9 CrAccepted-Finance 84 1A 3RD FLOOR TRINITY PLAZA TOPSIA ROAD SOUTH TOPSIA KOLKATA WEST BENGAL 700046 | KOLKATA | WEST BENGAL | 700046 | ₹430.9 Cr | L1 | Accepted-Finance L1 Bidder |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
5 Mar 2022, 3:00 pmClosed
Engineer, Resources Division PHED
P 16, INDIA EXCHANGE PLACE EXTN. 1ST FLOOR KOLKATA 700 073
Surveying, Design, Construction, Supply, Laying, Erection and Commissioning of1 one Clear Water Reservoir and 1 one Ground Level Reservoir, Pumping main M.S., D.I. etc. for conveyance of Treated water to 29 Twenty Ninenos. OHR sites old and New
2022_PHED_364758_1
WBPHED/EE/RS/e13/2021-2022 (2ndCall)
Open Tender
CIVIL AND ELECTRICAL WORKS
730 days
OFFICE OF THE EXECUTIVE ENGINEER, S24 WS Div-I
Please refer Tender documents.
8 documents required · 8 mandatory
₹50 L
N S Building kolkata
17 Mar 2022
8 Feb 2022
7 Mar 2022
8 Feb 2022
5 Mar 2022
8 Feb 2022
18 Feb 2022
Amount
Design, Surveying, Construction, Supply, Laying, Erection & Commissioning of inlet pipes from clear water channel to Twin compartment Clear Water Reservoir (CWR) with common Sump and Pump House at Falta Mathurapur Water Treatment Plant premises and twin compartment Ground Level Reservoir (GLR) with common sump and Pump House at Bishnupur – II, Overhead Reservoirs for Budge Budge – II & Budge Budge – I ( Mayapur GP only) and Bishnupur - II including Rising main for conveyance of Treated water from proposed Twin compartment Clear Water Reservoir with common Sump and Pump House (located at newly constructed Falta Mathurapur Water Treatment Plant) to different Overhead Reservoirs (OHRs – Existing : 7 Nos. & New : 7 Nos.) under Budge Budge –II & I Blocks and Twin compartment GLR with common sump and Pump House at Bisnupur II Block and rising main for conveyance of treated water from Bishnupur – II GLR with common sump and Pump House to different Overhead Reservoirs (OHRs – Existing : 6 Nos. & New : 9 Nos.) under Bishnupur -II block, and all other structures/ buildings/ constructions as specified elsewhere and all related electromechanical works inclusive of Sub-station ( excluding HT Breaker, Transformer etc all for GLR ) and excluding separate Chlorination Systems for gaseous chlorination at Bishnupur –II Twin compartment GLR/ all existing and proposed OHRs but inclusive of Guard Room and Chlorination Room at all the OHRs under Budge Budge – I/II and Bishnupur - II, Yard Lighting and Boundary Walls . Cost of MS Pipes is included whereas cost of DI (k-9) pipes is excluded. Scope includes Surveying, Planning, Designing, Procuring, Transporting, Handling, Laying, Disinfection and Testing of Distribution System(M.S./D.I./uPVC/HDPE Pipes etc.) in all the 29(twenty nine) distribution zones new and existing (14 in Budge Budge I/II Block & 15 in Bishnupur II Block) including providing functional household tap connections(FHTC) to all the rural households and Public Institutions(e.g. Schools, AWC, Health Centers etc.) including supply and installation of all type of valves, valve chambers, washout chambers as per scope and approved design as per the direction and satisfaction of EIC. (Only DI pipes will be supplied by the Department from its store.)
Trial Run of 3 Months and Performance Guarantee Test of 72 Hrs of Whole System
60 Months Operation and Mantainance of Entire System including repair and mantainance of Roads which were cut / damaged then permanently restored after laying the pipeline (Roads may be under Zilla Parishad / GP / PWD / NH / SH etc, ). [ Runtime : 24 Hrs x 60 Months ] (Quote in Sl No 3 should be in the range of 3 to 5 % of Quote in Sl No 1)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.11 MB
Download all tender documents and submit your bid