Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC AMAR NIWAS RA 288 GANDHI CHOWK SADAR BAZAR KARNAL | KARNAL | KARNAL | HARYANA | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.8 L+₹1.3 L (24.4%)Rejected-AOC VPO KANWARI VPO KANWARI DISTT HISAR 125037 | HISAR | HARYANA | 125037 | L2 | Rejected-AOC L2 | |
| 3 | L3₹6.8 L+₹1.3 L (24.6%)Rejected-AOC BOOTH NO 119 ECTOR 9 PANCHKULA | PANCHKULA | HARYANA | 133301 | L3 | Rejected-AOC L3 | |
| 4 | L4₹7.3 L+₹1.8 L (34.0%)Rejected-AOC NA | NA | NA | 121004 | L4 | Rejected-AOC L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical MAIN STREET MAIN STREET GONDER 35 132024 | GONDER | KARNAL | HARYANA | 132024 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.7 L
EMD Value
₹15,400
Closing Date
5 Mar 2024, 10:00 amClosed
Executive Engineer
SCO-66, Sector-8, Panchkula
SHIFTING OF HT POLE AND 300 SQMM 3 CORE XLPE CABLE WHICH IS COMING IN THE ALIGNMENT OF NEWLY CONSTRUCTED 24 MTR. ROAD (UNDER 400 KV LINE) AND DISMANTLEMENT AND RE-ERECTION HT LINE WHICH EXISTS IN THE INSTITUTIONAL SITES AREA IN SEC-32 (PHASE-IV) U/E
2024_HBC_360279_1
21_2024
Open Tender
Electrical Works
Works
60 days
Karnal
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹15,400
3 Apr 2024
27 Feb 2024
6 Mar 2024
27 Feb 2024
5 Mar 2024
27 Feb 2024
eProcurement System Government of Haryana Created By: Ashok Kumar Rana Created Date/Time: 06-Mar-2024 05:52 PM Tender Title: SHIFTING OF HT POLE AND 300 SQMM 3 CORE XLPE CABLE WHICH IS COMING IN THE ALIGNMENT OF NEWLY CONSTRUCTED 24 MTR. ROAD (UNDER 400 KV LINE) AND DISMANTLEMENT AND RE-ERECTION HT LINE WHICH EXISTS IN THE INSTITUTIONAL SITES AREA IN SEC-32 (PHASE-IV) U/E Tender ID: 2024_HBC_360279_1
Tender Inviting Authority: HARYANA URBAN DEVELOPMENT AUTHORITY
Name of Work: SHIFTING OF HT POLE AND 300 SQMM 3 CORE XLPE CABLE WHICH IS COMING IN THE ALIGNMENT OF NEWLY CONSTRUCTED 24 MTR. ROAD (UNDER 400 KV LINE) AND DISMANTLEMENT & RE-ERECTION HT LINE WHICH EXISTS IN THE INSTITUTIONAL SITES AREA IN SEC-32 (PHASE-IV) U/E KARNAL. (INCLUDING ONE YEAR FREE MTC./ DEFECT LIABILITY PERIOD FREE OF COST).
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Protection World (GSTN-06AJMPB3531E1ZP) BID ID -1052981 767026.85 -5.00 728675.51 Seven Lakh Twenty Eight Thousand Six Hundred and Seventy Five
2.00 Som Nath Contractor (GSTN-06ABFPC3634GIZ4) BID ID -1053223 767026.85 -29.09 543898.74 Five Lakh Fourty Three Thousand Eight Hundred and Ninty Eight
3.00 M/s Sharma Electrical Engineer (GSTN-06BBOPK7151G1ZI) BID ID -1053564 767026.85 -11.62 677898.33 Six Lakh Seventy Seven Thousand Eight Hundred and Ninty Eight
4.00 M/S J.B.R. Electrical Company(GSTN-NA)--1051418 767026.85 -11.77 676747.79 Six Lakh Seventy Six Thousand Seven Hundred and Fourty Seven
Lowest Amount Quoted BY: Som Nath Contractor(543898.74)
BOQ Summary Details Tender Title: SHIFTING OF HT POLE AND 300 SQMM 3 CORE XLPE CABLE WHICH IS COMING IN THE ALIGNMENT OF NEWLY CONSTRUCTED 24 MTR. ROAD (UNDER 400 KV LINE) AND DISMANTLEMENT AND RE-ERECTION HT LINE WHICH EXISTS IN THE INSTITUTIONAL SITES AREA IN SEC-32 (PHASE-IV) U/E Tender ID: 2024_HBC_360279_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Som Nath Contractor 543898.74 L1
2 M/S J.B.R. Electrical Company 676747.79 L2
3 M/s Sharma Electrical Engineer 677898.33 L3
4 Protection World 728675.51 L4
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .