| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC EAST STREET THOPPUR MADURAI 8 | MADURAI | MADURAI | TAMIL NADU | L1 | Accepted-AOC Award of work |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
4 Apr 2025, 2:00 pmClosed
SE/GCC/Madurai
SE/GCC/Madurai
EWE Structural plinths power transformer at Vandiyur SS
2025_EB_536336_1
SE/GCC/MDU F.Specn.No.037/2024-25
Limited
Civil Works
Works
90 days
Vandiyur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
20 May 2025
28 Mar 2025
5 Apr 2025
29 Mar 2025
4 Apr 2025
29 Mar 2025
Amount
Earth work excavation for foundation in all type of soils including all labour charges including initial lead, lift, etc. complete. a) Earth work excavation for foundation in soft disintegrated rock, latarite soft rock or kankar not riquiring blasting with an initial lead of 10 m and lift of 2m etc., complete.
Earth work excavation for foundation in all type of soils including all labour charges including initial lead, lift, etc. complete. b) Hard Rock measured in solid including blasting & stacking.
Supplying and filling with Msand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete.
PCC 1:3:6, using 40mm HBG metal foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, with form work, including of all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For raft concrete.
PCC 1:2:4 wall using 20 mm HBG metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete for plinth structures
PCC 1:2:4 wall using 20 mm HBG metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete for plinth structures
Brick work in CM 1:3 using II class chamber burnt bricks for steps including cost of all materials, all labour charges, lead, lift, etc. complete.
Plastering with cm 1:3, 12mm thick including cost of cement, all materials,curing, labour, lead and lift etc., complete.
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.
Painting the plinth with exterior emulsion two coats over a primer coat of approved colour and quality including cost of all matreials, lead and lift etc., complete.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .