Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.0 LAccepted-AOC | L1 | Accepted-AOC as letter from EE agreement has been done by contractor | |
| 2 | L1₹86.3 LRejected-Finance | L1 | Rejected-Finance Being L2 | |
| 3 | L3₹86.3 LRejected-Finance | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹86.8 LRejected-Finance DISTRICT CHURU RAJASTHAN | CHURU | CHURU | RAJASTHAN | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹89.0 LRejected-Finance | L5 | Rejected-Finance Being L5 |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
14 Aug 2020, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE WR Division No.1, Dhar
EE WR Division No.1, Dhar
Construction of Mungela Tank on turnkey basis
2020_WRD_84213_1
726/2019-20/E-in-C/Mungela Dt. 16.03.2020
Open Tender
Civil Works - Others
Turn-key
365 days
Dhar
Please refer Tender documents.
6 documents required · 6 mandatory
₹12,500
as per tender document
₹1.4 L
Yes
12 Sept 2022
29 Jul 2020
17 Aug 2020
29 Jul 2020
14 Aug 2020
30 Jul 2020
180 days
Amount
Construction of MUNGELA Earthen Dam
Construction of MUNGELA Earthen Dam across Local Nalla near village MUNGELA , Tehsil BADNAWAR Distt. Dhar (MP) for least gross storage capacity of 0.68 MCM water on TurnKey Basis comprising of Earthen Dam including watering but excluding compaction and ng compaction and including survey, geological investigations preparation of design & drawing and getting approval from competent authority, Land acquisition cases and getting award for private land of dam seat, submergence area, Bridge & Road including property survey planning including design estimation preparation and RR plans from competent authority and construction of suitable surplussing arrangements to safety pass design flood through spill channel upto main nalla including construction of Flush- Bar if involved in the construction of dam and erection of sluice gate Bridge & Road in submergence etc. As per approved drawings and as directed by the Engineer in charge including removal of defects for two years after completion of the project.
MATHUR INFRASTRUCTURE
KHAN CONSTRUCTIONS
RAMPAL PAREEK AND COMANY
PATIDAR KRISHI YANTRA
PATIDAR CONNSTRUCTION
MODI ABHIKARAN
SHREE CONSTRUCTION
GLOBAL CONSTRUCTION
ROBERT CONSTRUCTION CO.
Maa Vaishno Developers
GURUKRIPA CONSTRUCTION
SUKHDEV SINGH RAWAT
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .