Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.9 LAccepted-AOC | ₹37.9 L Quoted ₹38.1 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹38.5 L+₹42,248 (1.11%)Rejected-Finance NO 7A MULLAI NAGAR MAIN RD WEST TAMBARAM CHENNAI 600 045 | CHENGALPATTU | TAMIL NADU | 600045 | ₹38.5 L+₹42,248 (1.11%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹40.7 L+₹2.6 L (6.74%)Rejected-Finance 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | ₹40.7 L+₹2.6 L (6.74%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹42.7 L+₹4.6 L (12.0%)Rejected-Finance 63 2ND MAIN ROAD NGO COLONY ADAMBAKKAM CHENNAI 600 088 | CHENNAI | CHENNAI | TAMIL NADU | 600088 | ₹42.7 L+₹4.6 L (12.0%) | L4 | Rejected-Finance Not being L1 |
| 5 | L5₹45.1 L+₹7.0 L (18.4%)Rejected-Finance 2 RC ENTERPRISES NEAR AGRASEN BHAWAN BHATAPARA CHHATTISGARH LINK ROAD BALODA BAZAR RAIPUR CHHATTISGARH 493118 | BALODA BAZAR | CHHATTISGARH | 493118 | ₹45.1 L+₹7.0 L (18.4%) | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | sanjeev enterprises L3 | rc enterprises L5 | EVEREST ENGINEERING WORKS L4 | NLK Construction L6 | NAVEEN ENTERPRIESES L7 | ragavbuilders L2 | SJM CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down old cement pole with fitting complete all as specified and directed by Engineer-in-Charge. | 100 | Each | 1,000 ₹1,00,000 | 100 ₹10,000 | 600 ₹60,000 | 300 ₹30,000 | 300 ₹30,000 | 180 ₹18,000 | 6 ₹600 Lowest |
| 2.00 | M&L Hexagonal/Octagonal GI Pole 7m height including Base plate, bolt , nut & Suitable design bracket, necessary connector with control device & etc complete all as specified and directed by Engineer-in-Charge.
Note:- Rate including Earth work and PCC measured and paid separately | 100 | Each | 14,000 ₹14,00,000 | 19,125 ₹19,12,500 | 15,000 ₹15,00,000 | 17,100 ₹17,10,000 | 20,000 ₹20,00,000 | 13,500 ₹13,50,000 Lowest | 15,000 ₹15,00,000 |
| 3.00 | S&F LED Street light 100W fitting complete with IP 65 and Surge Protection device complete all as specified and directed by Engineer-in-Charge. | 100 | Each | 4,000 ₹4,00,000 | 4,864 ₹4,86,400 | 3,645 ₹3,64,500 Lowest | 3,655 ₹3,65,500 | 4,600 ₹4,60,000 | 4,700 ₹4,70,000 | 4,000 ₹4,00,000 |
| 4.00 | Excavation in trenches not exceeding 1.5 mtr deep and not exceeding 1.5 mtr wide and getting out in hard/dense soil for complete all as specified and directed by Engineer-in-Charge. | 280 | Cum | 150 ₹42,000 Lowest | 250 ₹70,000 | 300 ₹84,000 | 310 ₹86,800 | 270 ₹75,600 | 270 ₹75,600 | 200 ₹56,000 |
| 5.00 | Returning filling in soil including providing cable cushioning with riddled earth obtained from excavation, levelling watering and well ramming in layers not exceeding 25cm thick over the cushion layer complete all as specified and directed by Engineer-in-Charge. | 240 | Cum | 50 ₹12,000 | 120 ₹28,800 | 45 ₹10,800 | 100 ₹24,000 | 60 ₹14,400 | 90 ₹21,600 | 25 ₹6,000 Lowest |
| 6.00 | Removal of surplus soil to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed by Engineer-in-Charge. | 40 | Cum | 40 ₹1,600 | 160 ₹6,400 | 75 ₹3,000 | 70 ₹2,800 | 60 ₹2,400 | 99 ₹3,960 | 25 ₹1,000 Lowest |
| 7.00 | Material and labour for DWC HDPE pipe of size 90/76 mm bore (OD X ID) for LT UG cable protection complete all as specified and directed by Engineer-in-Charge. | 900 | RM | 130 ₹1,17,000 | 230 ₹2,07,000 | 90 ₹81,000 Lowest | 155 ₹1,39,500 | 180 ₹1,62,000 | 90 ₹81,000 Lowest | 120 ₹1,08,000 |
| 8.00 | M & L for cutting Bitumen macadam / concrete foot path to a depth 0.75 mm with suitable mechanical cutter making good with cement concrete 1 : 2: 4 type B1 (20mm graded aggregate ) complete all as specified and directed by Engineer-in-Charge. | 20 | RM | 4,100 ₹82,000 | 500 ₹10,000 | 600 ₹12,000 | 1,000 ₹20,000 | 600 ₹12,000 | 180 ₹3,600 Lowest | 1,500 ₹30,000 |
| 9.00 | M&L for PCC 1:4:8, type D-2, (using 40 mm graded stone aggregate) for foundation, filling and mass concrete complete all as specified and directed by Engineer-in-Charge. | 12 | Cum | 4,000 ₹48,000 | 4,500 ₹54,000 | 7,500 ₹90,000 | 6,500 ₹78,000 | 4,000 ₹48,000 | 5,400 ₹64,800 | 1,400 ₹16,800 Lowest |
| 10.00 | Taking out old unserviceable LT under ground cable in sizes from trench and staging properly for disposable complete all as specified and directed by Engineer-in-Charge. | 950 | RM | 30 ₹28,500 | 30 ₹28,500 | 10 ₹9,500 Lowest | 20 ₹19,000 | 20 ₹19,000 | 18 ₹17,100 | 10 ₹9,500 Lowest |
Tender Value
₹47.9 L
EMD Value
₹95,780
Closing Date
22 Jul 2026, 6:00 pmClosed
GARRISON ENGINEER
GARRISON ENGINEER (AF) AIR FORCE STATION TAMBARAM, CHENNAI - 600 046
SPL REP REPLACEMENT OF OLD RCC POLE TO GI STREET LIGHT POLE IN PERIMETER AREA AND PROVN OF EXHAUST FAN FOR MD ACCN AT AFS TAMBARAM
2026_MES_774495_1
GE(AF)/TBM/8905/E8
Open Tender
Civil Works
Item Rate
180 days
AIR FORCE STATION TAMBARAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE AF TAMBARAM
₹95,780
2 Sept 2026
24 Jun 2026
24 Jul 2026
24 Jun 2026
22 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down old cement pole with fitting complete all as specified and directed by Engineer-in-Charge. | 100 | Each | 1 | ₹100 |
| 2 | M&L Hexagonal/Octagonal GI Pole 7m height including Base plate, bolt , nut & Suitable design bracket, necessary connector with control device & etc complete all as specified and directed by Engineer-in-Charge.
Note:- Rate including Earth work and PCC measured and paid separately | 100 | Each | 2 | ₹200 |
| 3 | S&F LED Street light 100W fitting complete with IP 65 and Surge Protection device complete all as specified and directed by Engineer-in-Charge. | 100 | Each | 3 | ₹300 |
| 4 | Excavation in trenches not exceeding 1.5 mtr deep and not exceeding 1.5 mtr wide and getting out in hard/dense soil for complete all as specified and directed by Engineer-in-Charge. | 280 | Cum | 4 | ₹1,120 |
| 5 | Returning filling in soil including providing cable cushioning with riddled earth obtained from excavation, levelling watering and well ramming in layers not exceeding 25cm thick over the cushion layer complete all as specified and directed by Engineer-in-Charge. | 240 | Cum | 5 | ₹1,200 |
| 6 | Removal of surplus soil to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed by Engineer-in-Charge. | 40 | Cum | 6 | ₹240 |
| 7 | Material and labour for DWC HDPE pipe of size 90/76 mm bore (OD X ID) for LT UG cable protection complete all as specified and directed by Engineer-in-Charge. | 900 | RM | 7 | ₹6,300 |
| 8 | M & L for cutting Bitumen macadam / concrete foot path to a depth 0.75 mm with suitable mechanical cutter making good with cement concrete 1 : 2: 4 type B1 (20mm graded aggregate ) complete all as specified and directed by Engineer-in-Charge. | 20 | RM | 8 | ₹160 |
| 9 | M&L for PCC 1:4:8, type D-2, (using 40 mm graded stone aggregate) for foundation, filling and mass concrete complete all as specified and directed by Engineer-in-Charge. | 12 | Cum | 9 | ₹108 |
| 10 | Taking out old unserviceable LT under ground cable in sizes from trench and staging properly for disposable complete all as specified and directed by Engineer-in-Charge. | 950 | RM | 10 | ₹9,500 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
PS.pdf
Additional Documents • 0.32 MB
Tender.pdf
Tender Documents • 0.65 MB
BOQ_867265.xls
BOQ • 0.45 MB
Corrigendum8905.pdf
PDF • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .