| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.1 LAccepted-Finance | ₹40.1 L | L1 | Accepted-Finance Selected in the lottery |
| 2 | L1₹40.1 LRejected-Finance | ₹40.1 L | L1 | Rejected-Finance Not selected in the lottery |
| 3 | L1₹40.1 LRejected-Finance | ₹40.1 L | L1 | Rejected-Finance Not selected in the lottery |
Tender Value
₹40.1 L
EMD Value
₹40,100
Closing Date
12 Mar 2026, 5:00 pmClosed
Superintending Engineer
O/o the Superintending Engineer, Rural Works Division-II, Jajpur at Jaraka
Construction of New Sub Center building at Raichhanda for the year 2023-24
2026_CERWI_126993_1
TENDER ONLINE JJPR-II-08 OF 2025-26
Open Tender
Civil Works - Buildings
270 days
Jaraka
2 documents required · 2 mandatory
₹6,000
₹40,100
Yes
29 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
12 Mar 2026
7 Mar 2026
7 Mar 2026 - 12 Mar 2026
Earth work in excavation of foundation trenches in all kinds of soil including dressing and leveling the bed upto the required depth and depositing the excavated materials with all leads and lifts,shoring & shuttering if required,cost of all labour,T&P required for the work etc.complete as directed by the Engineer-in-charge.
Supplying filling in foundation and plinth with sand including watering ramming, cost, conveyance, royalties and all taxes of materials and cost of all labour with T&P required for the work etc. complete as directed by the Engineer-in-charge.
Cement concrete (1:3:6) in foundation and plinth using 4 cm size hard granite metal of approved quality form approved quarry including hoisting and lowering concrete and laying in layers each layer not exceeding 15 cm in thick, ramming to proper level including watering and curing with cost, conveyance, taxes and royalities of all materials, cost of all labour and T&P required for the work etc.complete as per direction of the Engineer-in-charge.
Brick masonary in cement mortar (1:6) in Foundation & Plinth using Fly ash Bricks of size 10" x 5" x 3" having crushing strength not lessthan 75 Kg/cm2 in Super-structure after immersing the bricks for six hours in water before use in all florrs with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and cost of all labour T&P required for the work etc.complete as per the direction of Engineer in Charge. ---Ground Floor
R.C.C.work of M-25 grade having a minimum comprresive strength (in work test) of 250 kg/cm2 in 15 cm cubes at 28 days using 12mm nominal size black hard crusher broken granite chips including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves and beads whereever necessay including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge.---Column base & Grade beam
Columns & Beams & Wall Beams---Ground Floor
Columns & Beams & Wall Beams---First Floor
Lintel----Ground Floor
Lintel----First Floor
Chajja & Fins---First Floor
Chajja & Fins---Second Floor
Roof Slab---Ground Floor
Roof Slab---First Floor
Stair Case--Ground Floor
Stair Case--First Floor
Providing HYSD bar reinforcement of SAIL/TATA/JINDAL/SHYAM STEEL for R.C.C.work including straightening, cutting, bending, binding, welding if required, tying the grills and placing in proper position as per approved design and drawing including cost, conveyance, taxes of MS/TS rods and binding wire of 18 to 20 gauge binding wire,cost of all labour,T&P materials required for the work etc.complete in all respect as per specification and direction of Engineer - in - Charge.----Ground Floor
Providing HYSD bar reinforcement of SAIL/TATA/JINDAL/SHYAM STEEL for R.C.C.work including straightening, cutting, bending, binding, welding if required, tying the grills and placing in proper position as per approved design and drawing including cost, conveyance, taxes of MS/TS rods and binding wire of 18 to 20 gauge binding wire,cost of all labour,T&P materials required for the work etc.complete in all respect as per specification and direction of Engineer - in - Charge.----First Floor
Brick masonary in cement mortar (1:6) in Super Structure using Fly ash Bricks of size 10" x 5" x 3" having crushing strength not lessthan 75 Kg/cm2 in Super-structure after immersing the bricks for six hours in water before use in all florrs with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and cost of all labour T&P required for the work etc.complete as per the direction of Engineer in Charge. ----Ground Floor
Brick masonary in cement mortar (1:6) in Super Structure using Fly ash Bricks of size 10" x 5" x 3" having crushing strength not lessthan 75 Kg/cm2 in Super-structure after immersing the bricks for six hours in water before use in all florrs with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and cost of all labour T&P required for the work etc.complete as per the direction of Engineer in Charge. ----First Floor
16mm thick cement plaster (1:6)in finished smooth to inside smooth surface of brick walls afrer racking out joints including watering and curing with cost,conveyance taxes and royalties of all materials and cost of all labour with T&P requred for the work complete as per the direction of Engineer in Charge.----Ground Floor
16mm thick cement plaster (1:6)in finished smooth to inside smooth surface of brick walls afrer racking out joints including watering and curing with cost,conveyance taxes and royalties of all materials and cost of all labour with T&P requred for the work complete as per the direction of Engineer in Charge.----First Floor
12mm thick cement plaster (1:6)in finished smooth to outside smooth surface of brick walls afrer racking out joints including watering and curing with cost, conveyance taxes and royalties of all materials and cost of all labour with T&P requred for the work complete as per the direction of Engineer in Charge.----Ground Floor
12mm thick cement plaster (1:6)in finished smooth to outside smooth surface of brick walls afrer racking out joints including watering and curing with cost, conveyance taxes and royalties of all materials and cost of all labour with T&P requred for the work complete as per the direction of Engineer in Charge.----First Floor
6mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slurry treatment with all cost of all materials, labour, conveyence, etc. all complete as per the directions of Er i/c.----Ground Floor
6mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slurry treatment with all cost of all materials, labour, conveyence, etc. all complete as per the directions of Er i/c.----First Floor
Providing and fixing of Vetrified Tiles on floor of size 600x600mm of premium grade conforming to IS 13755 over a bed of cement mortar ( 1:1 ) including grouting the joints with white cement slurry etc complete including cost , conveyance , and taxes of all materials , labour & T&P required for the work as per direction of Engineer - in - charge . -----Ground Floor
Providing and fixing of Vetrified Tiles on floor of size 600x600mm of premium grade conforming to IS 13755 over a bed of cement mortar ( 1:1 ) including grouting the joints with white cement slurry etc complete including cost , conveyance , and taxes of all materials , labour & T&P required for the work as per direction of Engineer - in - charge . -----First Floor
Fixing Ceramic tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. complete in all respect as per the direction of Engineer in Charge.
Fixing chequred tiles in floors,treads and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile.
Finishing surface of wall with cement based wall putty ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding, staging including cost of all materials, labour etc.complete.---Ground Floor
Finishing surface of wall with cement based wall putty ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding, staging including cost of all materials, labour etc.complete.---First Floor
Wall Priming one coat with any approved shade of primer ( WBD ) on New Plastered surface of with any approved primer including cost of primer ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete----Ground Floor
Wall Priming one coat with any approved shade of primer ( WBD ) on New Plastered surface of with any approved primer including cost of primer ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete----First Floor
Distempering two coats with any approved shade including cost of distemper on New Plastered surface including cost of distemper of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete.---Ground Floor
Distempering two coats with any approved shade including cost of distemper on New Plastered surface including cost of distemper of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete.---First Floor
Wall painting two coats with any approved quality of Weather seal coat over one coat of Primerwith any approved shade including cost of paint on New Plastered surface of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete.---Ground Floor
Wall painting two coats with any approved quality of Weather seal coat over one coat of Primerwith any approved shade including cost of paint on New Plastered surface of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete.---First Floor
Providing fitting, fixing of Al. Door with OEL anodized Al. door section 9202 as vertical member, 9201 as top member and 12mm thick pre-laminated board fixed on door frame by means of tapered clip No. 4660 and the frame to be completed by means of jointing angle No. 1885 including all cost of labour, T&P hire charges of drilling machine etc.complete with all taxes royalties & cess etc, complete in all floors as per direction of Engineer-in-charge. ---Ground Floor
Providing fitting, fixing of Al. Door with OEL anodized Al. door section 9202 as vertical member, 9201 as top member and 12mm thick pre-laminated board fixed on door frame by means of tapered clip No. 4660 and the frame to be completed by means of jointing angle No. 1885 including all cost of labour, T&P hire charges of drilling machine etc.complete with all taxes royalties & cess etc, complete in all floors as per direction of Engineer-in-charge. ---First Floor
Supplying , Fitting, fixing up window (sliding type) made up aluminium section 9778 as windows frame, section No 4095, 4096 and 9777, 3994 as shutter frame with 5mm thick plain glass as panel fitted with rubber beading including locking arrangement including all fitting including all cost of materials, labour, T&P, etc all complete as per direction of Er i/c.---Ground Floor
Supplying , Fitting, fixing up window (sliding type) made up aluminium section 9778 as windows frame, section No 4095, 4096 and 9777, 3994 as shutter frame with 5mm thick plain glass as panel fitted with rubber beading including locking arrangement including all fitting including all cost of materials, labour, T&P, etc all complete as per direction of Er i/c.---First Floor
Stair case Railing---Ground Floor
Stair case Railing---First Floor
Supplying,fitting and fixing M.S. made doors and windows in posituion including all etc. complete---Ground Floor
Supplying,fitting and fixing M.S. made doors and windows in posituion including all etc. complete---First Floor
Painting two coats of enamel paint in all floors to new iron work over a coat of primer including sand papering,polishing the surface,including cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paint & primer complete in all respect as per the direction of Engineer in Charge---Ground Floor
Painting two coats of enamel paint in all floors to new iron work over a coat of primer including sand papering,polishing the surface,including cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paint & primer complete in all respect as per the direction of Engineer in Charge---First Floor
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.21 MB
Tendernotice_1.pdf
PDF • 2.81 MB
BOQ_584357.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid