Tender Value
₹8.7 Cr
EMD Value
₹17.5 L
Closing Date
30 Jul 2026, 3:00 pm
Provision of Limited Height Subway (LHS) in lieu of manned LC No. ST-75 at Km. 118.60 between Boinda (BONA) -Jarapada (JRPD) stations in Sambalpur (SBP) - Angul (ANGL) section of Sambalpur Division by Air pushing method.
14-eT-DENE-SBP-26
14-eT-DENE-SBP-26
Open
8 Months
Sambalpur, Odisha
₹0
₹17.5 L
7 Jul 2026
7 Jul 2026
16 Jul 2026
handling, rehandling, loading, unloading, freight, transportation, vehicles, deploring and when &
where required and crossing one or more lines if necessary. (d) All taxes including GST, royalty and
all incidental charges complete.
Item- 1 The items under this schedule should be executed under the supervision of S&T Department.
S No. Item No Description of Item Unit Qty Rate Amount
SAMBALPUR DIVN-ENGG/ECOR
1 1 Alteration of wiring in existing apparatus Numbers 4.00 3583.00 14332.00
cases full/half. This includes supply of all
materials in connection with alteration in
wiring. All the materials shall be supplied
by the contractor at his own cost. This
includes entry of cables, sand filling and
masonry work involved. Lettering and
painting to be done by the contractor at
his own cost. Railway shall supply only
relays and relay bases.
2 2 Dismantling of existing LC gates and Numbers 1.00 10461.00 10461.00
related gears. This includes dismantling,
stacking, accountal of all the materials
including transportation of all the
released materials to the Railway store.
3 3 Dismantling of the signal post/warning Numbers 4.00 3042.00 12168.00
board/Location box with complete fittings.
This includes dismantling, stacking and
accountal of all the materials including
transportation of all released materials to
the Railway store or as instructed by the
4 4 Dismantling of the RCC structure of Numbers 4.00 4306.00 17224.00
Home/Str. or any other signalling
structure with complete fittings. This
includes dismantling, stacking and
accountal of all the materials including
transportation of all released materials to
the Railway store or as instructed by the
5 5 Fixing of cable route marker as per Numbers 50.00 706.00 35300.00
drawing in" section-H" at a distance of
20/50/100 mtrs. Along the trench and at
places where the cable route has taken
diversion as per instruction of site
Engineer, this includes casting of
foundation at site and fixing of the
marker in the foundation made earlier at
site as per railway directives and
specifications, this includes proper curing
of the structure, All materials required for
this like cement, sand 15 mm chips and
steel rod of ISI marks should be supplied
by the tenderer.
6 6 Excavation of trenches of depth 0.8 Meter Kilometre 1.00 71060.00 71060.00
and width 0.3 Meter detailed below
including clearing of roots and trees etc.
for all types of soil. This work also
includes covering of cables laid in trench
and backfilling, ramming, consolidation of
soil as well as disposal of extra soil after
cable is laid as specified in Guidelines on
Signalling Cable laying given by RDSO
and any latest circular issued by
CSTE/ECoR/BBS. Note: Before refilling of
the trenches, the cable laid are to be
tested and recorded for its insulation
value and after satisfaction of site
Engineer the refilling process should start
and after monsoon the route is to be
attended for backfilling the rain cuts,
wash out of soils where ever found.
SAMBALPUR DIVN-ENGG/ECOR
7 7 Excavation of trenches in all kinds of soils Metre 120.00 335.00 40200.00
including soft rocky area and clearing of
track etc. to a depth of 1.0 M and width of
0.3 M for track crossing /pucca road/level
crossing gate/platform/station circulating
area or any other place as advised by site
Engineer including transportation and
laying of DWC/RCC/Split RCC/G.I. pipes
with or without coupler. This includes
repairing of track/pucca road/level
crossing gate/ platform/station circulating
area surface to original position by
ramming and concreting wherever
required soon after the work is over.
DWC/RCC/GI pipes shall be supplied by
the Railway. DWC pipes wherever
required shall be supplied in 6 Mtr. length
and shall be cut to size as per
requirement. All other materials including
cement are to be supplied by the
8 8 Excavation of trenches including clearing Metre 100.00 255.00 25500.00
of roots of trees etc., in rocky area up to a
depth to be indicated by Railway Engineer
at site as per the site condition [Minimum
0.6 meter] and width 0.3 Mts. at the
bottom. This includes concreting &
plastering as per the instructions of site
Engineer and complete b a c k fi l l i n g by
digging earth from a lead of 30 Mtr. In
case 0.8 meter depth or higher is
achieved no concreting is required,
otherwise concreting up to 100 mm
thickness should be done. All materials
required for the above works shall be
supplied by the Contractor.
9 9 Cutting of masonary floor/walls at station Numbers 2.00 6108.00 12216.00
building/ signal goomty/ Gate lodge at a
depth of 0.5 mtr. to 1.0 mtr a t places to
be indicated by site Engineer for entering
of cables inside the building. Only G.I
pipes supplied by Railway and all
materials as clamps, bolts & nuts as
instructed by site Engineer supplied by
tenderer. This includes repairing of
masonary floors/walls after the cables are
taken inside. Cement, Sand required for
the work shall be supplied by the
tenderer and also transportation of G.I
Pipe from Store by the tenderer.
SAMBALPUR DIVN-ENGG/ECOR
10 10 Trenching and fixing of G.I. pipes of Metre 60.00 533.00 31980.00
different sizes/DWC pipes in hard rocky
area up to a depth of 0.3 M to 0.6 M or at
places as per instruction of site Engineer
and concreting [1 : 3 : 6] up to height of
100 mm above the pipes. G.I. pipes with
the socket/ DWC pipes shall be supplied
by the Railway. All other materials
required for the works shall be supplied
by the contractor. Note: [1] In case of
girder bridges, G.I. pipes shall be suitably
clamped by the contractor as advised by
the site Engineer. Clamps shall be
supplied by the contractor. [2] The work
including excavation of trenches in hard
rock area up to a depth of 0.3 M to 0.6 M
and back filling, ramming after
completion of work where ever required.
[3] In case of concrete bridges clearing of
ballast for laying of pipes and re
arranging the Railway ballast after
completion of work shall be done by the
11 11 Laying of Signalling/4 Quad/ 6 Quad/ Kilometre 8.00 24389.00 195112.00
Power Cable/Telecom cables/ Jelly filled
cables of all sizes in excavated trench,
through GI/RCC/DWC pipes etc. wherever
required. This includes transportation of
cables from the stores to work site and
transportation of empty cable drums with
left over cables from site to the stores at .
The length of cable laid includes the
length of cable coil for termination
purpose. NOTE: The cables are to be
carefully handled during loading, un-
loading and transportation to work site.
Any damage found in the cable after final
testing, in view of mishandling of cables,
shall be made good by the Tenderer.
Cable should be maggered before and
after laying and recorded in a register
and submitted to the site Engineer.
SAMBALPUR DIVN-ENGG/ECOR
12 12 Transportation, excavation of pit, casting Numbers 4.00 19438.00 77752.00
of foundation, plastering and erection of
Steel Apparatus case (full size) with fixing
of E-Type lock, wiring, cable entry,
termination clamping, filling cable pit with
sand, painting and lettering etc., as per
Drg.No. S&T/CON/SK/16. This includes
earth work and/or masonry work required
for securing the apparatus case as per
site condition. Railway will supply
apparatus case with 'E' type lock only
from Railway stores at. Tenderer will
supply all wiring materials, PBT
Terminals, fuses, fuse blocks, bus bars,
hylum sheet ISI mark [6mm thickness],
wood plank board of good quality
[minimum 3/4" thick, Cement and
transport all the materials to site of work
at his own cost. The wiring materials such
as wire coils, PBT terminals, fuses, fuse
block, etc. should be used from RDSO
approved sources. 1) Modification of
inside arrangement of Apparatus cases if
required for fixing of relays/transformers
etc. shall be done by the contractor. Extra
shelf, if any, shall be deposited to the
Railway stores by the contractor. 2) All
cables shall be terminated by providing
copper eyelet of suitable size. Note:-(i) If
location box foundation is available at
site 20% of the cost is to be deducted.(ii)
40% payment shall be released after
erection of location boxes.
13 13 Horizontal direction drilling/boring without Metre 200.00 1649.46 329892.00
damage of surface of road/track
formation. The bore shall be 150 mm dia.
and shall be at the proper depth as per
site conditions decided by Enginer-
incharge. The ground level shall be
considered ignoring the bankheight of the
bank of the road. The length of the bore
shall be minimum 04 Mtrs long. This
include insertion of different dia.
DWC/GI/HDPE pipes coupling etc as per
direction of Engineer-in-charge. NOTE:
The cost of pipe is not included in this
item. Contractor shall provide all material
required for boring and adequate nos. of
labourers for proper laying of cables in to
the bore. Cable shall be laid cautiously so
that it should not get damage due to
rough handling and pressure on cable.
SAMBALPUR DIVN-ENGG/ECOR
14 14 Supply, transportation, installation, Numbers 4.00 12306.00 49224.00
testing and commissioning of earth
electrode (make TATA or Jindal as per Rly.
practice) icluding MS flate for signalling
equipments on lever frame, appratus
case, signal, relay racks, cable
termination rack, block instument etc. (
supply & installation of earth electrode as
RE/S&T/DRG/Tender/SK/398/04 for
apparatus cases, signal post & other
equipments as per instruction on earthing
of S&T equipment. Laying of earth lead
mid steel flat of size 35mmx6mm and
fixing of lead MS flat (make TATA/Jindal or
Similar) to earth electrode and lever
frame,signal post & appratus cases as
perDrg. No. CORE/S&T/ALD/SK/591/2008,
592/2008 and 593/2008 respectively and
instructions on earthing at S&T
equipment and providing cement
enclosure for earth electrode as per
drawing no. RE/S&T/Sig/Tender/SK/13/85
Alt.A) NOTE: This includes testing of earth
value and indicating the same on the
Earth enclosure by paint.
15 15 Transportation of signal posts for multiple Numbers 3.00 20931.00 62793.00
aspect color light signals, complete with
signal units, bases, ladders and other
fittings, excavation of pit, casting of
cement concrete foundation, plastering
as per Drg.No Con/SK/T/12, erection and
fixing of complete fittings of the 2/3/4
aspect signal/signal posts including
termination of cables, wiring, LED fixing,
signal testing and focusing. Name plate &
marker and all other materials shall be
provided by the contractor at his own
cost. Required cement shall be supplied
by the contractor. Arrangement of
Screening to be provided by the
contractor if required as instructed by site
Engineer. Contractor shall prepare jointly
with Railway Engineer at site and submit
Signal Sighting report and Signal test
report as per approved format of Railway.
NOTE: (i) 50 % Payment shall be released
after erection of signal post. Balance 50
% shall be released after termination of
cable, wiring, painting, testing & focusing
of signal. (ii) If foundation is available at
site 30% of the cost is to be deducted.
on G.I. Pipes on bridges/ culverts or any
other location as specified by the Rly.
supervisor. All materials including cement
required for the above works are to be
supplied by the tenderer.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCLHSST-75_1.pdf
ATTACHMENT
SCLHSST-75.pdf
ATTACHMENT
Download all tender documents and submit your bid