Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.4 LAdmitted-Finance 1 SRI GOKULAM COMPLEX 15 155B MARAPALAM MADUKKARAI COIMBATORE DISTRICT 641 105 | COIMBATORE | TAMIL NADU | 641105 | ₹51.4 L | L1 | Admitted-Finance |
| 2 | L2₹51.4 L+₹3,938.59 (0.08%)Admitted-Finance 93 SOUTH ZONE COIMBATORE CORPORATION | ERODE | TAMIL NADU | 638459 | ₹51.4 L+₹3,938.59 (0.08%) | L2 | Admitted-Finance |
| 3 | L3₹53.5 L+₹2.1 L (4.18%)Admitted-Finance COIMBATORE CORPORATION | ₹53.5 L+₹2.1 L (4.18%) | L3 | Admitted-Finance |
| 4 | L4₹54.3 L+₹2.9 L (5.63%)Admitted-Finance COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | ₹54.3 L+₹2.9 L (5.63%) | L4 | Admitted-Finance |
| 5 | L5₹57.0 L+₹5.6 L (10.9%)Admitted-Finance | ₹57.0 L+₹5.6 L (10.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | P. K. SHANMUGAM L3 | M RAMARAJ L4 | CHENDUR INFRASTRUCTURE P LTD L5 | SHARVESH AND COMPANY L2 | ABBI ASSOCIATES L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning the Juncle using Mechanical JCB as per the Direction of the Departmental officers Etc., Complete | 45 | Hrs | 500 ₹22,500 Lowest | 744.88 ₹33,519.6 | 800 ₹36,000 | 705.7 ₹31,756.5 | 706 ₹31,770 |
| 2.00 | Providing and laying well gravel including cost and conveyance of all materials from approved quarries as noted in lead chart to the road site including loading, unloading and stacking the well gravel at road site to departmental gauge for pre-measurement including labour charges for laying spreading leveling to camper etc., complete as per specifications., | 57 | m3 | 500 ₹28,499 | 496.9 ₹28,322.31 | 500 ₹28,499 | 470.8 ₹26,834.66 Lowest | 471 ₹26,846.06 |
| 3.00 | Providing Pile foundation of size 300 mm dia using augur including labour charges and all other tools and plants charges etc. , as per direction of dept officers (Local Rate) | 363 | mtr | 250 ₹90,750 Lowest | 292.63 ₹1,06,224.69 | 400 ₹1,45,200 | 277.2 ₹1,00,623.6 | 277 ₹1,00,551 |
| 4.00 | Earth work excavation to all soils with initial lead and lift etc. complete | 22 | m3 | 180 ₹3,960 Lowest | 209.02 ₹4,598.44 | 200 ₹4,400 | 198 ₹4,356 | 198 ₹4,356 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm size HBG metal from approved quarry etc. complete | 47 | m3 | 5,000 ₹2,34,990 Lowest | 5,408.37 ₹2,54,182.57 | 5,700 ₹2,67,888.6 | 5,124 ₹2,40,817.75 | 5,123 ₹2,40,770.75 |
| 6.00 | Centering with steel plates for sides & soffits etc. complete For Plinth Beam | 298 | m2 | 1,000 ₹2,98,000 | 1,014.89 ₹3,02,437.22 | 1,000 ₹2,98,000 | 961.5 ₹2,86,527 | 961 ₹2,86,378 Lowest |
| 7.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 71 | m3 | 9,500 ₹6,74,521.85 | 9,258.29 ₹6,57,359.88 | 10,000 ₹7,10,023 | 8,771 ₹6,22,761.17 | 8,770 ₹6,22,690.17 Lowest |
| 8.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications - 1 Quintal | 71 | Qtl. | 9,300 ₹6,60,321.39 | 9,066 ₹6,43,706.85 | 9,500 ₹6,74,521.85 | 8,589 ₹6,09,838.75 | 8,588 ₹6,09,767.75 Lowest |
| 9.00 | Plain cement concrete 1:2:4 mix (One cement two M.Sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3 (detailed data for 10 m3 ) | 27 | m3 | 7,200 ₹1,94,401.01 | 6,904.22 ₹1,86,414.91 | 7,200 ₹1,94,401.01 | 6,541 ₹1,76,607.92 | 6,540 ₹1,76,580.92 Lowest |
| 10.00 | Brick work in cement mortar 1:5 mix using Fly Ash bricks of 230x110x70mm (8 3/4" x 41/4" x 23/4") including cost of materials and labour charges etc., as per standard specification - 1m | 23.01 | m3 | 6,800 ₹1,56,472.76 | 6,635.93 ₹1,52,697.39 | 7,000 ₹1,61,074.9 | 6,287 ₹1,44,668.27 | 6,286 ₹1,44,645.26 Lowest |
Tender Value
₹69 L
EMD Value
₹69,000
Closing Date
18 Jun 2026, 3:00 pmClosed
The commissioner, coimbatore
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Compound Wall and Toilet with Improvement Works to the Play Ground at Pullukadu in Ward No.86, South Zone.
2026_MAWS_679802_4
e34/2026-Two cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
As Per Tender Documents
4 documents required · 4 mandatory
₹0
₹69,000
1 Jul 2026
6 Jun 2026
19 Jun 2026
6 Jun 2026
18 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning the Juncle using Mechanical JCB as per the Direction of the Departmental officers Etc., Complete | 45 | Hrs | - | - |
| 2 | Providing and laying well gravel including cost and conveyance of all materials from approved quarries as noted in lead chart to the road site including loading, unloading and stacking the well gravel at road site to departmental gauge for pre-measurement including labour charges for laying spreading leveling to camper etc., complete as per specifications., | 57 | m3 | - | - |
| 3 | Providing Pile foundation of size 300 mm dia using augur including labour charges and all other tools and plants charges etc. , as per direction of dept officers (Local Rate) | 363 | mtr | - | - |
| 4 | Earth work excavation to all soils with initial lead and lift etc. complete | 22 | m3 | - | - |
| 5 | Cement concrete 1:4:8 mix using 40mm size HBG metal from approved quarry etc. complete | 47 | m3 | - | - |
| 6 | Centering with steel plates for sides & soffits etc. complete For Plinth Beam | 298 | m2 | - | - |
| 7 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 71 | m3 | - | - |
| 8 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications - 1 Quintal | 71 | Qtl. | - | - |
| 9 | Plain cement concrete 1:2:4 mix (One cement two M.Sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - 1 m3 (detailed data for 10 m3 ) | 27 | m3 | - | - |
| 10 | Brick work in cement mortar 1:5 mix using Fly Ash bricks of 230x110x70mm (8 3/4" x 41/4" x 23/4") including cost of materials and labour charges etc., as per standard specification - 1m | 23.01 | m3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Above50Lakh.pdf
Tender Documents • 1.33 MB
ITB.pdf
Additional Documents • 0.20 MB
BOQ_816794.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .