Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹6.8 L+₹94,937.94 (16.1%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹7.4 L+₹1.5 L (25.6%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹11.0 L+₹5.1 L (86.0%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹9.5 L
EMD Value
₹18,980
Closing Date
5 Mar 2026, 6:55 pmClosed
Commissioner, Municipal Corporation Udaipur
Municipal Corporation Udaipur, Town Hall Link Road
Laying of sewer line in gali near sunder hotel, chetak circle, ward 66 (e_37 / Nirman_02)
2026_DLB_541839_1
E_37_2025-26_Nirman_02
Open Tender
Civil Works
Percentage
62 days
Udaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Commissioner, Municipal Corporation Udaipur
₹18,980
Yes
16 Mar 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated
material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top
level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. In all types soils/ saturated soil such as moorum, sand, sandy silt,
clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 106 | cum | 299 | ₹31,694 |
| 2 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated
material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top
level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. In ordinary rock.
Depth upto 1.5 m | 58 | cum | 1,262 | ₹73,196 |
| 3 | Carriage of Materials by mechanical transport including
loading, unloading and stacking :: Earth up to 5km | 164 | cum | 254.76 | ₹41,780.64 |
| 4 | Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as per specifications with rubber rings with socket and spigot joint,
(EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and
conveyance of water to site for testing) and commissioning etc complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the
outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.
110 mm Nominal Dia | 75 | mtr | 263.5 | ₹19,762.5 |
| 5 | Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as
per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and
conveyance of water to site for testing) and commissioning etc complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the
outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.
160 mm Nominal Dia | 50 | mtr | 548 | ₹27,400 |
| 6 | PProviding, fixing and constructing of pre-cast RCC M-40 grade
circular manholes with internal dia 1.0m and up to specified depth
having pre-cast RCC M-40 grade circular manhole cover frame (ID
0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.0m,
vertical height 0.805m, wall thickness 125mm), and circular rings of required heights (ID 1.0m, height 150/225/300/600 mm, wall thickness 125mm) below conical piece as per required depth of
manhole and having steel reinforcement in conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 1.625m dia and 150mm thickness, PCC M15 grade circular wall ID 0.925m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and
channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS foot steps / SFRC foot steps, including cost of shuttering, steel reinforcement, testing for water tightness etc. complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid
separately. Pre-cast RCC M-40 grade circular manholeconical piece with inbuilt cover and frame (height 0.805), cast-in-situ PCC M-10 grade oundation, PCC M15 grade circular wall ID 0.925m, wall thickness
200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item= height of
Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe +
50mm) | 7 | each | 14,500 | ₹1,01,500 |
| 7 | Constructing providing and fixing of pre-cast RCC M-40 grade circular Road Side Inspection Chamber including earthwork with following dia and depth cylindrical piece with 100mm wall thickness, inbuilt 100mm thick base slab, inbuilt cover & frame on top, provision
for 110mm OD in and out sewer connection with making proper inbuilt benching and channel with PCC M-15 grade including providing cast-in-situ 100mm thick base foundation of PCC M-10 grade, supplying and fixing circular precast SFRC Circular 300 / 450 mm dia manhole cover with frame MD-10 (as per IS-12592 amended upto date), including steel reinforcement minimum @ 80kg/cum, testing for water tightness complete in all respect as per drawing, specification and the direction of the Engineer. PrPre-cast Road side inspection chamber of 450mm dia (internal), 600mm depth and 750mm dia base foundation | 12 | each | 6,220 | ₹74,640 |
| 8 | Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in
layers of thickness 10/15cm including ramming, consolidation etc complete for PVC/HDPE pipes of following sizes as per drawing and or as directed by Engineer. 200mm nominal dia | 100 | mtr | 146.5 | ₹14,650 |
| 9 | Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths full round HDPE DWC (double wall corrugated) pipes of SN8 grade as per IS 16098 (Part 2) amended upto date in trenches in complete including all material, labour, sectional hydro
testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications, drawings and as per direction of Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 200 mm ID | 100 | mtr | 618 | ₹61,800 |
| 10 | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40
mm nominal size). | 40 | cum | 4,575 | ₹1,83,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_965868.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .