| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹3.6 L (3.43%)Rejected-Finance | ₹1.1 Cr+₹3.6 L (3.43%) | L2 | Rejected-Finance Above Estimate Rate |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
27 Oct 2023, 3:00 pmClosed
Project Director, DRDA, Sivagangai
DRDA, Sivagangai
Strengthening and Five year Maintenance of Andur Road To Sundoorani road in Devakottai Block of Sivagangai District under NABARD - RIDF - XXIX - 2023-24
2023_RDTN_378546_1
NABARD_XXIX_DVK_Pack_11
Open Tender
Civil Works - Roads
Item Rate
180 days
Sivagangai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.1 L
22 Dec 2023
13 Oct 2023
27 Oct 2023
13 Oct 2023
27 Oct 2023
13 Oct 2023
Amount
STRENGTHENING OF THE ROAD FROM ANANDUR ROAD TO SUNDOORANI KM 0/0 to 1/750
Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by lipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
providing and laying Bituminious concrete to 40mm thick using 0.13cum(of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required.) including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
1.50M span @800m
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 208 including all
Collection and filling of river M.sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation
Providing Concrete for plain/reinforced concrete (1:4:8)in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supplying and erecting shuttering for CC Works including cost and conveyance of all materials to site etc., complete
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc.. complete.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification. The bind
Cement Concrete 1:2:4mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
Reinforced Cement Concrete 1.1 1/2.3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance g of all materials to site for Deck Slab
collection and supply of gritty Gravel from approved quarry including cost and conveyance of gravel etc complete complying with std specification and as directed by the dept.officer
3.00m span@70m,200m
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 208 including all
Collection and filling of river M.sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation
Providing Concrete for plain/reinforced concrete (1:4:8)in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supplying and erecting shuttering for CC Works including cost and conveyance of all materials to site etc., complete
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc.. complete.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification. The bind
Cement Concrete 1:2:4mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
Reinforced Cement Concrete 1.1 1/2.3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance g of all materials to site for Deck Slab
collection and supply of gritty Gravel from approved quarry including cost and conveyance of gravel etc complete complying with std specification and as directed by the dept.officer
Toe wall 800-856M
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 208 including all toe wall
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation toe wall
Cement Concrete 1:4:8 mix using 40mm ISS metal including cost of conveyance of all materials and all labour charges etc., complete for foundation roe wall
Cement Concrete 1:3:6 mix using 40mm ISS metal including cost of conveyance of all materials and all labour charges etc., complete for foundation roe wall
Erection huttering and strutting to the soffits of vertical stucture including costand conveyance of all materilas to site ect., complete Toe wall
provision for hectameter stone of size0.75mmx0.15mx0.10m
provision for kilometer stone of size1.65mmx0.35mx0.25m
PHOTO CHARGES
NAME OF BOARD
provision for cautionary sign boards
provision for Mandatory sign boards
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
KANNAN AND CO
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .