| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹65.6 L+₹23.3 L (55.1%)Admitted-Finance 141 SAHYOG VIHAR APEX BANK COLONY E 8 EXTENSION NEAR GULMOHAR COLONY BHOPAL M P 462039 | BHOPAL | BHOPAL | MADHYA PRADESH | 462039 | L2 | Admitted-Finance | |
| 3 | L3₹84.0 L+₹41.7 L (98.7%)Admitted-Finance N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ARKITECHNO CONSULTANTS (INDIA) PVT. LTD. L3 | SPS Technnocrats Pvt. Ltd. L1 | Infrastructure development consultants L2 |
|---|---|---|---|---|---|---|
| 1.00Professional Staff : | ||||||
| 2.00 | Team Leader Cum Senior Highway Engineer | 9 | Month | 80,000 ₹7,20,000 | 35,000 ₹3,15,000 Lowest | 60,000 ₹5,40,000 |
| 3.00 | Senior Bridge Engineer | 5 | Month | 45,000 ₹2,25,000 | 30,000 ₹1,50,000 Lowest | 40,000 ₹2,00,000 |
| 4.00 | Highway cum Pavement Engineer | 6 | Month | 45,000 ₹2,70,000 | 30,000 ₹1,80,000 Lowest | 40,000 ₹2,40,000 |
| 5.00 | Material-cum-Geotechnical Engineer-Geologist | 5 | Month | 35,000 ₹1,75,000 | 30,000 ₹1,50,000 Lowest | 40,000 ₹2,00,000 |
| 6.00 | Senior Survey Engineer | 6 | Month | 35,000 ₹2,10,000 | 30,000 ₹1,80,000 Lowest | 40,000 ₹2,40,000 |
| 7.00 | Traffic and Safety Expert | 3 | Month | 45,000 ₹1,35,000 | 30,000 ₹90,000 Lowest | 40,000 ₹1,20,000 |
| 8.00 | Environmental Specialist cum Forest Expert | 1 | Month | 35,000 ₹35,000 | 30,000 ₹30,000 Lowest | 40,000 ₹40,000 |
| 9.00 | Quantity Surveyor/Documentation Expert | 4 | Month | 25,000 ₹1,00,000 Lowest | 30,000 ₹1,20,000 | 40,000 ₹1,60,000 |
| 10.00 | Land Acquisition, Forest Diversion Expert | 7 | Month | 45,000 ₹3,15,000 | 25,000 ₹1,75,000 Lowest | 40,000 ₹2,80,000 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
2 Jan 2023, 5:00 pmClosed
S E N H Circle Nagpur
Civil line Nagpur
Consultancy services for Preparation of Detailed Project Report and Feasibility study for Construction of 2 lane CC Road with paved shoulder on Dahegaon- Kuhi Umred section of NH-247 from Km 17.870 to 32.000 and 51.420 to 72.000 Including Feasibility
2022_MoRTH_722948_1
NIT-13/EENH/NGP/2022-23
Open Tender
Civil Works
Item Rate
270 days
Kuhi Umred
Consultancy services for Preparation of Detailed Project Report and Feasibility study for Construction of 2 lane CC Road with paved shoulder on Dahegaon- Kuhi Umred section of NH-247 from Km 17.870 to 32.000 and 51.420 to 72.000 Including Feasibility
8 documents required · 8 mandatory
₹10,000
Yes
Pay online in Bharatkosh
₹1.5 L
Yes
CE N H Mumbai
13 Sept 2023
11 Nov 2022
3 Jan 2023
11 Nov 2022
2 Jan 2023
9 Dec 2022
5 Dec 2022
Amount
Professional Staff :
Team Leader Cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer-Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist cum Forest Expert
Quantity Surveyor/Documentation Expert
Land Acquisition, Forest Diversion Expert
Utility Expert
Sub Professional Staff : 3 Nos. (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
Support Staff (To be assessed by consultant as per requirment)
Office Manager
Typist
Office Boy
Night Watchman
Transportation : 2 Nos The vehicle sprovided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A.Foruseof consultants
For Conusltant: Innova or Equivalent (Not more than 2 years old)
For Authority: Innova or Equivalent (Not more than 2 years old)
Duty Travel to Site (Fixed Costs) :
Office Rent : (The rent cost includes maintenance, cleaning, repairs, etc. )
Office Supplies, Utilities and Communication :
Office Supplies Drafting
Supplies Computer
Running Costs
Domestic & International Communication
Office Furniture and Equipment (Rental) :
Reports and Document Printing
Monthly Report (3 Per Month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports & Forest Reports
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc. (& Draft EMP)
Draft Bidding Documents (& Draft EMP)
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. (& Final EMP)
Final Bidding Documents
Survey and Investigation :
A. Topographical Survey :
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer etc.
B. Investigation (Fixed Cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey / Studies
Land Acquisition Studies & Proposal
Forest Diversion Studies & Proposal
C. Net Work Survey and GPR :
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.
GPR Survey for detection of underground utilities.
Detailed Project Report preparation for Bypass to Railway crossing at 17/870 in Kamptee village if found feasible.
*Sub-Soil Investigation(Boring) for Bridges. a) Boring in all type of soils (other than hard rock): 500 mtr
b) Boring in Hard Rock : 100 Mtr
Cost of supply and fixing Centre Line & Boundary Pillars :
Infrastructure development consultants
ARKITECHNO CONSULTANTS (INDIA) PVT. LTD.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .