| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical 4TH FLOOR UNIPUNCH CROWN SAI NAGAR AMBATTUR INDUSTRIAL ESTATE CHENNAI 600058 | CHENNAI | CHENNAI | TAMIL NADU | 600058 | Rejected-Technical Techno Commercially Not Acceptable. |
Tender Value
Refer Docs
Closing Date
12 Mar 2020, 5:00 pmClosed
LTHE
LARSEN AND TOUBRO HYDROCARBON ENGINEERING LIMITED, 5TH FLOOR, GATE NO 5, LARSEN AND TOUBRO CENTER, SAKI VIHAR ROAD, POWAI, MUMBAI, MAHARASHTRA 400072
PROJECT OF ETHANOL PRODUCTION FROM PSA OFF GAS OF HGU (76 and 77 UNITS) AT PANIPAT REFINERY PETROCHEMICALS COMPLEX
2020_REFHQ_111528_1
E1148-U05-SC-TD-063247
Limited
Mechanical - Pumps, Compressors, Steam Turbines and Other Equipment
Supply
180 days
Please refer tender documents
3 documents required · 3 mandatory
Exempted
17 Aug 2020
22 Jan 2020
13 Mar 2020
22 Jan 2020
12 Mar 2020
5 Feb 2020
22 Jan 2020 - 12 Mar 2020
Supply of Inoculator Start-up Pump along with Mandatory Spares Tag No: 112-P-0008
Supply of CRWS Pump along with Mandatory Spares Tag No: 112-P-0075
Supervision of installation, commissioning and testing (Note-8 above) Per diem charges (per person) for 8 hours work on normal working days (Monday to Saturday)
Supervision of installation, commissioning and testing (Note-8 above) Overtime rate/ hour beyond normal 8 hours work on normal working days.
Supervision of installation, commissioning and testing (Note-8 above) Overtime rate/hour for work on weekly off days/ holidays (as applicable at Project site).
Customer Training (Note - 7 above)
Description of Work / Item(s)
Supply of Inoculator Start-up Pump along with Mandatory Spares Tag No: 112-P-0008
Supply of CRWS Pump along with Mandatory Spares Tag No: 112-P-0075
Supervision of installation, commissioning and testing (Note-8 above) Per diem charges (per person) for 8 hours work on normal working days (Monday to Saturday)
Supervision of installation, commissioning and testing (Note-8 above) Overtime rate/ hour beyond normal 8 hours work on normal working days.
Supervision of installation, commissioning and testing (Note-8 above) Overtime rate/hour for work on weekly off days/ holidays (as applicable at Project site).
Customer Training (Note - 7 above)
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .