| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC 0 RAGHAVPUR ORHA TIKAMGARH DISTRICT TIKAMGARH MADHYA PRADESH | TIKAMGARH | TIKAMGARH | MADHYA PRADESH | ₹2.1 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹2.5 Cr+₹35.1 L (16.6%)Rejected-Finance | ₹2.5 Cr+₹35.1 L (16.6%) | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | M/S UMESH KUMAR THEKEDAR L2 | M/s Suresh Chand Gupta L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in Foundation i/c all labour, T&P etc complete. | 794 | M3 | 100 ₹79,400 | 85.41 ₹67,815.54 Lowest |
| 2.00 | Providing and injecting constructional anti-termite treatment and creating and chemical barrier under and around the coloumn pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the external per meter of binding expansion joints surrounding of pipes and conduit etc, complete (plinth area of the building at ground floor only shall be measured as per I.S 6313 (part 2013) IMIDACLOPRID SC 30.5 concentrate or any other approved material such as Hepthachlor of Chlordane will be used. The rate of application of chemical emulsion shall be as follows.:- (1) Treatment for masonry and foundation 5 liters per Sq.M (2) Back fill in immediate contact with foundation 7.5 liters per Sq.M (3) Treatment of top surface of plinth filling 5 liters per Sq.M (4) Treatment of soil along external per meter of Building 7.50 liters per Sq.M (5) Treatment of soil under apron along external per meter 5 liters per Sq.M | 430 | M2 | 200 ₹86,000 | 161.03 ₹69,242.9 Lowest |
| 3.00 | Providing and Laying PCC 1:2:4 including all cost of labour, material, T&P etc. complete. | 217 | M3 | 2,500 ₹5,42,500 Lowest | 4,158.24 ₹9,02,338.08 |
| 4.00 | Centering & shuttering for R.C.C. work including all cost of labour material T&P etc complete. | 1,843 | M2 | 540 ₹9,95,220 | 451.93 ₹8,32,906.99 Lowest |
| 5.00 | R.C.R. stone masonry work with 1:4 cement sand mortar including cost of all material and labour T&P etc. | 179 | M3 | 4,800 ₹8,59,200 | 4,452 ₹7,96,908 Lowest |
| 6.00 | Earth work in Mar, Rankar and kankar mixed soils in digging or in embankment including lead up to 595 m. and lift up to 1.5m. including dressing making profile and manual compaction but excluding mechanical compaction. | 505 | M3 | 100 ₹50,500 Lowest | 212.98 ₹1,07,554.9 |
| 7.00 | Providing and Laying R.C.C. M-25 (1:1:2) with cement sand and stone grit (10-20 mm) size i/c all cost of material and labour, T&P etc. for proper compaction of work. | 410 | M3 | 5,900 ₹24,19,000 | 5,636.94 ₹23,11,145.4 Lowest |
| 8.00 | Brick work in 1:4 cement mortar i/c all labour, material, t&p etc complete. | 344 | M3 | 6,500 ₹22,36,000 | 5,896.5 ₹20,28,396 Lowest |
| 9.00 | 12.50 mm Cement Sand plaster in 1:4 c.m. i/c all material, labour, t&p etc. complete. | 2,770 | M2 | 170 ₹4,70,900 | 129.37 ₹3,58,354.9 Lowest |
| 10.00 | 20.00 mm thick Cement Sand plaster in 1:4 c.m. i/c mixing water proofing compound, all material, labour, t&p etc. complete. | 2,079 | M2 | 170 ₹3,53,430 Lowest | 203.35 ₹4,22,764.65 |
Tender Value
₹2.7 Cr
EMD Value
₹5.4 L
Closing Date
15 Jul 2026, 2:00 pmClosed
SE IWC LALITPUR
OFFICE OF SE IWC LALITPUR
Project for construction of Type III Residential Building in Govind Sagar Dam Compus, at District Lalitpur LOT -1
2026_UPIDC_1165111_5
01/SE/2026-27
Open Tender
Civil Works
Item Rate
270 days
LALITPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,190
₹5.4 L
Yes
3 Sept 2026
1 Jul 2026
15 Jul 2026
1 Jul 2026
15 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in Foundation i/c all labour, T&P etc complete. | 794 | M3 | - | - |
| 2 | Providing and injecting constructional anti-termite treatment and creating and chemical barrier under and around the coloumn pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the external per meter of binding expansion joints surrounding of pipes and conduit etc, complete (plinth area of the building at ground floor only shall be measured as per I.S 6313 (part 2013) IMIDACLOPRID SC 30.5 concentrate or any other approved material such as Hepthachlor of Chlordane will be used. The rate of application of chemical emulsion shall be as follows.:- (1) Treatment for masonry and foundation 5 liters per Sq.M (2) Back fill in immediate contact with foundation 7.5 liters per Sq.M (3) Treatment of top surface of plinth filling 5 liters per Sq.M (4) Treatment of soil along external per meter of Building 7.50 liters per Sq.M (5) Treatment of soil under apron along external per meter 5 liters per Sq.M | 430 | M2 | - | - |
| 3 | Providing and Laying PCC 1:2:4 including all cost of labour, material, T&P etc. complete. | 217 | M3 | - | - |
| 4 | Centering & shuttering for R.C.C. work including all cost of labour material T&P etc complete. | 1,843 | M2 | - | - |
| 5 | R.C.R. stone masonry work with 1:4 cement sand mortar including cost of all material and labour T&P etc. | 179 | M3 | - | - |
| 6 | Earth work in Mar, Rankar and kankar mixed soils in digging or in embankment including lead up to 595 m. and lift up to 1.5m. including dressing making profile and manual compaction but excluding mechanical compaction. | 505 | M3 | - | - |
| 7 | Providing and Laying R.C.C. M-25 (1:1:2) with cement sand and stone grit (10-20 mm) size i/c all cost of material and labour, T&P etc. for proper compaction of work. | 410 | M3 | - | - |
| 8 | Brick work in 1:4 cement mortar i/c all labour, material, t&p etc complete. | 344 | M3 | - | - |
| 9 | 12.50 mm Cement Sand plaster in 1:4 c.m. i/c all material, labour, t&p etc. complete. | 2,770 | M2 | - | - |
| 10 | 20.00 mm thick Cement Sand plaster in 1:4 c.m. i/c mixing water proofing compound, all material, labour, t&p etc. complete. | 2,079 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
SBDLot1.pdf
Tender Documents • 5.68 MB
BOQ_2185501.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .