Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.6 LAccepted-AOC MANDI HIMACHAL PRADESH | L1 | Accepted-AOC Awarded | |
| 2 | L2₹28.7 L+₹1.2 L (4.24%)Rejected-Finance SHIMLA MUNICIPAL CORPORATION | SHIMLA | HIMACHAL PRADESH | 171001 | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹31.0 L+₹3.4 L (12.4%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest | |
| 4 | L4₹43.3 L+₹15.7 L (57.1%)Rejected-Finance | L4 | Rejected-Finance 4th Lowest | |
| 5 | L5₹46.1 L+₹18.5 L (67.2%)Rejected-Finance | L5 | Rejected-Finance 5th Lowest |
Tender Value
₹21.9 L
EMD Value
₹40,300
Closing Date
27 Jul 2020, 4:00 pmClosed
Executive Engineer Division No-I HPPWD Shimla-3
Executive Engineer Division No-I HPPWD Shimla-3
C/o Retaining wall pehind community centre Building kelston shimla HP
2020_PWD_38834_1
SD-I-CTR-Tender/2020- 4515 dt 30-06-2020
Open Tender
Civil Works
Item Rate
90 days
Shimla
As per SBD
14 documents required · 14 mandatory
₹500
Executive Engineer Division No-I HPPWD Shimla-3
₹40,300
18 Sept 2020
10 Jul 2020
28 Jul 2020
10 Jul 2020
27 Jul 2020
10 Jul 2020
Amount
Dismantling of existing strucutres like culverts, bridge, retaining walls and other structure comprising of stone masonry including disposal of un-serviceable material as per technical specification clause 202 in all leads and lifts as per directions of the Engineer-in-Charge. (i) Rubble stone masonry in cement mortar.
Cutting in earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per the directions of the Engineer-in-Charge. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Earth work in excavation for structure in all depths as per drawing and technical specification for rural roads August 2004 clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all leads and lift including dressing of sides and bottom and back filling in trenches with excavated suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where balsting is prohibited) all earth work in cutting/ excavation including rock excavation shall be carried out true to lines grades, side slopes, width , camber super elevation and level as shown on the drawings or as directed by the Engineer-in-charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified dimension or as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be remove by suitable diversion bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. All the surplus excavated earth to be dumped at dumping site(dumping sites will be arranged by the contractor on his own cost).Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be dully compensated by him at his on cost in all cases. including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802,803, 1202 & 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (I)P.C.C. grade M 10(I ) Nominal mix 1:3:6(One cement:Three sand: Six graded stone aggregate).
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802,803, 1202 & 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (I)R.C.C. grade M 20 (i) Nominal mix 1:2:4 (One cement :Two sand: Four graded stone aggregate )
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Backfilling behind abutment, wing wall and return wall complete as per specification clause 1204.3.8 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) Granular material.
Providing weepholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm(one hundred milimetre) dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Disposal of excavated surplus earth by mechanical transport on approved dumping site surrounding Shimla through all mode of transportation including head load or mechanical means alongwith its levelling and top complete the work including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Ashu Chauhan
BHARAT SINGH CHAUHAN
Suresh Vekta
Sunil Khachi
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .