Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹1.5 Cr+₹8.6 L (6.27%)Rejected-Finance VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | L2 | Rejected-Finance 2nd Lowest | |
| 3 | Rejected-Technical ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | - | Rejected-Technical Rejected | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | M/S ADITYA CONSTRUCTION COMPANY L2 | M/S RAM NATH SHUKLA L1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work in correcting internal section of Soraon branch from km 0.000 to km 4.459 by hydrraulick excavator (poclain/JCB) with side slop cutting at required slop including all lead & lift in all type of soil with proper disposal , compaction & dressing of bank and daula as per direction of Engineer in charge. | 43,126.82 | Cum | 67 ₹28,89,496.94 | 52 ₹22,42,594.64 Lowest |
| 2.00 | Earth Work in Restoration of Daula of Soraon branch From km. 0.000 to 4.459 with manual compaction and dressing as per direction of engineer in charge. | 3,210.48 | Cum | 119 ₹3,82,047.12 | 100 ₹3,21,048 Lowest |
| 3.00 | Earth Work in excavation of foundation in all type of soil including all lead,lift T&P etc. complete. As per direction of Engineer in charge. | 3,156.92 | Cum | 100 ₹3,15,692 Lowest | 100 ₹3,15,692 Lowest |
| 4.00 | Laying Plain Cement Concrete in 1:3:6 with maximum size of 40 mm crushed stone ballast & Coarse sand having F.M. not less than 2.0 including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. | 604.28 | Cum | 5,800.04 ₹35,04,848.17 | 5,800 ₹35,04,824 Lowest |
| 5.00 | 1st class B/W in 1:4 C.M. Coarse sand having F.M. not less than 2.0 including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. | 581.4 | Cum | 6,145.23 ₹35,72,836.72 | 6,145 ₹35,72,703 Lowest |
| 6.00 | Supply & Laying LDPE Film below C.C Lining including all cost of material,labour T&P etc. complete. As per direction of Engineer in charge. | 3,975 | Sqm | 39.5 ₹1,57,012.5 | 35 ₹1,39,125 Lowest |
| 7.00 | Laying Plain Cement Concrete in 1:2:4 with maximum size 20 mm crushed stone ballast & Coarse sand having F.M. not less than 2.0 including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. | 413.41 | Cum | 7,639.63 ₹31,58,299.44 | 7,639 ₹31,58,038.99 Lowest |
| 8.00 | Cement pointing 1:2 (struck deep ) C.M. including all cost of labour,materials,T&P etc. for proper completion of work. As per direction of Engineer in charge. | 242.01 | Sqm | 139.11 ₹33,666.01 | 100 ₹24,201 Lowest |
| 9.00 | Cement Plastering 1:4 C.M. including all cost of labour,materials,T&P etc. for proper completion of work. As per direction of Engineer in charge. | 439.09 | Sqm | 201.43 ₹88,445.9 | 150 ₹65,863.5 Lowest |
| 10.00 | Ist class brick soling on edge both side i/c cost of Labour & T&P etc. complete. As per direction of Engineer in charge. | 136.5 | Sqm | 520.22 ₹71,010.03 | 400 ₹54,600 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
22 May 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
S.E. 18th Circle Irrigation Works, Govindpur, Prayagraj
Construction of Pucca work and Restoration of Soraon branch from km 0.000 to 4.459 in Pratapgarh District. (Lot-04)
2026_UPIDC_1148511_4
01/S.E./2026-27
Open Tender
Civil Works - Canal
Item Rate
S.E. 18th Circle Irrigation Works Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,813
₹2.9 L
Prayagraj
30 Sept 2026
15 May 2026
22 May 2026
15 May 2026
22 May 2026
15 May 2026
16 May 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in correcting internal section of Soraon branch from km 0.000 to km 4.459 by hydrraulick excavator (poclain/JCB) with side slop cutting at required slop including all lead & lift in all type of soil with proper disposal , compaction & dressing of bank and daula as per direction of Engineer in charge. | 43,126.82 | Cum | - | - |
| 2 | Earth Work in Restoration of Daula of Soraon branch From km. 0.000 to 4.459 with manual compaction and dressing as per direction of engineer in charge. | 3,210.48 | Cum | - | - |
| 3 | Earth Work in excavation of foundation in all type of soil including all lead,lift T&P etc. complete. As per direction of Engineer in charge. | 3,156.92 | Cum | - | - |
| 4 | Laying Plain Cement Concrete in 1:3:6 with maximum size of 40 mm crushed stone ballast & Coarse sand having F.M. not less than 2.0 including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. | 604.28 | Cum | - | - |
| 5 | 1st class B/W in 1:4 C.M. Coarse sand having F.M. not less than 2.0 including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. | 581.4 | Cum | - | - |
| 6 | Supply & Laying LDPE Film below C.C Lining including all cost of material,labour T&P etc. complete. As per direction of Engineer in charge. | 3,975 | Sqm | - | - |
| 7 | Laying Plain Cement Concrete in 1:2:4 with maximum size 20 mm crushed stone ballast & Coarse sand having F.M. not less than 2.0 including all cost of labour,materials,T&P etc. compaction required for proper completion of work. As per direction of Engineer in charge. | 413.41 | Cum | - | - |
| 8 | Cement pointing 1:2 (struck deep ) C.M. including all cost of labour,materials,T&P etc. for proper completion of work. As per direction of Engineer in charge. | 242.01 | Sqm | - | - |
| 9 | Cement Plastering 1:4 C.M. including all cost of labour,materials,T&P etc. for proper completion of work. As per direction of Engineer in charge. | 439.09 | Sqm | - | - |
| 10 | Ist class brick soling on edge both side i/c cost of Labour & T&P etc. complete. As per direction of Engineer in charge. | 136.5 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_2149947.xls
BOQ • 0.31 MB
Soraon.pdf
Tender Documents • 3.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .