| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-AOC PATRA MARKET KRISHANAGAR NADIA | KRISHANAGAR | NADIA | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.1 L+₹60,215.24 (2.46%)Rejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L2 | Rejected-Finance L2 | |
| 3 | L3₹25.9 L+₹1.4 L (5.52%)Rejected-Finance BHAGIRATHIPUR DOMKAL MSD | DOMKAL | MURSHIDABAD | WEST BENGAL | 742101 | L3 | Rejected-Finance L3 | |
| 4 | L4₹26.3 L+₹1.8 L (7.23%)Rejected-Finance GARUI PASCHIM PARA KOLKATA 700065 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700065 | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹51,528
Closing Date
17 Nov 2021, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla, Kolkata- 700027
Illumination and water supply arrangement at different station of Kachuberia in connection with Ganga Sagar Mela 2022
2021_PHED_346651_1
WBPHE/EE/SMD/NIeT- 10 of 2021-2022
Open Tender
Electrical Work/ Equipment
Item Rate
60 days
Kachuberia
Please refer Tender documents.
6 documents required · 6 mandatory
₹51,528
Yes
10 Feb 2022
11 Oct 2021
23 Nov 2021
11 Oct 2021
17 Nov 2021
11 Oct 2021
Amount
Dismantling the damaged safety device and continuous earthing wire from the existing position on the PCC pole and properly stacking the same at the departmental store at Sagar as per direction of the EIC
Dismantling the existing damaged ACSR conductor by single run from end pole to end pole after disconnection all jointing materials i.e. jumper, insulator, safety device, binding wire from the PCC pole in different places at Kachuberia area as per direction of the EIC
Dismantling the existing damaged D type iron clamp, pole clamp from PCC pole at Kachuberia area and other damaged materials return to the departmental store at Sagar as per direction of the EIC
Supply and delivery at site of the following electrical accessories:
Supply of suitable pole clamp size as per requirement of existing PCC pole with angle iron fittings complete for 3 Ph 4 wire overhead line as per ISS and direction of EIC. Size of angle = 50mm x 50mm x 6mm long 1200mm
Supply of suitable size D type iron clamp set [galvanized] with necessary nuts, bolts, washer. Size= 3.5” x 5” long as per direction of the EIC
Supply of 3.5” x 3” porcelain shackle insulator of LTOH
Supply of Al. conductor steel reinforced [ACSR] size 6/1/2.59 [WEASEL] conforming to IS:389/1261 including loading unloading and carriage as per direction of the EIC
Fitting fixing the above pole clamp with all fittings D type iron clamp, shackle insulator fitted on pole clamp including supply of necessary nuts, bolts and washers as required for the above work as per direction
Changing of broken insulator by supplying new insulators in different position as per direction of the EIC
Painting the existing and new supplied D type iron clamp and pole clamp etc and iron angle after scraping the surface by two coats of red primer paint as per direction of the EIC
Supply and fitting fixing of hexagonal type safety device 10 SWG GI wire for LTOH line as per direction of EIC and IE rules complete
Supply and drawing of continuous earth wire from pole to pole by supplying 10 SWG wire with all necessary materials and interconnection of earth electrode as per direction of EIC and IE rules complete
Erection of PCC pole as required place for proper illumination by excavation of earth of any kind of soil of 2 M depth below GL and filling with jhama bricks to complete the job including supply of all materials as per direction of EIC (PCC pole will be supplied departmentally).
Restrengthening of existing PCC poles in different places and stay wire etc. complete as per direction.
Through checking the whole LTOH line including changing the damage materials different places i.e. bolts, nuts washer and insulator etc. complete as per direction.
Dismantling the damage stay wire set and making new stay arrangement by 7/8” SWG GI stay including supply required materials i.e. stay rod. Anchor plate etc. for stay complete as per IE rules and ISS.
Redrawing the ACSR conductor and earth wire with the same by single run after medium pressure line for proper SAG and jumper connection over insulator binding and fitting the safety device as per IE rules in different places at Kachuberia area on existing PCC pole and testing complete as per direction of the EIC
Making earthing arrangement by supplying 5/8” earth spike of 2M long with galvanized bolts, nuts and washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection from earth spike to continue running earth on the top of the PCC pole
Scraping of moss, blister etc. thorougly from both side of PCC poles above ground level by using of scraper etc. as per direction of E.I.C.
Decorative cement base paint of approved quality after scrapping the above pole surface thoroughly in different area as per direction of EIC.
Painting with ready mixed black Japan pain of approved make and brand including smoothing surface on 0.5 M. above ground level complete as per direction of E.I.C.
Painting with best quality synthetic enamel paint of approved quality all around the above P.C.C poles alternatively black and white 300 mm. 2 Nos. white shade and 1 No. black shade including smoothing surface properly.
Numbering of P.C.C. poles in different areas by erasing the existing number by paints for new number by painting block letter digits on 6 ft. (approx) above ground as per direction of E.I.C. (size of digit/letter 40 mm to 50 mm)
Carrying the all unserviceable materials from Kachuberia to Ganga Sagar Main Island by hiring of car including loading, unloading all complete as per direction of the EIC
Supply on hire basis salbollah post & erection of salbollah post of 4.88 M. long 0.10 M (Av.) dia. at different places as per direction of EIC on hire basis.
Erection of PCC pole as required places for proper illumination by excavation of earth of any kind of soil of 2 mtr depth below GL and filling with jhama bricks to complete the job including supply of all necessary materials as per direction of EIC [PCC pole will be supplied by the Department]
Carrying of 4 Nos. departmental power distribution panel board, cable from store to different controlling station and return to store including storage after mela as per direction of EIC.
Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 03.1.2022 including proper earthing arrangement complete as per direction of EIC.
Drawing the power line from generating station to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including interconnection with earthing arrangement as per IE Rules i.e. generator to elec. accessories of the temporary Controlling station.
Drawing L.T. Distribution line and feeder line from medium pressure voltage by 3 ph. 4 wire system including earthing as per I.E Rules and I.S.S. by 16 Sq. mm. to 50 Sq. mm. PVC single core wire on hire basis on PCC pole and salbollah post including supply of necessary materials required for the work complete as per direction of the EIC.
Drawing street light on the existing post from different places as per direction of EIC supplying on hire basis 40 watt. 4 ft. long tube light, choke, starter, Holder and other necessary materials required for the work complete. From 05.01.2022 to 17.01.2022 = 13 days x 250 pts.
Drawing chain light point at different points (40watt) as per direction of EIC on hire basis with supply of bulb, holder, wire etc. as required for the work complete on hire basis from 05.01.2022 to 17.01.2022 = 13 days x 500 pts.
Drawing ceiling light points at different barracks, hospital etc. Police camp etc. as per direction of EIC on hire basis with supply of 60 watt bulb, tube, holder, wire etc. as required for the work complete on hire basis from 02.01.2022 to 17.01.2022 = 16 days x 600 pts.
Drawing halogen light on existing post with supplying 500 watt lamp, fixture, wire, lamp etc. as required for the work complete on hire basis from 05.01.2022 to 17.01.2022 = 13 days x 20 pts.
Drawing of sodium vapour light fixture with 400 watt SV lamp and fixture including all other accessories on hire basis from 09-01-2022 to 15-01-2022 = 7 days x 15 nos
Drawing sodium vapour light, street light fixture with 250 watt/ 400watt/ S.V. lamp and fixture including all other accessories on hire basis
From 03.01.2022 to 04.01.2022 = 2 days x15 pts(400 watt SV)
From 05.01.2022 to 17.01.2022 = 13days x 300pts (250 watt S.V)
From 05.01.2022 to 17.01.2022 = 13days x 100pts (400 watt SV)
From 18.01.2022 to 21.01.2022 = 04 days x 20pts (400 watt SV)
Making electrical connection from generating station to L.T distribution line by supplying on hire basis, main switch, cable changeover, switch bus bar etc (reqd. size x length) and installation of panel board and proper earthing complete as per IE rules an direction of EIC.
Supply and fitting fixing of 2 pin 5 amps [for mobile chargers] and 3 pin 15 amps plug point [for spl purpose] on hire basis
Petty repairing of glow sign board with supply required size letter plastic sheet tube light, choke as required and testing fittings, fixing incl. Connection as directed on salbollah/PCC pole at different places of Kachuberia i.e. Mela office, Bus Stand, Hospital, Jetty Ghat as per direction of EIC & up to entire Mela period.
Guarding arrangement of the whole installation for the entire mela period round the clock.
Taken out the whole installation of the above items after mela period as per direction of EIC.
LIGHTING ARRANGEMENT AT BYPASS ROAD, BYPASS ROAD OF JETTY NO.5, AND JETTY NO.6 Supply on hire basis salbollah post & erection of salbollah post of 4.88 M. long 0.10 M (Av.) dia. at different places as per direction of EIC on hire basis.
Erection of PCC pole as required places for proper illumination by excavation of earth of any kind of soil of 2 mtr depth below GL and filling with jhama bricks to complete the job including supply of all necessary materials as per direction of EIC [PCC pole will be supplied by the Department]
Drawing L.T. Distribution line and feeder line from medium pressure voltage by 3 ph. 4 wire system including earthing as per I.E Rules and I.S.S. by 16 Sq. mm. to 50 Sq. mm. PVC single core wire on hire basis on PCC pole and salbollah post including supply of necessary materials required for the work complete as per direction of the EIC.
Drawing street light on the existing post from different places as per direction of EIC supplying on hire basis 40 watt. 4 ft. long tube light, choke, starter, Holder and other necessary materials required for the work complete. From 09.01.2022 to 17.01.2022 = 9 days x 200 pts.
Drawing halogen light on existing post with supplying 500 watt lamp, fixture, wire, lamp etc. as required for the work complete on hire basis from 09.01.2022 to 17.01.2022 = 9 days x 40 pts.
Drawing sodium vapour light fixture with 400 watt SV lamp and fixture including all other accessories on hire basis from 09-01-2022 to 17-01-2022 = 9 days x 20 nos
Guarding arrangement of the whole installation for the entire mela period round the clock including taken out the same after mela
EMERGENCY ILLUMINATION ARRANGEMENT AT 5 NOS JETTY AND ITS SURROUNDING AREA Drawing of metal flood light points on hire basis on different places of riverside and surrounding area of Jetty No. 1,2,3,4&5 from feeder of 400 watt metal flood fixture, lamp, control gear etc. reqd. to complete the job from 11-01-2022 to 14-01-2022 = 4 days x 40 pts.
Drawing of 250watt street light fixture in different place of jetty ghat No.1, 2, 3, 4 & 5 on hire basis of 250watt S.V. fixture ballast, 250watt S.V. lamp from 11-01-2022 to 14-01-2022 = 4 days x 50 pts.
Washing the tube well by bucket wash system with the help of 1.5” dia. G.I. Pipe, check valve and other materials on hire basis incl. lowering the tube well by engaging – skilled and unskilled labour with supply of chemicals and other necessary materials required to complete the work as per direction of E.I.C.
Installation of submersible pump motor with column pipes of length 60 ft. including all mechanical & electrical connection and outdoor type derrick arrangement complete.
Making delivery line connection with fitting fixing of sluice valve, reflux valve etc. incl. supply of nuts & bolts, rubber insertion etc. all complete.
Installation of panel board on temporary basis with supply of 32/63 amps. TPN main switch & 63 amps changeover switch on hire basis including all electrical connection complete as per direction.
Carrying of 2 nos automatic chlorinator from Sagar store to Kachuberia and return back to Ganga Sagar Store after completion of Mela
Temporary installation of positive/ swellore make chlorine dosing pump motor set with all accessories to its existing base and withdrawing the same and storage to the departmental store after Mela as per direction of the EIC
Running maintenance of the chlorine machine during mela period for proper dosing of chlorine solution including minor repairing of the pump and motor with supply of all necessary materials for the entire work from 05-01-2022 to 19-01-2022 [for 2 Nos. Machine]
Running and maintenance of submersible pump in 3 shifts (as and when required) by engaging skilled operating staff including supply of necessary materials
Bus stand- PH No.1 Zone-1 from 03.01.2022 to 17.01.2022 i.e. 15 days x 20hrs.
New tube well at bus stands from 03.01.2022 to 17.01.2022 i.e. 15 days x 20hrs.
Bakultala from 06.01.2022 to 17.01.2022 i.e. 12 days x 15hrs.
Vivekananda Sikhyatan from 05.01.2022 to 17.01.2022 i.e. 13 days x 15hrs.
Samsan Ghat from 05.01.2022 to 17.01.2022 i.e. 13 days x 15hrs.
Supply and delivery at site of Calcium Hypoclorite [Ca(OCL)₂] granules with minimum chlorine content 60% to 65% in air tight plastic container. (Make- Shree Rayalaseem Hi Strength Hypo Limited / Hind Pharma / Aquafit / PHE approved) N.B= Test certificate should be submitted at the time of delivery. Riverrine charges included
Withdrawing the above submersible pump motor set along with UPVC column pipe and other accessories by help of derrick and mannual labour after disconnection of power line as per direction.
Guarding arrangement for the whole installation of the above item for the entire mela period round the clock
Making gate structure on hire basis of size 9mtr x 18 mtr with salbollah/bamboo post including cutting in suitable size, shape, jointing cross support, vertical support and covering with cloths and making decorative design LED lighting on hire basis with different colour LED and design as per direction of the EIC. The board should have in built power circuit board connected with LED lamp suitable for operating in 230 volt 50Hz AC supply with controller etc and dismantling after completion of Mela. [Near Jrtty No. 2,3,4,5, LCT Burning Ghat and Approach to police Barrack]
Additional Lighting Supply on hire basis salbollah post & erection of salbollah post of 4.88 M. long 0.10 M (Av.) dia. at different places as per direction of EIC on hire basis.
Drawing L.T. Distribution line and feeder line from medium pressure voltage by 3 ph. 4 wire system including earthing as per I.E Rules and I.S.S. by 16 Sq. mm. to 50 Sq. mm. PVC single core wire on hire basis on PCC pole and salbollah post including supply of necessary materials required for the work complete as per direction of the EIC.
Drawing of 100W LED flood light including all other accessories on hire basis from 9.01.2022 to 16.01.2022 = 08days x 30 pts (For Ashram More)
Drawing of sodium vapour light fixture with 400 watt SV lamp and fixture including all other accessories on hire basis from 09-01-2022 to 15-01-2022 = 7 days x 30 nos (For Jetty Area, Bus Stand, Bypass road)
Providing power to the Zilla Parishad , Hanger etc Providing on hire basis main wiring with 1.1KV grade Aluminium conductor PVC/XLPE armoured cable of following size including laying in trench (at level 230mm below ground) dismantling same mending good damages.
3.5/ 4 core 120 sq.mm cable
3.5/ 4 core 50 sq.mm cable.
Carrying of dept supplied 3.5 core 50 sq.mm 500 mtr cable from Sagar store to Kachuberia site & return back after completion of mela.
Laying of the departmental supplied cable in trench (at least 230 mm below ground including the same and mending good damages.
Hiring of receiving panel, main switch, bus bar & all other necessary gadgets of required capacity as per direction of EIC. [The items includes the socketing charges of cable) for entire mela period.
Guarding the whole arrangement during mela round the clock & dismantling the same after completion of mela as per direction.
Gate Bakultala Hire and labour charges for temporary gate structure as per desighn and direction of EIC. with salbollah / bamboo post of approved size and runner, cross support, vertical support and covering with different coloured cloth and dismantling the same after completion of the mela.
Making temporary decorative lighting arrangement on both side of the gate structure on hire basis by fitting fixing at site decorative boards on salbollah / bamboo gate structures including decorative design LED lighting accessories with different colour LED lights. The board should have in built power circuit board for operating in 230 volt 50Hz AC supply with controller etc and dismantling after completion of mela.
Considering present pandemic situation actual quantity of work may differ from BOQ which shall be finalized by the EIC / competent authority in due course..
ADD GST @ 12%
B T PROJECTS PRIVATE LIMITED
M/S.S.S.ENTERPRISE
SARKAR ELECTRICAL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .