Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance KBOOMTAI SECHA PUKHURI P O BATAMORA CHARAIDEO 785670 ASSAM | CHARAIDEO | CHARAIDEO | ASSAM | 785670 | Admitted-Finance |
| 3 | Admitted-Finance DIBRUGARH ASSAM 786623 INDIA UDYAM AS 10 0000126 | DIBRUGARH | ASSAM | 786623 | Admitted-Finance |
| 4 | Admitted-Finance DHADUMIA GAON NAHARKATIA DIBRUGARH DIBRUGARH 786610 ASSAM INDIA | DIBRUGARH | DIBRUGARH | ASSAM | 786610 | Admitted-Finance |
| 5 | Admitted-Finance 777 AMAR NAGAR VILLAGE TOWN CITY RAE BARELI RAEBARELI UTTAR PRADESH 229001 INDIA | RAE BARELI | UTTAR PRADESH | 229001 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
7 Dec 2023, 2:00 pmClosed
Managing Director
Assam Gas Company Limited P.O. Duliajan, Dist. Dibrugarh, Assam. Pin-786602
TENDER FOR INSTALLATION OF 100 MM PIPELINE WITH METERING ARRANGEMENTS AT MADHUBAN
2023_ICD_34302_1
AGCL/PL/CNPL/TINGRAI GG/21/2023/20
Limited
Oil/Gas
Works
30 days
Madhuban
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
AGCL HQ Duliajan
7 Dec 2023
30 Nov 2023
7 Dec 2023
30 Nov 2023
7 Dec 2023
5 Dec 2023
1 Dec 2023 - 5 Dec 2023
5 Dec 2023
Amount
Installation of Gas Receiving Terminal inside OIL CCGS, Madhuban
Installation of 150 mm N.B. MS Pipe
Installation of 100 mm N.B. MS Pipe
Installation of 150 mm WN Flange (300 Class)
Installation of 150 mm x 100 mm N.B. MS Reducer
Installation of 150 mm N.B. MS Elbow (90°)
Installation of 100 mm N.B. MS Elbow (90°)
Installation of 150 mm N.B. MS Equal Tee
Installation of 150 mm N.B. Valve (300 Class)
Installation of 100 mm N.B. Valve (300 Class)
Installation of 100 mm N.B. Insulating Gasket
Installation of 150 mm N.B. Orifice/USM Meter with welding of WN Flanges and installation of metering instruments, etc.
Installation of 1/2" MS Socket with Needle Valve
Fabrication and Fixing of 100 mm MS Pipe Support including grouting.
Installation of RCC Pipe support including grouting
PCC works
Installation of a Steel Shade for protection of the meter from rain and sunlight
Pipeline crossing of 100 mm N.B. Pipeline
Hydrotesting of the metering arrangement at a pressure of 30 kg/sq.cm for 06 (six) hours
Nitrogen Filling and commitioning of the Metering arrangement.
Cleaning, painting overground pipelines and final site restoration works and any other miscellaneous works.
Installation of Gas Delivery Terminal at 1 No. Borpathar Gaon on AGCL's Land
Installation of 100 mm N.B. MS Pipe
Installation of 100 mm N.B. WN Flange (300 Class)
Installation of 100 mm N.B. Orifice Flange
Installation of 100 mm N.B. MS Elbow (90°)
Installation of 100 mm N.B. MS Equal Tee
Installation of 100 mm N.B. Valve (300 Class) with welding of WN Flanges.
Installation of Trasition Fitting on 100 mm N.B. Pipeline
Fabrication and Installation of Liquid Separator with other connection as per drawing ( M.S. Pipe, Flanges, valves and Stud & Nut will be supplied by AGCL. Contractor has to supply the required End Caps.)
Fabrication and Fixing of 100 mm MS Pipe Support including grouting.
Installation of RCC Pipe support including grouting
Installation of Needle Valve
Hydrotesting of the metering arrangement at a pressure of 30 kg/sq.cm for 06 (six) hours
Intallation of steel shead over the 100 mm USM meter for protecting the meter from direct sunlight and rain.
Nitrogen Filling and commissioning of the Metering arrangement.
Earth filling on the ROU of the pipeline
PCC works
100 mm N.B. MS Pipeline Laying work from CGGS, Madhuban to 1 No. Borpathar Gaon PRS Point.
Installation of 100 mm N.B. MS Pipe
Fabrication and Installation of Pig Launcher/Receiver as per drawing.
Installation of 100 mm N.B. MS Equal Tee
Installation of 100 mm N.B. Valve (300 Class) with Flanges
Preparation and installation of 100 mm N.B. Cold Bends 0 to 90°
Nullah Crossing with offset bends for 100 mm N.B. Pipe
Coating Repairing of 100 mm N.B. Pipeline
Installation of 100 mm N.B. Insulating Joint (IJ)
Pipeline crossing of 100 mm N.B. Pipeline
Nullah Crossing with casing for 100 mm N.B. Pipeline
OIL boundary wall crossing for 100 mm N.B. Pipeline
Earth filling on the ROU of the pipeline
Supply and installation of the RCC Marker Post on the ROU of the pipeline.
Air Pigging and cleaning of the newly constructed 100 mm N.B. Pipeline Portion
Hydrotesting of the entire section of the pipeline
Nitrogen Purging and commitioning of the Pipeline
M/s WELD TECH ENGINEERING
GOGI ENTERPRISES
J. M. ENGINEERING AND CO.
singh & company
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .