Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Accepted-Technical | Accepted-Technical Accepted |
| 5 | Rejected-Technical | Rejected-Technical Due to non fulfilment of technical criteria |
Tender Value
₹2.1 L
EMD Value
₹5,200
Closing Date
25 Jul 2026, 3:00 pmClosed
SA,ASI, Hampi Circle Hosapet
The Superintending Archaeologist, Archaeological Survey of India, Hampi Circle, ANANTH, Door No.203, 1st B cross,30th Ward,
MC and EW CAM Special Repairs to Hazara Ramachandra Temple (Pathway and Stone Flooring) at Kamalapur for the year 2025-26.
2026_ASI_918062_1
Sout/Hamp/kama/12 H/24121665
Limited
Civil Works
Works
30 days
Kamalapur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹5,200
Yes
11 Aug 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sub Heading 1 | |||||
| 1.01 | Earth work in excavation by manual means over area around the temple and entrance area including getting out disposal of excavated earth away from the site including transporting, loading and unloading etc., complete as per the direction of the site in-charge | 209.8 | Cum | - | - |
| 1.02 | Carefully dismantling the existing flooring after proper documentation and stacking the stones at the site, complete as per the directions of the site in charge. | 7.21 | Cum | - | - |
| 1.03 | Laying brick jelly lime concrete in the proportion of 1:2:4 (1 part lime : 2 parts sand: 4 parts brick aggregate), using 20 mm size brick aggregate, including ramming, consolidating, and levelling, complete for steps as per the directions of the site in charge. | - | Cum | - | - |
| 1.04 | Resetting the dismantled granite stone in lime mortar (1:2) over the brick jelly concrete, in their original positions, complete as per the directions of the site in charge. | 7.21 | Cum | - | - |
| 1.05 | Pointing with lime mortar in the proportion of 1:2, including curing, complete as per the directions of the Engineer-in-Charge. | 57.51 | Sqm | - | - |
| 1.06 | Carefully shifting heavy load decorative stones and pedestals (found in earth work excavation) from inside area of the temple to outside, complete as per the directions of the site in charge. | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
NITHAZARAMA.pdf
Tender Documents • 16.11 MB
BOQ_964798.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .