Loading…
Loading…
Tender Value
₹38.3 L
EMD Value
₹76,560
Closing Date
18 Sept 2026, 5:00 pmClosed
Administrator
Kalimpong Municipality Office Upper Cart Road
CONSTRUCTION OF RETAINING WALL NEAR GOBIND GOLAI DUMPING ROAD UNDER KALIMPONG MUNICIPALITY
2026_MAD_5022026_2
4/KM/ Kalimpong Town dt. 02.09.2026
Open Tender
CIVIL WORKS
Percentage
Kalimpong Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹76,560
Yes
3 Sept 2026
3 Sept 2026
21 Sept 2026
3 Sept 2026
18 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 27.5 | cum | 7,878.5 | ₹2,16,658.75 |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete | 571.75 | sqm | 392.15 | ₹2,24,211.76 |
| 3 | 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 116.37 | cum | 8,340.85 | ₹9,70,624.71 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Mild steel and Medium Tensile steel bars, 1.2% (1:1.5:3) | 109.62 | qntl. | 10,709.76 | ₹11,74,003.89 |
| 5 | Add Cost Index @ 37 % | 1 | qntl. | 9,44,910.98 | ₹9,44,910.98 |
| 6 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,
dressing of sides and bottom and backfilling with approved material (Reference to MORT&H's specification 304). | 35.39 | cum | 148.91 | ₹5,269.92 |
| 7 | Supplying and laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 185.76 | sqm | 243.21 | ₹45,178.69 |
| 8 | PLUM CONCRETE (1:3:6) Plain cement concrete of nominal mix (1:3:6 ) with coarse aggregate of which stone boulder of size 225 mm to 150mm of 60% of total dry volume to be placed in position as directed by Eng-in charge ,67% - 40 mm down single &33% - 20 mm down bazri , Coarse Sand ,Cement ( 53 grade ) mechanically mixed in 1:3:6 of rest volume and placed in position and compacted by any means as directed including cost of shuttering . | 50.21 | cum | 3,853.83 | ₹1,93,500.8 |
| 9 | Providing weep holes in Brick masonry/Plain/ reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC/PVC/HDPC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing oce. Complete as per drawing and Technical Specifications (Reference to MORT&H's specifications 2706 & 2200). | 22.82 | nos. | 148.94 | ₹3,398.81 |
| 10 | GST @ 18% | 1 | NOS | 50,226.31 | ₹50,226.31 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_5101830.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .