Tender Value
₹21.1 L
EMD Value
₹30,000
Closing Date
11 May 2022, 2:00 pmClosed
SE OMCII PARICHHA JHANSI
SE OMCII PARICHHA JHANSI
Break down maintenance of pressure parts and round the clock routine/preventive maintenance work of Boiler including oil/coal burner/igniter assembly/valves/scanner cooling fans other associated system of boiler of Unit#5 AND 6 of 2x250MW, PTPP
2022_RVUNL_688281_1
N-PARCOMC2BMD16000000089_00
Open Tender
Power/Energy Projects/Products
Item Rate
365 days
SE OMCII/BMD-I/ PARICHHA JHANSI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Dy. CAO, CFA BO PARICHHA
₹30,000
28 Jun 2022
13 Apr 2022
13 May 2022
13 Apr 2022
11 May 2022
13 Apr 2022
13 Apr 2022 - 11 May 2022
Amount
Attending tube leakage water walls tubes in boiler furnace from down comer/ring header to 50 meter including burner zone, Economizer tubes, LTSH, SCW, Re-heater tubes, Arch Tubes, screen Tubes, Final Super heater, Exit SH Tubes, Extended water wall Tubes, Ceiling Super heater tubes including platen super heater up-to Ist ten HP weld joints(irrespective of Number HP weld joints in One Frequency)
Attending tube leakage of each HP weld joints beyond 10 numbers of HP weld joints including joint of carbon steel/T-11/T-22/T-91/TPH-347 including all diameter.
Attending the leakages of hand hole plates of different pressure part header by removing hand hole plates with hand hole cutting equipment, re-welding of the same after complete preparations and stress relieving of the same after welding if required
Removal of damaged clamps/binders/scallop bars etc. and replacement /refitting of the same with new/repaired one in different zones of the pressure parts.
Fabrication of hot bends of various degrees and radius of curvature from straight pressure parts tubes by filling sand and heating gas to required temperature of Carbon steel.
Fabrication of hot bends of various degrees and radius of curvature from straight pressure parts tubes by filling sand and heating gas to required temperature of Alloy steel
Stitch welding of fines of water/ steam cool wall for securing of respective positions of tubes
Rectification /replacement of ash protector found damaged/eroded/dislocated in different pressure part zones.
Replacement of eroded/damaged shrouds of Boiler Tubes of ECONOMIZER, LTSH, SCW, SCREEN TUBE and Others TUBES of Boiler
Repairing/Reconditioning/Replacement of eroded/damaged cassette baffles of Economizer and LTSH tubes
Erection of scaffolding and platform in Platen Super heater tube above zone
Erection of scaffolding and platform in S-Panel & Bottom ash Hopper
Erection of scaffolding and platform in Reheater inlet & outlet
Erection of scaffolding and plate form in water Wall Screen tube/final super heater/super heater screen tube.
Erection of scaffolding & platform in whole zone of Platen Super heater
Build up of eroded portion of the tubes caused by ash/ steam erosion using suitable welding electrodes matching with parent metal composition. Depth of erosion up to 2.5 mm, length of erosion up to 250mm
Lifting and taking out Complete Coils in pair of LTSH horizontal coils(upper or lower) after cutting clamps supports, clits, stoppers and releasing from subsequent headers and coil and their restoration after placement of coil
Lifting and taking out Complete Coils in pair of Economizer (upper or lower) after cutting clamps supports, clits, stoppers and releasing from subsequent headers and coil and their restorastion after placement of coil
Rectification of Buck Stay/putting buck stay pin on its position in second pass of Boiler/Corner No.1,2,3,4.
Replacement of Eroded tubes/bends of pressure parts in different zones of Boiler-carbon/low alloy(T-11 and T-22) Joint
Replacement of Eroded tubes/bends of pressure parts in different zones of Boiler-Stainless Steel Joint
Internal water washing of 2nd pass of boiler
Cleaning of Economizer hopper and APH Hoppers
Cleaning and Disposal of Fly ash foreign material from pent house, dog house etc
Round the clock routine and preventive maintenance work of Boiler including oil/coal burner, igniter assly., valves, scanner cooling fans and other associated system keeping watch on abnormal sound of Ist/IInd pass, monitoring of flame & clinker formation of boiler Unit# 5 & 6 of 2x250MW, PTPP, Parichha (One job consists of 24 hrs-03 shift of 8 hours per unit of 2x250MW)
System line up for filling of feed water through boiler feed pump for hydraulic test of boiler and normalization of the same after hydraulic test making the system ready for boiler light–up in unit no. 5&6 of 2x250MW, PTPP, Parichha.
U.S.Enterprises
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .