Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.3 CrAccepted-AOC HOUSE NO 953 SECTOR 23 HUDA BHIWANI TEHSIL AND DISTRICT BHIWANI | BHIWANI | BHIWANI | HARYANA | ₹5.3 Cr | 1 | Accepted-AOC lowest |
| 2 | 2₹6.3 Cr+₹97.5 L (18.4%)Rejected-AOC H NO 1100 SECTOR 3 124001 | ROHTAK | HARYANA | 124001 | ₹6.3 Cr+₹97.5 L (18.4%) | 2 | Rejected-AOC Higher |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical 858 SECTOR 23 127021 2021R109 | BHIWANI | HARYANA | 127021 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical CHARKHI DADRI | CHARKI DADRI | HARYANA | 127022 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.6 Cr
EMD Value
₹9.3 L
Closing Date
26 Dec 2024, 3:00 pmClosed
SUNIL RANGA
Bhiwani PHED No. 1
Raw water arrangement ,construction of independent canal based water works and distribution system of balance streets in village Rajgarh, Nawa and Nawa ki Dhanies
2024_HRY_417090_1
2024B5F860FE 22B6 4056 8125 F2DEFAEB0D35553PUH
Open Tender
Civil Works
Works
500 days
NAWA RAJGARH
as per approved CBD
2 documents required · 2 mandatory
₹15,000
Yes
₹9.3 L
Yes
10 Feb 2025
12 Dec 2024
26 Dec 2024
12 Dec 2024
26 Dec 2024
12 Dec 2024
RAW WATER PUMP: Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked 5000 LPM x 40.00 m Head
Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water pump as per the indicated requirements of discharge in 2700 LPM x12 mtr head and power capacity in BHP Make: KSB, CRI, Kirtosker, Crompton Greeve, Lubi)
(i) Operation and maintenance Defect liability period ( Operation only ) after 3 Months trail period
(ii) Operation and maintenance during 1st year after defect liability period
(iii) Operation and maintenance during the 2nd year
(iv) Operation and maintenance during the 3rd year
(v) Operation and maintenance during the 4th year
(vi) Operation and maintenance during the 5th year
Kulbir Singh Contractor (BID ID -1190297)
Kulbir Singh Contractor (BID ID -1190297)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .