Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹40.9 LAdmitted-Finance SHOP NO 2 RANJIT STUDIO FIRST FLOOR G BLOCK DADASAHEB PHALKE ROAD DADAR EAST MUMBAI MUMBAI MAHARASHTRA 400014 | MUMBAI | MAHARASHTRA | 400014 | +15.00% | ₹40.9 L | L1 | Admitted-Finance |
| 2 | L2₹44.4 L+₹3.6 L (8.70%)Admitted-Finance | +25.00% | ₹44.4 L+₹3.6 L (8.70%) | L2 | Admitted-Finance |
| 3 | L3₹46.9 L+₹6.0 L (14.8%)Admitted-Finance | +32.00% | ₹46.9 L+₹6.0 L (14.8%) | L3 | Admitted-Finance |
| 4 | L4₹47.6 L+₹6.8 L (16.5%)Admitted-Finance | +34.00% | ₹47.6 L+₹6.8 L (16.5%) | L4 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
12 Jun 2026, 10:30 amClosed
DGM (Contract Cell)
Contract Cell Dept., Admin. Bldg., RCF Thal Factory, Alibag, Raigad - 402208
CONTRACT FOR CONSTRUCTION OF SHED OVER TERRACE OF VARIOUS BUILDINGS IN TAE AT RCF THAL
2026_RCFL_909830_1
TH/CC/89282/26/D24-05(V)/306
Open Tender
Civil Works
Works
548 days
RCF Thal, Alibag
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹75,000
Yes
21 Sept 2026
22 May 2026
12 Jun 2026
22 May 2026
12 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PREPARATION AND SUBMISSION OF DESIGN FOR SHED OVER COOLING TOWER MECHANICAL STORAGE ROOM AND CAR PARKING SHED WITH RESPECT TO EXISTING BUILDING STRUCTURES/SITE CONDITIONS AND SUBMISSION OF DETAILED STRUCTURAL STEEL FABRICATION/SHOP DRAWINGS AND LAYOUTS IN CONSULTATION WITH RCF. | 1 | Lump-sum | 4,500 | ₹4,500 |
| 2 | CHECKING AND FINALIZATION OF EXISTING AVAILABLE DRAWINGS FOR DESIGN FOR POTASSIUM STORAGE BUILDING AND COOLING TOWER MCC ROOM SHEDS WITH RESPECT TO EXISTING BUILDING STRUCTURES/SITE CONDITIONS AND SUBMISSION OF DETAILED STRUCTURAL STEEL FABRICATION/SHOP DRAWINGS AND LAYOUTS IN CONSULTATION WITH RCF. | 1 | Lump-sum | 2,000 | ₹2,000 |
| 3 | STABILITY CERTIFICATION OF THE NEWLY CONSTRUCTED SHEDS (SHED OVER TERRACES OF POTASSIUM STORAGE BUILDING, COOLING TOWER MECHANICAL STORAGE ROOM AND COOLING TOWER MCC ROOM WITH PROVISION OF CAR PARKING SHED), AS PER RCF'S PROFORMA AFTER COMPLETION OF CONSTRUCTION. | 1 | Lump-sum | 3,000 | ₹3,000 |
| 4 | EXCAVATION BY MECHANICAL MEANS FOR FOUNDATION IN EARTH,SOIL OF ALL TYPES,SAND, GRAVEL AND SOFT MURUM, INCLUDING REMOVING THE EXCAVATED MATERIAL UP TO A DISTANCE OF 50M BEYOND THE BUILDING AREA AND STACKING AND SPREADING AS DIRECTED, DEWATERING, PREPARING THE BED FOR THE FOUNDATION AND NECESSARY BACKFILLING, RAMMING, WATERING INCLUDING SHORING AND STRUTTING ETC. COMPLETE. (LIFT UPTO 0.00 TO 1.50 M). | 8.3 | CUM | 207 | ₹1,718.1 |
| 5 | EXCAVATION BY MANUAL MEANS FOR FOUNDATION IN EARTH,SOIL OF ALL TYPES,SAND, GRAVEL AND SOFT MURUM, INCLUDING REMOVING THE EXCAVATED MATERIAL UP TO A DISTANCE OF 50M BEYOND THE BUILDING AREA AND STACKING AND SPREADING AS DIRECTED, DEWATERING, PREPARING THE BED FOR THE FOUNDATION AND NECESSARY BACKFILLING, RAMMING, WATERING INCLUDING SHORING AND STRUTTING ETC. COMPLETE. (LIFT UPTO 0.00 TO 1.50 M). | 4.1 | CUM | 239 | ₹979.9 |
| 6 | REMOVAL AND CARRIAGE OF SURPLUS EXCAVATED EARTH, DEBRIS, DISMANTLED MATERIALS ETC., FROM THE SITE OF WORK TO OTHER AREAS ANYWHERE WITHIN THE FACTORY UP TO 3 KM / PLANT BATTERY LIMITS BEYOND THE INITIAL LEAD OF 50M AND SPREADING THE SAME INCLUDING LOADING AND UNLOADING AS PER THE DIRECTION OF ENGINEER-IN-CHARGE. | 12.3 | Cu.M | 220 | ₹2,706 |
| 7 | PROVIDING AND LAYING DRY / TRAP / GRANITE / QUARTZITE / GNEISS RUBBLE STONE SOLING 15 TO 20 CM THICK INCLUDING HAND PACKING & COMPACTING ETC. COMPLETE AS DIRECTED. | 8.3 | Cu.M | 1,382 | ₹11,470.6 |
| 8 | DISMANTLING BRICK MASONRY IN LIME OR CEMENT MORTAR AND STACKING THE MATERILS AS DIRECTED WITH ALL LEADS, LIFTS ETC. | 8.3 | Cu.M | 335 | ₹2,780.5 |
| 9 | DISMANTLING STONE MASONRY IN LIME OR CEMENT MORTAR INCLUDING STACKING THE MATERILS AS DIRECTED WITH ALL LEADS, LIFTS ETC. | 4.1 | Cu.M | 380 | ₹1,558 |
| 10 | REMOVING LIME OR LEAN CEMENT CONCRETE INCLUDING STACKING THE SPOILS AS DIRECTED WITH ALL LEADS, LIFTS ETC, COMPLETE. | 4.1 | Cu.M | 558 | ₹2,287.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.37 MB
BOQ_956242.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .