Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.2 CrAdmitted-Finance 4TH FLOOR PLOT NO 814 UDHYOG VIHAR PHASE V GURGAON HARYANA 122016 | GURUGRAM | HARYANA | 122016 | ₹97.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹102 CrAdmitted-Finance | ₹102 Cr | L2 | Admitted-Finance |
| 3 | L3₹110.0 CrAdmitted-Finance | ₹110.0 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Non-Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Non-Responsive |
| Sl No | Description | Qty | Unit | M/s Skylark Infra Engineering Pvt. Ltd. L1 | M/s.Naagaamii Infratech Private Limited L2 | KRISHI INFRATECH L3 |
|---|---|---|---|---|---|---|
| 1.00 | Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29)
and NH-39 (New NH-02) from Design Km 21.00 to design Km 32.00 [Design Length – 11.00 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package III) | 1 | Lumpsum | 97,21,77,777 ₹97.2 Cr | 1,02,00,00,000 ₹102 Cr | 1,09,99,99,599 ₹110.0 Cr |
Tender Value
₹127.2 Cr
Closing Date
6 Aug 2020, 11:00 amClosed
A K JHA
Deputy General Manager (Technical) National Highways and Infrastructure Development Corporation Limited (NHIDCL) 3rd Floor, PTI Building, 4, Parliament Street, New Delhi-110001
Construction of 2 lane with paved shoulder of Kohima-Bypass Roadconnecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 21.00 to design Km 32.00 in the state of Nagaland Under SARDP-NE on EPC Mode Pkg3
2020_NHIDC_561284_1
NHIDCL/Nagaland/Civil Work/Kohima Bypass/Pkg3
Open Tender
Civil Works
548 days
Nagaland
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,600
MD NHIDCL
Exempted
NHIDCL HQ
24 Aug 2020
27 May 2020
7 Aug 2020
27 May 2020
6 Aug 2020
20 Jul 2020
27 May 2020 - 5 Jun 2020
12 Jun 2020
Amount
Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 21.00 to design Km 32.00 [Design Length – 11.00 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package III)
M/s.Naagaamii Infratech Private Limited
KRISHI INFRATECH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
PlanAndProfile.pdf
Tender Documents • 5.41 MB
TCS_BridgeGAD.pdf
Tender Documents • 2.67 MB
Schedules.pdf
Tender Documents • 2.72 MB
MainReport.pdf
Tender Documents • 10.09 MB
RFP.pdf
Tender Documents • 1.90 MB
DCA.pdf
Tender Documents • 1.66 MB
CostSummary.pdf
Tender Documents • 0.19 MB
BOQ_588969.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid