| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.8 LAdmitted-Finance | -1.00% | ₹17.8 L | L1 | Admitted-Finance |
| 2 | L2₹18.4 L+₹63,778.62 (3.59%)Admitted-Finance | +2.55% | ₹18.4 L+₹63,778.62 (3.59%) | L2 | Admitted-Finance |
| 3 | L3₹20.0 L+₹2.2 L (12.6%)Admitted-Finance | +11.51% | ₹20.0 L+₹2.2 L (12.6%) | L3 | Admitted-Finance |
Tender Value
₹18.0 L
EMD Value
₹35,920
Closing Date
25 Jun 2026, 6:00 pmClosed
GM RSRDC LTD JAIPUR
GM RSRDC LTD SETU BHAWAN, JHALANA DOONGARI, JAIPUR
Construction of Toilet Block at Challa and Dujod Toll Plaza on Kotputli Sikar Kuchaman Road
2026_RSRDC_568404_1
RSRDCC NIT 165/2026-27 Dated 15.06.2026 Sl No 1
Open Tender
Civil Works
Percentage
30 days
Kotputli Sikar Kuchaman Road
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹590
PD RSRDC UNIT SIKAR THROUGH NEFT/RTGS/IMPS
₹35,920
2 Jul 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
25 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 77.77 | Cum | 178 | ₹13,843.2 |
| 2 | Providing and injection Chloropyrifous Emulsifiable concentrate 20 % with 1 % concentration for PRE-CONSGTRUCTIONAL Anti termite treatment as per IS 6313 part III and amended from time to time and creating a continous chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor along the external perimeter of building expansion joints, over the top surface of consolidated earth of which aproch is to be laid surrounding of pipes and conduits etc. complete as per specification (Plinth floor area only shall be measured for payment.) | 61.75 | Sqm | 47 | ₹2,902.34 |
| 3 | Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth level1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).( Used banas / Bikaner sand ) For wall thickness 300 mm (including Columns ) | 21.09 | Cum | 3,302 | ₹69,637.69 |
| 4 | Random Rubble stone masonary for foundation and plinth in Cement Sand Mortar above 30 Cm. thick wall in :Cement Mortar 1:6 (1-Cement:6-Sand).For First Step foundation | 65.08 | Cum | 2,838 | ₹1,84,684.84 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing compaction finishing with rendering in cement sand mortar 1:3 (1-Cement:3-coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. All work up to plinth level :M25 | 3.16 | Cum | 5,003 | ₹15,822.49 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth , consolidating each deposited layer by ramming and watering including lead upto 50Mtr. and lift upto 1.5Mtr. | 42.45 | Cum | 64 | ₹2,716.6 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs, girders having slopes up to 15o , landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases, up to floor three level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1-Cement:3-coarse sand) and making good and joints excluding the cost of centering, shuttering and reinforcement: ) 1:1:5:3 ( 1-Cement : 1:5 coarse sand:3-graded stone aggregate 20mm nominal size)M-25 | 14.23 | Cum | 5,254 | ₹74,778.32 |
| 8 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor three level. Tremo Mechanically Treated bars | 1,913 | Kg | 77 | ₹1,47,301 |
| 9 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways withSteel Props and removal of formwork for superstructure up to Floor Fifth level above plinth, for: :Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands , coping, bed plates, anchor blocks, sills, chhajjas lintel, beam etc. | 114.53 | Sqm | 340 | ₹38,939.52 |
| 10 | Brick masonary with mechanised autoclaved flyash lime brick conforming to 12894 ; 2002 of class desigation 100 in Floor Fifth level : Cement Mortar 1:6 (1-Cement:6-coarse sand). | 35.66 | Cum | 4,645 | ₹1,65,636.98 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
agrement.pdf
Tender Documents • 0.45 MB
AnnexureABCD_RTPPAct2012_AnnexureC.pdf
Tender Documents • 0.10 MB
AccountDetails.pdf
Tender Documents • 0.22 MB
BOQ_1011199.xls
BOQ • 0.34 MB
various_Circulars_orders.pdf
Tender Documents • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .