Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
17 Jun 2026, 5:30 pm
Cheif Construciton Engineer
O/o the CCE RW Circle, Sunabeda
Road
2026_CERWI_148016_141
NCB-03/RWCSBD/2026-2027
Open Tender
Civil Works - Roads
270 days
Sunabeda
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹3.4 L
O/o the CCE RW Circle, Sunabeda
1 Jun 2026
1 Jun 2026
18 Jun 2026
1 Jun 2026
17 Jun 2026
1 Jun 2026
1 Jun 2026 - 16 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202
Below foundation | 114.12 | Cum | 433.19 | ₹49,435.64 | - |
| 2 | Slab | 13.86 | Cum | 662.19 | ₹9,177.95 | - |
| 3 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 11,160 | Sqm | 2.29 | ₹25,556.4 | - |
| 4 | Earth work in all kinds soil or ordinary soil in embankment, roads with M.D.D. not less than 1.44gm/1.65gm per cc upto 3mtr high & top 0.5mtr below sub-grade level respectively with initial lead & lift from borrow pit 5m. away from the toe line of final section including rough dressing , breaking clods to maximum 5cm to 7cm & laying in layers not exceeding 0.23m in depth etc. including removing all debrises & benching old embankment complete (As per item 2(d) of AR-2006 Page-3).
With mechanical lead upto 1000m | 6,075.1 | Cum | 254.48 | ₹15,45,991.45 | - |
| 5 | Earthwork in excavation for foundation of structures in all types of soil as per drawing and technical specification Clause 305 and 1104 of MoRD includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead & lift, dressing of sides and bottom and back filling with excavated suitable material upto 3mt. as per direction of Engineer-in-Charge. | 19.5 | Cum | 57.92 | ₹1,129.44 | - |
| 6 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 252.74 | Cum | 50.46 | ₹12,753.26 | - |
| 7 | Fine dressing and turfing including transportation by mechanical means with all lead and lift and placing of turf in position and ramming with thapies and including watering and cost of all labour, materials etc. complete as per Clause 309 of MORD Specification and as per direction of the Engineer in Charge. | 6,376 | Sqm | 22.59 | ₹1,44,033.84 | - |
| 8 | Providing and constructing well compacted drainage layer above the subgrade of roadwork with approved quality of dust free washed coarse to medium sand as per Clauses 5.8 and 6.6 of SP:20-2002. | 7.8 | Cum | 879.4 | ₹6,859.32 | - |
| 9 | Providing concrete for plain / reinforced concrete in open foundation complete as per drawing and MORD technical specification Clause 800,1100,1200 and as per direction of Engineer-in-Charge. | 17.94 | Cum | 5,838.79 | ₹1,04,747.89 | - |
| 10 | Providing Construction of granular sub-base Gr-III by providing well graded material, spereading in uniform layers with tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Technical Specification clause 401 and as per direction of Engineer in Charge. | 1,259.75 | Cum | 1,520.59 | ₹19,15,564.77 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
Tendernotice_2.pdf