| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC lowest value |
| 2 | L2₹1.3 CrRejected-Finance | ₹1.3 Cr | L2 | Rejected-Finance Reject |
| 3 | L3₹1.3 CrRejected-Finance | ₹1.3 Cr | L3 | Rejected-Finance Reject |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | PAS AND Co L1 | Prabhavathi L2 | SIVA KUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00IMPROVEMENT AND MAINTENANCE WORKS FROM THATHUKKANAHALLI TO SELUR (AMMAPALAYAM) FOREST ROAD (EXISTING BT ROAD) FOREST ROAD IN AMMAPALAYAM RF OF DHARMAPURI FOREST DIVISION, DHARMAPURI, DURING 2025-2026 - KM 0/000 - 2/000 | ||||||
| 2.00 | Clearing and Grubbing by Light Jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete. | 2,160 | Sqm | 9.65 ₹20,844 | 9 ₹19,440 Lowest | 9 ₹19,440 Lowest |
| 3.00 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton hard red earth shales, murram gravel stoney earth and earth mixed with small size boulders as per SS20B for FORMATION OF EARTHERN DRAIN & EMBANKMENT CUTTING as per MORT&H | 425.25 | Cum | 184.65 ₹78,522.41 | 172 ₹73,143 Lowest | 174 ₹73,993.5 |
| 4.00 | Picking the existing BT surface up to 50 mm thick depth etc complete as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed for the work and including all other incidental charges etc., complete as per MORTH Specification. | 2,263.75 | Cum | 25 ₹56,593.75 Lowest | 30 ₹67,912.5 | 31 ₹70,176.25 |
| 5.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet mix macadam specification including premixing the materials with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub base course on well prepared surface and compacting with Vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 406 of MORTH Rev-5. | 1,018.69 | Cum | 3,250 ₹33,10,742.5 Lowest | 3,317 ₹33,78,994.73 | 3,353 ₹34,15,667.57 |
| 6.00 | Providing and laying Prime Coat over WMM surface using 7 Kgs of Emulsion Bitumen (SS I) for 10sqm for preparatory to another Bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5. | 6,791.25 | Sqm | 80 ₹5,43,300 Lowest | 99 ₹6,72,333.75 | 100 ₹6,79,125 |
| 7.00 | Providing and laying Tack Coat over WMM surface (treated with primer) using 2.5kgs Bitumen Emulsion (RS I) for preparatory to another Bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5. | 6,791.25 | Sqm | 18 ₹1,22,242.5 Lowest | 21 ₹1,42,616.25 | 21 ₹1,42,616.25 |
| 8.00 | Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kg of VG30 bitumen for premixing per 10sqm including coat and conveyance of all materials to CMP site including heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 tones capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, paver finisher/ 9m paver finisher, Vibratory roller and all other Tools and plants required, including fuel and all other and incidental charges etc., complete as per Specification using CMP as per clause 504 of MORTH rev-5. | 339.57 | Cum | 8,800 ₹29,88,216 Lowest | 10,267 ₹34,86,365.19 | 10,377 ₹35,23,717.89 |
| 9.00 | Bituminous Concrete (Table 500-17) :Providing and laying bituminous concrete of required thickness with central hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision complete in all respects - Grading II | 203.74 | Cum | 7,900 ₹16,09,546 Lowest | 13,122 ₹26,73,476.28 | 13,263 ₹27,02,203.62 |
| 10.00 | Providing and laying earth for Making up berms using carted earth of lead 5 kms including labour charges for spreading, hire and fuel charges for all T & P employed etc., complete as directed by the departmental officers for filling labour charges | 540 | Cum | 316.74 ₹1,71,039.6 | 295 ₹1,59,300 Lowest | 298 ₹1,60,920 |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
5 Mar 2026, 3:00 pmClosed
The District Forest Officer, Dharmapuri
District Forest Office, Dharmapuri Forest Division
Improvement and maintenance works from Thathukkanahalli to Selur (Ammapalayam) Forest Road (existing bt road) forest road in Ammapalayam RF of Dharmapuri Forest Division, Dharmapuri, from km 0/000 - 2/000during 2025-2026
2026_TNFD_666783_1
Roc.No.5639/2025/D1 P01
Open Tender
Civil Works
Item Rate
90 days
District Forest Office, Dharmapuri Forest Division
Can be seen in the tender documents
5 documents required · 5 mandatory
₹0
₹1.4 L
17 Aug 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
5 Mar 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | IMPROVEMENT AND MAINTENANCE WORKS FROM THATHUKKANAHALLI TO SELUR (AMMAPALAYAM) FOREST ROAD (EXISTING BT ROAD) FOREST ROAD IN AMMAPALAYAM RF OF DHARMAPURI FOREST DIVISION, DHARMAPURI, DURING 2025-2026 - KM 0/000 - 2/000 | - | - | - | - |
| 2 | Clearing and Grubbing by Light Jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete. | - | Sqm | - | - |
| 3 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton hard red earth shales, murram gravel stoney earth and earth mixed with small size boulders as per SS20B for FORMATION OF EARTHERN DRAIN & EMBANKMENT CUTTING as per MORT&H | - | Cum | - | - |
| 4 | Picking the existing BT surface up to 50 mm thick depth etc complete as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed for the work and including all other incidental charges etc., complete as per MORTH Specification. | - | Cum | - | - |
| 5 | Providing and laying, spreading and compacting graded stone aggregates to Wet mix macadam specification including premixing the materials with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub base course on well prepared surface and compacting with Vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 406 of MORTH Rev-5. | - | Cum | - | - |
| 6 | Providing and laying Prime Coat over WMM surface using 7 Kgs of Emulsion Bitumen (SS I) for 10sqm for preparatory to another Bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5. | - | Sqm | - | - |
| 7 | Providing and laying Tack Coat over WMM surface (treated with primer) using 2.5kgs Bitumen Emulsion (RS I) for preparatory to another Bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5. | - | Sqm | - | - |
| 8 | Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kg of VG30 bitumen for premixing per 10sqm including coat and conveyance of all materials to CMP site including heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 tones capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, paver finisher/ 9m paver finisher, Vibratory roller and all other Tools and plants required, including fuel and all other and incidental charges etc., complete as per Specification using CMP as per clause 504 of MORTH rev-5. | 1 | Cum | - | - |
| 9 | Bituminous Concrete (Table 500-17) :Providing and laying bituminous concrete of required thickness with central hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 111, 112, 501, 507 & 900 of MORTH vth Revision complete in all respects - Grading II | - | Cum | - | - |
| 10 | Providing and laying earth for Making up berms using carted earth of lead 5 kms including labour charges for spreading, hire and fuel charges for all T & P employed etc., complete as directed by the departmental officers for filling labour charges | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Tender_Document.pdf
Tender Documents • 0.42 MB
BOQ_800992.xls
BOQ • 0.29 MB
Corrigendum_Thathukkanahalli_Ammapalayam.pdf
PDF • 0.16 MB
Corrigendum_Thathukkanahalli_Ammapalayam.pdf
PDF • 0.16 MB
Corrigendum_No6_Thathukkanahalli_to_Ammapalayam.pdf
PDF • 0.04 MB
2026_TNFD_666783_1.pdf
PDF • 0.03 MB
Corrigendum_666783.pdf
PDF • 0.17 MB
2026_TNFD_666783_1.pdf
PDF • 0.03 MB
Corrigendum_666783.pdf
PDF • 0.05 MB
Corrigendum_666783.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].